Council planning record

Single storey modular nursery building

HAMBLE COMMUNITY SPORTS COLLEGE, SATCHELL LANE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4NE

Decided PermitReference: F/25/99088Eastleigh Borough Council

Last published check: 22 Sept 2026, 03:55. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
19 Mar 2025
Validated
8 May 2025
Determination deadline
3 Jul 2025
Local authority
Eastleigh Borough Council

Application overview

Single storey modular nursery building

Proposal details

Reference
F/25/99088
Alternative references
13678941 manual d/l
Ward
Bursledon & Hound North Ward
Parish
Hamble-le-Rice CP
Agent
ACM Architects Ltd (Mr Alan MacLean)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

HAMBLE COMMUNITY SPORTS COLLEGE, SATCHELL LANE, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4NE

This record has no verified map location.

Documents 21 of 21

DocumentPublishedAction
F_25_99088 PL_Final DecisionDecision Notice · PDF27 Jun 2025View
ReportOfficer Report · PDF27 Jun 2025View
Construction Phase Plan Commercial Build_RedactedSupporting Documents · PDF24 Jun 2025View
Ecology OfficerConsultee Response · PDF10 Jun 2025View
Ecological AppraisalEcological Assessment · PDF6 Jun 2025View
Additional supporting statement · PDF6 Jun 2025View
Tree OfficerConsultee Response · PDF3 Jun 2025View
Ecology OfficerConsultee Response · PDF22 May 2025View
Environmental HealthConsultation Response20 May 2025View
HighwaysConsultation Response · PDF15 May 2025View
AMENDED Site and Location PlansPlans · PDF8 May 2025View
Original Building PlanPlan · PDF8 May 2025View
Original Elevations PlanElevations Plan · PDF8 May 2025View
Applicants Statement (need, car parking and parents travel)Planning Statement · PDF8 May 2025View
Existing Site LayoutSite Layout Plan · PDF8 May 2025View
Elevations with Existing BuildingElevations Plan · PDF8 May 2025View
Drawings of Existing Nursery UnitIllustration · PDF8 May 2025View
Arboricultural Method Statement.Tree Info · PDF19 Mar 2025View
Application Form RedactedApplication Form · PDF19 Mar 2025View
Proposed Ground Floor PlanFloor Plan · PDF19 Mar 2025View
Proposed ElevationsElevations Plan · PDF19 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_99088 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 2438-02-01A, 2438-02-02, 2438-02-03, 2438-02-04, 2438-02-05 and 2438-02-06 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those listed on the application form. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. The development must accord with the arboricultural method statement by Arbor-Eco Consultancy (reference MB250116, dated 17th February 2025)). No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason :To retain and protect the existing trees which form an important part of the amenity of the locality.
  5. A watching brief shall be followed at all times during construction works and confirmation of this shall be submitted to the Local Planning Authority (LPA) before the development is brought into use. In the event that previously unidentified contamination is found during the watching brief it must be immediately reported to the Local Planning Authority. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, has been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required by the Local Planning Authority, the development shall not be brought into use until a verification report for the remediation work has been submitted to and approved in writing by the Local Planning Authority. All works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
  6. The development hereby permitted shall not be brought into use until the location of the bat and bird boxes have been submitted to and approved in writing by the Local Planning Authority and installed on the site in accordance with the approved details. The development shall be carried out in accordance with the ecological appraisal report by Hampshire Ecological Services Ltd (dated June 2025) and all enhancements shall be in place by the end of the first planting season following completion of the development and thereafter retained. Reason: To protect and enhance biodiversity
  7. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2025), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.