Council planning record

Erection of detached, single storey buildiing

Bright Horizons Day Nursery, Pomeroy Crescent, Hedge End, SO30 2LF

Decided PermitReference: F/25/99364Eastleigh Borough Council

Last published check: 22 Sept 2026, 03:45. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
12 May 2025
Validated
12 May 2025
Determination deadline
14 Aug 2025
Local authority
Eastleigh Borough Council

Application overview

Erection of detached, single storey buildiing

Proposal details

Reference
F/25/99364
Alternative references
13972625 manual download
Ward
Hedge End North Ward
Parish
Hedge End CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Bright Horizons Day Nursery, Pomeroy Crescent, Hedge End, SO30 2LF

This record has no verified map location.

Documents 20 of 20

DocumentPublishedAction
Delegated Officer Report - f_25_99364Officer Report · PDF5 Aug 2025View
F_25_99364 PL_Final DecisionDecision Notice · PDF5 Aug 2025View
EcologyConsultee Response · PDF31 Jul 2025View
BrightHorizon BNG MetricSupporting Info21 Jul 2025View
1532-39r1 Drainage StrategySupporting Info · PDF21 Jul 2025View
Bright Horizon HMMP FinalSupporting Info · PDF21 Jul 2025View
Bright Horizon Nursery PEA FINAL-compressedSupporting Info · PDF21 Jul 2025View
Tree OfficerConsultee Response · PDF10 Jun 2025View
HighwaysConsultation Response · PDF30 May 2025View
Town CouncilConsultation Response29 May 2025View
Ecology OfficerConsultee Response · PDF27 May 2025View
Proposed Garden Building ElevationsElevations Plan · PDF12 May 2025View
Planning Design and Heritage Statement_RedactedPlanning Statement · PDF12 May 2025View
Arboricultural Impact Assessment and Preliminary Method StatementTree Info · PDF12 May 2025View
Proposed Garden Building PlanPlan · PDF12 May 2025View
Transport NoteTransport Assessment · PDF12 May 2025View
Existing Site and Location PlanPlans · PDF12 May 2025View
Proposed Garden Building Roof PlanRoof Plan · PDF12 May 2025View
Application Form RedactedApplication Form · PDF12 May 2025View
Proposed Site Plan 109_09-05-2025 (1)Site Layout Plan · PDF12 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_99364 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be carried out in accordance with the following approved plans: Existing Site and Location Plan – Drawing No. 4575 101.9 rev 13 (dated 7th May 2025) Proposed Garden Plan – Drawing No. 4575 109 rev 13 (dated 7th May 2025) Proposed Garden Building Floor Plan – Drawing No. 4575 112 rev 12 (dated 1st April 2025) Proposed Garden Building Roof Plan – Drawing No. 4575 113 rev 12 (dated 1st April 2025) Proposed Garden Building Elevations – Drawing No. 4575 114 rev 12 (dated 1st April 2025) Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted must be begun within a period of three years beginning with the date on which this permission is granted. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed on the approved plans. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  4. No development shall start on site until a construction site management plan has been submitted to and approved in writing by the Planning Authority, which shall include: A programme of and phasing of demolition (if any) and construction work;The provision of long term facilities for contractor parking;The arrangements for deliveries associated with all construction works, taking into account school / nursery drop off and pick up times;Access and egress for plant and machinery;Protection of pedestrian routes during construction;Location of temporary site buildings, compounds, construction material, and plant storage areas; Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  5. No construction or demolition work must take place except between the hours 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings
  6. The development hereby permitted shall accord with the arboricultural report reference NLE/1050_300_B. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  7. Note to Applicant: Please note the following Ecological Notes; In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works. Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August). If this is not possible then vegetation can be cleared only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest. Any excavations or open pipes will need to be covered at night, or provided with a small animal escape ramp (a rough board at a shallow angle) to allow animals to escape if they fall in. If animals are found on site, they should not be handled but must be allowed to move away to safety on their own.
  8. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  9. Environment Act 2021 The development shall adhere to the South Cost Ecology Habitat Management and Monitoring Plan (HMMP) (dated 16/07/25) which has been submitted and approved by the Local Planning Authority in accordance with paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990 and shall be implemented in accordance with the approved details in the first planting season following completion of development. Thereafter the habitats shall be managed and maintained in accordance with the approved details for a minimum period of 30 years following completion. Notice in writing shall be given to the Local Planning Authority when the: a) habitat creation and enhancement works as set out in the HMMP have commenced, and b) habitat creation and enhancement works as set out in the HMMP have been completed. Monitoring reports shall be submitted to the Local Planning Authority in writing in accordance with the methodology and frequency specified the approved Habitat Management and Monitoring Plan. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 of the Eastleigh Borough Local Plan 2016 – 2036 and to accord with the Environment Act 2021, Schedule 14.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.