The development hereby permitted shall be implemented in accordance with the following plans numbered: 2438-02-01A, 2438-02-02, 2438-02-03, 2438-02-04, 2438-02-05 and 2438-02-06 Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those listed on the application form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The development must accord with the arboricultural method statement by Arbor-Eco Consultancy (reference MB250116, dated 17th February 2025)). No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason :To retain and protect the existing trees which form an important part of the amenity of the locality.
A watching brief shall be followed at all times during construction works and confirmation of this shall be submitted to the Local Planning Authority (LPA) before the development is brought into use. In the event that previously unidentified contamination is found during the watching brief it must be immediately reported to the Local Planning Authority. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, has been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required by the Local Planning Authority, the development shall not be brought into use until a verification report for the remediation work has been submitted to and approved in writing by the Local Planning Authority. All works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
The development hereby permitted shall not be brought into use until the location of the bat and bird boxes have been submitted to and approved in writing by the Local Planning Authority and installed on the site in accordance with the approved details. The development shall be carried out in accordance with the ecological appraisal report by Hampshire Ecological Services Ltd (dated June 2025) and all enhancements shall be in place by the end of the first planting season following completion of the development and thereafter retained. Reason: To protect and enhance biodiversity
Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2025), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.