Council planning record

Erection of 4no. bedroom dwelling parking and new access drive for proposed and existing bungalow

46 STATION ROAD, NETLEY ABBEY, SOUTHAMPTON, SO31 5AF

Decided PermitReference: F/25/100301Eastleigh Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
22 Oct 2025
Validated
12 Dec 2025
Determination deadline
29 May 2026
Local authority
Eastleigh Borough Council

Application overview

Erection of 4no. bedroom dwelling parking and new access drive for proposed and existing bungalow

Proposal details

Reference
F/25/100301
Alternative references
14431143
Ward
Hamble & Netley Ward
Parish
Hound CP
Agent
David Windsor (David Windsor)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

46 STATION ROAD, NETLEY ABBEY, SOUTHAMPTON, SO31 5AF

This record has no verified map location.

Documents 25 of 25

DocumentPublishedAction
F_25_100301 PL_Final DecisionDecision Notice · PDF27 May 2026View
F_25_100301 Decision notice informative leaflet - PERMITDecision · PDF27 May 2026View
F_25_100301 Delegated Officer ReportOfficer Report · PDF26 May 2026View
AMENDED Proposed Elevations and Floor PlanElevations And Floor Plan · PDF16 Feb 2026View
F25100301 Natural England Response letterConsultation Response · PDF29 Jan 2026View
HRA 46 Station Road · PDF22 Jan 2026View
Parish responseParish Response · PDF20 Jan 2026View
Tree Officer responseConsultee Response · PDF7 Jan 2026View
Ecology responseConsultee Response · PDF28 Dec 2025View
Hampshire Highways responseConsultee Response · PDF22 Dec 2025View
Urban Design CommentsConsultee Response22 Dec 2025View
Nitrate CalculationSupporting Documents12 Dec 2025View
Access and Sustainable Drainage StatementsSupporting Documents · PDF3 Dec 2025View
Part O - Simplified OH Report (J03790 rev 1)Report - Other · PDF3 Dec 2025View
Part G - Water Efficiency Report (J03790 Issue 1)Report - Other · PDF3 Dec 2025View
Sustainable StatementSupporting Documents · PDF3 Dec 2025View
Preliminary Ecological AppraisalEcological Assessment3 Dec 2025View
Site Plan as ExistingSurvey Plan · PDF3 Dec 2025View
Small Sites Metric (Statutory Biodiversity Metric)Ecological Assessment3 Dec 2025View
Exisiting Plot PlanPlan · PDF22 Oct 2025View
Location and Block PlansPlans · PDF22 Oct 2025View
Application Form RedactedApplication Form · PDF22 Oct 2025View
Proposed Street SceneStreet Scene Plan · PDF22 Oct 2025View
Proposed Plot PlanPlans · PDF22 Oct 2025View
Design & Access StatementDesign And Access Statement · PDF22 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_100301 PL_Final Decision F_25_100301 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: S.R.01. rev A, 01, 02, 06, 07 and 574/01. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. No development shall start until the following details have been submitted to and approved in writing by the Local Planning Authority: a) details (and samples when requested) of the materials to be used in the construction of the external surfaces of the development; b) the alignment, height and materials of all walls, fences and other means of enclosure; c) plans including cross sections to show proposed ground levels and their relationship to existing levels both within the site and on immediately adjoining land. The development shall not be occupied until the approved details have been fully implemented. Reason: To limit the impact the development has on the locality.
  4. No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials. b) the parking of vehicles of site operatives and visitors; c) measures to control the emission of dust and dirt generated by demolition and construction; d) a scheme for controlling noise and vibration from demolition and construction activities; e) provision for storage, collection, and disposal of rubbish from the development during construction period; f) measures to prevent mud and dust on the highway during demolition and construction. Reason: To limit the impact the development has on the amenity of the locality
  5. No excavation, demolition or development related works shall take place on site until a Tree Planting Plan and Planting Method Statement, as per British Standard 8545:2014, have been submitted and approved by the Local Planning Authority. The approved documents must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. Tree planting must take place no later than the start of the following planting season after completion of the proposed development. For a period of no less than 10 years after planting, trees which are removed, die or become seriously damaged shall be replaced as soon as reasonably practicable with others of the same species, size and number as originally approved. Reason: To maintain and enhance local tree canopy cover.
  6. Prior to development above damp proof course (DPC) a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all soft landscaping, including the planting to the northern and western boundary [as marked on the approved proposed plot plan numbered '01' and street scene numbered '06'], and shall provide details of timings for all soft landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard and for a period of no less than 10 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  7. Prior to commencement of the development hereby permitted, a Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority (LPA) in accordance with paragraph 14(2) of Schedule 7A of the Town and Country Planning Act 1990. The Biodiversity Gain Plan shall be implemented in accordance with the approved details and thereafter accorded to. Reason: To ensure the development delivers a biodiversity net gain in accordance with Schedule 14 of the Environment Act 2021, paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 from the Eastleigh Local Plan (2016-2036).
  8. The development shall not commence until a Habitat Management and Monitoring Plan (HMMP), prepared in accordance with the submitted Biodiversity Gain Plan, has been submitted to and agreed in writing by the LPA along with a timetable for implementation. Thereafter those habitats shall be managed and maintained in accordance with the approved details for a minimum period of 30 years following completion. Reason: To ensure the development delivers a biodiversity net gain in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 and to accord with the Environment Act 2021, Schedule 14.
  9. Notice in writing shall be given to the LPA when the: a) habitat creation and enhancement works as set out in the HMMP have commenced, and b) habitat creation and enhancement works as set out in the HMMP have been completed. Monitoring reports shall be submitted to the Local Planning Authority in writing in accordance with the methodology and frequency specified the approved Habitat Management and Monitoring Plan. Reason: To ensure the development delivers a biodiversity net gain in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 and to accord with the Environment Act 2021, Schedule 14.
  10. Prior to the first occupation of the development hereby approved, evidence of purchase of the correct number of biodiversity credits or units for the development shall be submitted to and approved in writing by the Local Planning Authority. Reason: To ensure the development delivers a biodiversity net gain on site in accordance with Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  11. The dwelling hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  12. Before use of the development is commenced the access, including the footway and/or verge crossing shall be constructed in accordance with the approved plans, and the existing access from the site to Station Road shall be permanently stopped up and effectively closed with the footway provided or verge reinstated, in accordance with details which have been submitted to and approved by the Local Planning Authority. Reason: To provide satisfactory access and in the interests of highway safety.
  13. Before use of the development hereby approved is commenced, provision for parking shall have been made within the site in accordance with the approved plans and shall be retained thereafter. Reason: To ensure adequate on-site car parking provision for the approved development.
  14. Prior to first occupation of the development hereby approved, details of the bin and cycle storage shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the bin and cycle storage has been constructed in accordance with the approved details and is thereafter retained and kept available. Reason: To ensure the adequate provision of on site facilities.
  15. The first floor windows in the side elevations serving an en-suite and landing [on the approved plan numbered 'S.R.01. rev A'] shall be obscure glazed to a minimum of Pilkingtons level 3 or equivalent with no more than a top opening toplight. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties in accordance with Policy DM1 of the Eastleigh Borough Local Plan 2016-2036
  16. Note to Applicant: Given there will be a need to re-position the street light column, and also close up the existing vehicle crossover, reinstating it with full height kerbs and footway surface, a Minor Works S278 agreement will need to be entered in to with HCC as Local Highway Authority, subsequent to any planning permission that may be forthcoming from EBC as Local Planning Authority. Details of this process can be found via the following web address - https://www.hants.gov.uk/transport/developers/section-278
  17. Note to Applicant: In accordance with Local Plan policy DM11 and NPPF paragraphs 187d and 192b, biodiversity enhancements are recommended in the form of a bat brick/box and a swift nest brick/box. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight.
  18. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.