Council planning record

Construction of 1no. detached two storey dwelling

OAK LODGE, BRIDGE ROAD, BURSLEDON

Decided PermitReference: F/25/98800Eastleigh Borough Council

Last published check: 27 Sept 2026, 18:17. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
24 Jan 2025
Validated
30 Jan 2025
Determination deadline
8 May 2025
Local authority
Eastleigh Borough Council

Application overview

Construction of 1no. detached two storey dwelling

Proposal details

Reference
F/25/98800
Alternative references
13674838
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
Mrs Louise Cutts

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

OAK LODGE, BRIDGE ROAD, BURSLEDON

This record has no verified map location.

Documents 30 of 30

DocumentPublishedAction
F_25_98800 Decision notice informative leaflet - PERMITDecision8 May 2025View
Officer ReportOfficer Report · PDF8 May 2025View
F_25_98800 PL_Final DecisionDecision Notice · PDF8 May 2025View
Proposed Site Plan (Floor Plan Layout)Site Layout Plan · PDF11 Apr 2025View
Proposed Site Plan (Roof Layout)Site Layout Plan · PDF11 Apr 2025View
Tree OfficerConsultation Response · PDF10 Apr 2025View
Landscaping OfficerConsultation Response10 Apr 2025View
Arboricultural Impact Assessment and Method StatementTree Info · PDF9 Apr 2025View
Tree OfficerConsultation Response8 Apr 2025View
Letter to Case Officer_RedactedSupporting Documents · PDF8 Apr 2025View
Natural EnglandConsultation Response · PDF4 Mar 2025View
Natural England (Annex A)Consultation Response · PDF4 Mar 2025View
Ecology OfficerConsultee Response · PDF26 Feb 2025View
Tree OfficerConsultee Response · PDF25 Feb 2025View
Highways (HCC)Consultation Response · PDF25 Feb 2025View
Urban Design OfficerConsultation Response · PDF21 Feb 2025View
EssoConsultation Response · PDF21 Feb 2025View
Landscape OfficerConsultation Response20 Feb 2025View
Ecology OfficerConsultee Response · PDF14 Feb 2025View
Environmental HealthConsultation Response4 Feb 2025View
existing Location Plan.Location Plan · PDF24 Jan 2025View
BIODIVERSITY CHECKLIST.pdfSupporting Documents · PDF24 Jan 2025View
COVER LETTER (8)_RedactedSupporting Documents · PDF24 Jan 2025View
Nutrient_Calculator_Solent_Maritime_V_03_01_3.xlsxSupporting Documents24 Jan 2025View
Proposed Roof, Elevation and Floor PlansPlans · PDF24 Jan 2025View
ECOLOGICAL APPRAISAL.pdfEcological Assessment · PDF24 Jan 2025View
Application Form Redacted.Application Form · PDF24 Jan 2025View
PLANNING DESIGN AND ACCESS STATEMENT.pdfDesign And Access Statement · PDF24 Jan 2025View
Roof Site Plan Plot 9 · PDF24 Jan 2025View
The_Statutory_Biodiversity_Metric_Calculation_Tool_-_Macro_enabled_tool_23.07.2024_Burseldon.pdfSupporting Documents · PDF24 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_98800 Decision notice informative leaflet - PERMIT F_25_98800 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 1020, 1021RevF and 1023 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development shall be carried out in accordance with the approved ecological appraisal (by aluco ecology ltd dated January 2025) and all biodiversity enhancements shall be fully installed before the dwelling is occupied. Reason: In the interests of ecology.
  3. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  4. The development must accord with the arboricultural report reference ArbEl/CH/OLB/BS5837/V3 dated 4th April 2025. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the approved report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality
  5. No development shall start, above damp proof course, until precautionary working methods for badgers, hedgehogs, nesting birds, reptiles, and stag beetles have been submitted to and approved by the Local Planning Authority. The development shall be carried out in accordance with the approved working method statements. Reason: In the interests of ecology.
  6. No development shall start above damp proof course until details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  7. The dwelling hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  8. The dwelling hereby permitted shall not be occupied until proof that biodiversity credits have been purchased to create a 10 percent biodiversity net gain for the development have been submitted to and approved in writing by the Local Planning Authority. The details shall be in accordance with the planning policy practice guidance. Reason: To comply with the Environment Act 2021, which updates Schedule 7A of the Town and Country Planning Act 1990.
  9. The dwelling hereby permitted shall not be occupied until the drainage system and storage creates have been installed in accordance with the approved ground floor site plan (reference 1021RevF). All hard surfacing shall be constructed from permeable material. Reason: To ensure satisfactory drainage for the property.
  10. The dwelling hereby permitted shall not be occupied until the noise mitigation measures (agreed for planning permission X/23/95903 in noise report reference SCL7014.200529.R1 dated May 2020) have also been installed on the house hereby approved. The approved mitigation measures shall include glazing performance as per table 5.2 Page 10; ventilation performance as per paragraph 6.1 Page 11; Proposed mitigation for the external amenity area as per paragraphs 7.3 and 7.4 Page 12; and upgrade insulation of the external walls as per paragraph 8.1 Page 13. Reason: To protect the residents from road noise and fumes
  11. The dwelling hereby permitted shall not be occupied until the garage, car parking, driveway and site access with the A27 have been installed in accordance with the approved details and thereafter retained. The site access must be a minimum of 4.8 metres from Bridge Road up to the point where it reaches the driveway to White Lodge, with no width constraints or pinch points. A minimum of three on site car parking spaces shall be provided and thereafter retained for use by the residents of the proposed dwelling. Reason: To ensure the adequate provision of on site facilities and in the interests of highway safety.
  12. Any structures or vegetation that needs to be removed to facilitate the development shall be removed outside of bird nesting season (between the beginning of March and the end of August) unless the site is checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest. Reason: To protect nesting birds.
  13. All hard & soft landscaping, planting, ecological enhancements and boundary treatments shall be in place by the end of the first planting season following completion of the development in accordance with the approved details (ground floor site plan referenced 1021RevF) and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved details. Reason: In the interests of ecology and visual/ residential amenity.
  14. The first floor bedroom window on the north west side elevation of the dwelling hereby approved shall be obscure glazed to Pilkingtons level 3 or equivalent and shall be top hung only. Once installed the window shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  15. A contaminated land watching brief shall be followed at all times during construction works and details of the watching brief shall be submitted to and approved by the Local Planning Authority (LPA) before the dwelling is occupied. In the event that previously unidentified contamination is found during the watching brief it must be immediately reported to the Local Planning Authority. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, has been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required by the Local Planning Authority, the development shall not be occupied until a verification report for the remediation work has been submitted to and approved in writing by the Local Planning Authority. All works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
  16. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  17. Note to Applicant: A S278 agreement will need to be completed with Hampshire County Council before undertaking the widening at the site access as this involves works on the highway. Further details are available at https://www.hants.gov.uk/transport/developers/section-27
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.