Demolition of the existing dwelling and erection of a replacement dwelling

29 HOCOMBE ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5SN

Decided PermitReference: F/25/100445Eastleigh Borough Council

Last published check: 14 Oct 2026, 10:38. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
13 Nov 2025
Validated
12 Dec 2025
Determination deadline
27 Feb 2026
Local authority
Eastleigh Borough Council

Application overview

Demolition of the existing dwelling and erection of a replacement dwelling

Proposal details

Reference
F/25/100445
Alternative references
14487980
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
CMC Design Architectural Services (Mr Chris McDermott)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

29 HOCOMBE ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5SN

This record has no verified map location.

Documents 27 of 27

DocumentPublishedAction
F_25_100445 PL_Final Decision (1)Decision Notice · PDF27 Feb 2026View
F_25_100445 Decision notice informative leaflet - PERMITDecision · PDF27 Feb 2026View
F_25_100445 Delegated Officer ReportOfficer Report · PDF26 Feb 2026View
Urban Design comments 17_02_26Consultee Response · PDF17 Feb 2026View
AMENDED Site Location PlansLocation Plan · PDF9 Feb 2026View
AMENDED Proposed Street SceneStreet Scene Plan · PDF9 Feb 2026View
AMENDED Proposed Elevations 1 of 2Elevations Plan · PDF9 Feb 2026View
AMENDED Proposed Elevations 2 of 2Elevations Plan · PDF9 Feb 2026View
AMENDED Proposed Roof PlanRoof Plan · PDF9 Feb 2026View
AMENDED Proposed First Floor PlanFloor Plan · PDF9 Feb 2026View
AMENDED Proposed Site LayoutSite Layout Plan · PDF9 Feb 2026View
AMENDED Proposed Ground Floor PlanFloor Plan · PDF9 Feb 2026View
Urban Design commentsConsultee Response · PDF20 Jan 2026View
Ecology response 20_1_26Consultee Response · PDF20 Jan 2026View
Tree Officer responseConsultee Response · PDF8 Jan 2026View
Ecology responseConsultee Response · PDF28 Dec 2025View
Environmental Health responseConsultee Response · PDF19 Dec 2025View
EBC - CEMP template for small sites v3.0 · PDF19 Dec 2025View
Existing Site Layout PlanSite Layout Plan · PDF12 Dec 2025View
Design and Access StatementDesign And Access Statement · PDF12 Dec 2025View
Arboricultural Report-Tree Survey_RedactedTree Info · PDF21 Nov 2025View
Preliminary Roost Assessment & Preliminary Ecological Appraisal,Supporting Documents · PDF13 Nov 2025View
Existing ElevationsElevations Plan · PDF13 Nov 2025View
Existing Ground Floor PlanFloor Plan · PDF13 Nov 2025View
Application Form_RedactedApplication Form · PDF13 Nov 2025View
Materials ScheduleSupporting Info · PDF13 Nov 2025View
Existing Roof PlanRoof Plan · PDF13 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_100445 PL_Final Decision (1) F_25_100445 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 1000/08/100 rev A, 1000/08/101, 1000/08/102, 1000/08/103, 1000/08/104 rev A, 1000/08/105 rev A, 1000/08/106 rev A, 1000/08/107 rev A, 1000/08/108 rev A, 1000/08/109 rev A, 1000/08/110 and 1000/08/111 rev A. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The materials to be used must match as closely as possible, in type, colour and texture to those listed in the Materials Schedule (dated 13.11.2025) and indicated on the approved elevation plans numbered '1000/08/105 rev A'. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. The first floor windows on the flank wall of the south elevation, serving the rooms labelled ‘bath’, ‘ensuite’ and ‘bed 3’ on the approved plan numbered ‘1000/08/108 rev A’ shall be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top opening top light. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  5. No works, including site clearance, demolition of buildings or any construction activity, shall be commenced on the site until a Construction Environment Management Plan (CEMP) for the project has been submitted to and approved in writing by the Local Planning Authority, such Plan to include: a) the location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); f) provision for storage, collection, and disposal of waste from the development during construction period; g) measures to prevent mud and dust on the highway during demolition and construction; Reason: To limit the impact the development has on the amenity of the locality, in accordance with Policies DM1 and DM8 of the Eastleigh Borough Local Plan (2016- 2036).
  6. A watching brief should be followed at all times during construction works and confirmation of this shall be submitted to by the Local Planning Authority (LPA) prior to completion. In the event that previously unidentified contamination is found during the watching brief it must be immediately reported to the Local Planning Authority. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, has been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required by the Local Planning Authority, the development shall not be brought into use until a verification report for the remediation work has been submitted to and approved in writing by the Local Planning Authority. All works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
  7. The development must accord with the arboricultural report reference TH 5523. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  8. Prior to first use of the development hereby permitted biodiversity enhancements shall be insalled in the form of a built-in sparrow terrace and built-in bat box on the east and south elevations respectively, as outlined under recommendations 4.2, 4.3 (page 15) and Figure 3 (page 17) of the submitted Preliminary Roost Assessment (PRA) & Preliminary Ecological Appraisal (PEA) by Vesper Conservation & Ecology Limited (dated 11/11/2025). Reason: To ensure a biodiversity enhancement is provided in accordance with policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  9. The development hereby permitted shall not be brought into use until a minimum of 3no. car parking spaces have been provided within the curtilage of the site and thereafter maintained and kept available. Reason: To ensure the adequate provision of on site parking for the purpose of highway safety.
  10. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  11. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works. Note to Applicant: In the unlikely event of any great crested newts being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Note to Applicant: Any vegetation to be removed to facilitate the development must be removed outside of bird nesting season (which is usually between the beginning of March and the end of August). If this is not possible then vegetation can be cleared only after being checked for nesting birds by a suitably qualified ecologist up to 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest. Note to Applicant: A precautionary working method must be used to prevent harm to wildlife that could be using this site. It should include: - All building materials to be stored on hard standing or on pallets, as far as possible from hedgerows, scrub or potential habitat. - Any excavations must be covered at night or be fitted with a small animal escape ramp. All the footings for the new building should be covered tightly every night to stop any animals becoming trapped in the footings. - No fires can be lit on site. - Waste must be stored in a skip and not be allowed to accumulate in piles which could be used by wildlife. Any chemicals and fuels must be stored carefully and away from potential wildlife habitat. - Any animals found on site should not be handled but be allowed to move away to a place of safety on their own. Note to Applicant: Exterior lighting should be kept to a minimum, but if necessary for security purposes, then the latest updated lighting guidance note (GN08/23) should be followed. This is available at https://theilp.org.uk/publication/guidance-note-8-bats-and-artificial-lighting/
  12. Note to Applicant: The development could be impacted by radon and you are advised to consult the radon map at https://www.ukradon.org/information/ukmaps. If the radon risk is greater than 1% radon protection should be considered for the new development. If greater than 3% then radon protection will need to be provided in accordance with Building Regulations, with basic protection required at 3-10% and full protection above 10%. Note to Applicant: Any imported soils required for the development hereby permitted should be demonstrated to be suitable for its intended end use and meet the approval of the Local Planning Authority prior to use on site.
  13. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.