Council planning record

Erection of 1no. five bed dwelling in rear garden with detached garage, amenity space, parking and shared access off Pylands Lane (re submission of F/24/98257)

SWINLEY, PYLANDS LANE, BURSLEDON, SOUTHAMPTON, SO31 1BH

Decided PermitReference: F/25/98851Eastleigh Borough Council

Last published check: 27 Sept 2026, 17:09. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
3 Feb 2025
Validated
12 Feb 2025
Determination deadline
17 Apr 2025
Local authority
Eastleigh Borough Council

Application overview

Erection of 1no. five bed dwelling in rear garden with detached garage, amenity space, parking and shared access off Pylands Lane (re submission of F/24/98257)

Proposal details

Reference
F/25/98851
Alternative references
13744875 13996537
Ward
Bursledon & Hound North Ward
Parish
Hedge End CP
Agent
BPS Design Consultants Ltd (Mr Robert Narramore)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

SWINLEY, PYLANDS LANE, BURSLEDON, SOUTHAMPTON, SO31 1BH

This record has no verified map location.

Documents 32 of 32

DocumentPublishedAction
Application Form REDACTEDNonmaterial Minor Amendment · PDF23 Jun 2026View
Proposed Floor and Elevation Plans, Roof Plan for Non Material AmendmentNonmaterial Minor Amendment · PDF23 Jun 2026View
Proposed Floor and Elevations PlansNonmaterial Minor Amendment · PDF8 Jan 2026View
Proposed Block PlanNonmaterial Minor Amendment · PDF8 Jan 2026View
Application Form RedactedNonmaterial Minor Amendment · PDF7 Jan 2026View
F_25_98851 Decision notice informative leaflet - PERMITDecision · PDF10 Apr 2025View
Officer ReportOfficer Report · PDF10 Apr 2025View
F_25_98851 PL_Final DecisionDecision Notice · PDF10 Apr 2025View
Proposed Block Plan (with boundary treatment and ecological enhancements)Site Layout Plan · PDF2 Apr 2025View
Natural EnglandConsultation Response · PDF14 Mar 2025View
Tree OfficerConsultee Response · PDF5 Mar 2025View
Ecology OfficerConsultee Response · PDF27 Feb 2025View
Proposed Block Plan (with drainage)Site Layout Plan · PDF25 Feb 2025View
Garage and Cycle Store Plans and Cross SectionSection Plan · PDF25 Feb 2025View
Proposed Elevations and Floor & Roof Plans (dwelling)Elevations And Floor Plan · PDF25 Feb 2025View
HighwaysConsultation Response · PDF17 Feb 2025View
Environemtnal Health (contaminated land) - previous comments · PDF13 Feb 2025View
Environmental HealthConsultation Response13 Feb 2025View
Tree Protection PlanPlan · PDF3 Feb 2025View
Revised Ecology Report.pdfEcological Assessment · PDF3 Feb 2025View
Arboricultural ReportTree Info · PDF3 Feb 2025View
Nitrate Report_RedactedSupporting Documents · PDF3 Feb 2025View
BIO Diversity Exemption.pdfSupporting Documents · PDF3 Feb 2025View
NutrientsSupporting Documents · PDF3 Feb 2025View
Nutrient InformationSupporting Documents · PDF3 Feb 2025View
Design and Access StatementDesign And Access Statement · PDF3 Feb 2025View
Soil Test Results_RedactedSupporting Documents · PDF3 Feb 2025View
Nutrient InformationSupporting Documents · PDF3 Feb 2025View
Application Form RedactedApplication Form · PDF3 Feb 2025View
Percolation ResultsSupporting Documents · PDF3 Feb 2025View
NutrientsSupporting Documents · PDF3 Feb 2025View
Nutrient InformationSupporting Documents · PDF3 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_98851 Decision notice informative leaflet - PERMIT F_25_98851 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: PL/05RevB, PL/06RevB, PL/07RevB and PL/08 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development shall be carried out in accordance with all mitigation and enhancements listed within the approved preliminary ecxological appraisal by arbtech dated 23/07/2024. Reason: In the Interests of Ecology.
  3. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  4. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan reference 11452-D-AIA. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. The development must accord with the arboricultural report by Hayden's arboricultural consultants, dated 23/01/2025, referenced 11452. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality
  5. No development shall start until the following has been submitted to, and approved in writing by the Local Planning Authority: a) Report of Preliminary Investigation comprising a Desk Study, Conceptual Site Model, and Preliminary Risk Assessment documenting previous and existing land uses of the site and adjacent land in accordance with UK Land contamination risk management (LCRM) national guidance and including BS10175:2011+A2:2017 Investigation of potentially contaminated sites - Code of Practice, and, unless otherwise agreed with the LPA, b) Report of a site investigation documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the Preliminary Investigation and in accordance with BS10175:2011+A2:2017, and BS 8576:2013 and unless otherwise agreed with the LPA, c) Detailed site-specific scheme for remedial works and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed and proposals for future maintenance and monitoring Such a scheme shall include the nomination of a competent person to oversee the implementation of the works. Reason: To minimise the risk from land contamination for the safety of the properties occupiers
  6. The dwelling hereby permitted shall not be occupied until verification for the agreed remediation scheme has been submitted to and agreed in writing by the Local Planning Authority. The verification shall be completed by the nominated competent person and shall comprise:- a) built drawings of the implemented scheme b) photographs of the remediation works in progress c) certificates demonstrating that imported and or material left in situ is free from contamination. Thereafter the scheme shall be monitored and maintained in accordance with the approved details. Reason: To minimise the risk from land contamination for public safety.
  7. Notwithstanding the approved details, the development hereby permitted will not be occupied until details of the boundary treatment along Claypit Copse has been submitted to and approved by the Local Planning Authority and installed on the site. The details will include an elevation of the low level wall with black metal railings and a block plan showing its exact location and surfacing details. Reason: In the interests of visual amenity.
  8. The dwelling hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  9. The dwelling hereby permitted shall not be occupied until the cycle and bin storage, garage and car parking has been installed in accordance with the approved details and thereafter retained. A minimum of three on site car parking spaces shall be provided and thereafter retained for use by the residents of the proposed dwelling. Reason: To ensure the adequate provision of on site facilities and in the interests of highway safety.
  10. All hard & soft landscaping, planting, ecological enhancements and boundary treatments shall be in place by the end of the first planting season following completion of the development in accordance with the approved details (block plan referenced PL/05 RevA and preliminary ecological appraisal by arbtech dated 23/07/2024 ) and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved details. Reason: In the interests of ecology and visual/ residential amenity.
  11. The development hereby permitted shall not be occupied until the drainage system and soakaway creates have been installed in accordance with the approved block plan - new build (reference PL/08). The driveway shall be constructed from permeable block paving. Reason: To ensure satisfactory drainage for the property.
  12. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the adjoining dwelling at 1 Claypit Copse. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  13. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  14. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.