Council planning record

Residential development of 192 dwellings comprising houses and apartments, to include access, parking, landscaping and other associated works, along with off-site footway and bridleway improvements.

Land south east of Kings Copse Avenue, Hedge End

Decided PermitReference: F/25/100141Eastleigh Borough Council

Last published check: 14 Oct 2026, 11:32. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
25 Sept 2025
Validated
10 Oct 2025
Determination deadline
28 Aug 2026
Local authority
Eastleigh Borough Council

Application overview

Residential development of 192 dwellings comprising houses and apartments, to include access, parking, landscaping and other associated works, along with off-site footway and bridleway improvements.

Proposal details

Reference
F/25/100141
Alternative references
14341341
Ward
Botley Ward
Parish
Botley CP
Agent
Mission Town Planning (Alex King)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land south east of Kings Copse Avenue, Hedge End

This record has no verified map location.

Documents 154 of 154

DocumentPublishedAction
Legal ReceiptLegal Agreement Supporting Info · PDF8 Sept 2026View
F_25_100141 PL_Final DecisionDecision Notice · PDF20 Aug 2026View
Legal AgreementLegal Agreement · PDF20 Aug 2026View
S106 Agreement Final Draft Version 23 July 202623 Jul 2026View
Site layout plan with landscape 2026_02_02Site Layout Plan · PDF10 Feb 2026View
Site layout planSite Layout Plan · PDF10 Feb 2026View
Financial Viability Assessment Review Report _RedactedSupporting Documents · PDF9 Feb 2026View
Committee Report Kings Copse AvenueOfficer Report · PDF27 Jan 2026View
Committee Update paper 26 January 2026 · PDF27 Jan 2026View
Natural England response to Appropriate AssessmentConsultation Response · PDF27 Jan 2026View
Environment Agency further comments no objectionConsultation Response · PDF26 Jan 2026View
AMENDED Cut and Fill plan · PDF23 Jan 2026View
AMENDED S278 Highway Works Overall Scheme Plan · PDF23 Jan 2026View
HCC Education updated responseConsultation Response · PDF20 Jan 2026View
Email to Natural England with HRA Appropriate Assessment14 Jan 2026View
Further Urban Design comments on central squareConsultation Response · PDF9 Jan 2026View
Ecology comments · PDF9 Jan 2026View
National Highways ResponseConsultation Response · PDF9 Jan 2026View
Highway Authority further comments Jan 25Consultation Response · PDF8 Jan 2026View
UPDATED Flood Risk Assessment and Drainage_Strategy P05Flood Risk Assessment · PDF7 Jan 2026View
AMENDED Structural Planting PlanLandscape Plan · PDF2 Jan 2026View
Central space design intentLandscape Plan · PDF2 Jan 2026View
AMENDED Landscape General Arrangement PlanLandscape Plan · PDF2 Jan 2026View
Landscape General Arrangement Central areaLandscape Plan · PDF2 Jan 2026View
Planting schedule and notesLandscape Plan · PDF2 Jan 2026View
LLFA Response - F-25-100141 (002)_RedactedConsultation Response · PDF2 Jan 2026View
Drainage Layout AMENDED · PDF19 Dec 2025View
Manhole Schedule · PDF19 Dec 2025View
SUPERSEDED Flood Risk Assessment and Drainage Strategy · PDF19 Dec 2025View
Environmental Health further air quality comments Dec 25Consultation Response · PDF17 Dec 2025View
Updated Planning Statement · PDF17 Dec 2025View
Transport Assessment AddendumTransport Assessment · PDF12 Dec 2025View
Environmental Health final comments on contaminated landConsultation Response · PDF12 Dec 2025View
Main Investigation ReportContaminated Land Study · PDF12 Dec 2025View
Preliminary Investigation ReportContaminated Land Study · PDF9 Dec 2025View
Drainage Technical Note_RedactedDrainage Report · PDF5 Dec 2025View
Naturespace agreement to GCN method statementConsultation Response · PDF3 Dec 2025View
Planning Policy CommentsConsultation Response · PDF2 Dec 2025View
Great Crested Newt precautionary working method statement · PDF2 Dec 2025View
Financial Viability Assessment_RedactedSupporting Documents · PDF2 Dec 2025View
Tree Officer commentsConsultee Response · PDF26 Nov 2025View
Housing Officer commentsConsultation Response · PDF20 Nov 2025View
Highway Authority commentsConsultation Response · PDF13 Nov 2025View
BNG Condition Assessment12 Nov 2025View
Ecological Impact Assessment 6 Nov 2025Ecological Assessment · PDF12 Nov 2025View
County Archaeologist commentsConsultation Response · PDF6 Nov 2025View
Botley Parish Council commentsConsultation Response · PDF6 Nov 2025View
Heritage Officer commentsConsultation Response · PDF6 Nov 2025View
Natural England responseConsultation Response · PDF5 Nov 2025View
Southampton Airport commentsConsultation Response · PDF5 Nov 2025View
Landscape Officer commentsConsultation Response · PDF5 Nov 2025View
Representation from 33 Ferndale with photographsNeighbour Letter · PDF5 Nov 2025View
LLFA Response - F-25-100141_RedactedConsultation Response · PDF5 Nov 2025View
Landscape and Visual Impact Appraisal Volume 2Landscape Assessment · PDF5 Nov 2025View
Representation from 34 Ferndale with photographsNeighbour Letter · PDF5 Nov 2025View
Environment Agency commentsConsultation Response · PDF5 Nov 2025View
Urban Design commentsConsultation Response · PDF5 Nov 2025View
Annex A to Natural England letter - advice · PDF5 Nov 2025View
NatureSpace comments (great crested newts)Consultation Response · PDF5 Nov 2025View
Southern Water consultation responseConsultation Response · PDF4 Nov 2025View
Southern Water GIS Map printConsultation Response · PDF4 Nov 2025View
Hampshire Swifts commentsConsultation Response · PDF3 Nov 2025View
Fisher German LLP (ESSO) comments_RedactedConsultation Response · PDF20 Oct 2025View
Environmental Health comments CL Noise and Air QualityConsultation Response · PDF17 Oct 2025View
HCC Education response · PDF17 Oct 2025View
Active Travel England response standing adviceConsultation Response · PDF17 Oct 2025View
Cover Letter (9)_RedactedSupporting Documents · PDF15 Oct 2025View
HCC Minerals and Waste Policy Team commentsConsultation Response · PDF15 Oct 2025View
Southern Water GIS Map PrintConsultation Response · PDF14 Oct 2025View
BNG Strategy Form Kings Copse Avenue · PDF14 Oct 2025View
Holding response from Southern WaterConsultation Response · PDF14 Oct 2025View
Planting schedule and notesLandscape Plan · PDF10 Oct 2025View
Proposed Plans Type TT and J 2025_10_08Floor Plan · PDF9 Oct 2025View
Proposed Plans Type BB 2025_10_08 · PDF9 Oct 2025View
Updated BNG Metric9 Oct 2025View
Transport Assesment [Compiled]_RedactedSupporting Documents · PDF8 Oct 2025View
Swept Path Plan Fire AppliancePlan · PDF2 Oct 2025View
Landscape Visual Impact Assessment Volume 1 P02-minSupporting Documents · PDF2 Oct 2025View
Noise Impact AssessmentNoise Report · PDF2 Oct 2025View
Drainage Details Sheet 2Drainage Plan · PDF2 Oct 2025View
Proposed Pedestrian Connection along Kings Copse AvenuePlan · PDF2 Oct 2025View
Design and Access Statement Part 2Design And Access Statement · PDF2 Oct 2025View
UXO (Unexploded Ordnance) Assessmen (DRA)_RedactedSupporting Documents · PDF2 Oct 2025View
Minerals Safeguarding and Contamination Report RedactedSupporting Documents · PDF2 Oct 2025View
Archaeological Desk-based AssessmentSupporting Documents · PDF2 Oct 2025View
UXO Risk Assessment (DRA)Supporting Documents · PDF2 Oct 2025View
Tree Protection PlanPlan · PDF2 Oct 2025View
Proposed Pedestrian and cyclist connectionsPlan · PDF2 Oct 2025View
Arboricultural Impact AssessmentTree Info · PDF2 Oct 2025View
Planning Fire Safety ReviewSupporting Documents · PDF2 Oct 2025View
Design and Access Statement Part 1Design And Access Statement · PDF2 Oct 2025View
Contours and Levels PlanPlan · PDF2 Oct 2025View
Highway and Rights of Way PlanPlan · PDF2 Oct 2025View
Manhole ScheduleDrainage Plan · PDF2 Oct 2025View
Tree Protection PlanPlan · PDF2 Oct 2025View
Bridleway Works Overall Scheme PlanPlan · PDF2 Oct 2025View
SUPERSEDED Below Ground Drainage LayoutDrainage Plan · PDF2 Oct 2025View
SUPERSEDED Structural Planting PlanPlan · PDF2 Oct 2025View
Tree Protection PlanPlan · PDF2 Oct 2025View
Minerals Safeguarding Report _RedactedSupporting Documents · PDF2 Oct 2025View
Street Lighting DesignSupporting Documents · PDF2 Oct 2025View
Swept Path Analysis- Large CarSupporting Documents · PDF2 Oct 2025View
Minerals Recovery Statement IssuedSupporting Documents · PDF2 Oct 2025View
Walking Cycling and Horse Riding AssessmentSubsistence Fee - Public · PDF2 Oct 2025View
Drainage CalculationsDrainage Report · PDF2 Oct 2025View
Air Quality Assessment Rev1 250828_RedactedSupporting Documents · PDF2 Oct 2025View
Swept Path Analysis Refuse VehicleSupporting Documents · PDF2 Oct 2025View
Travel PlanSupporting Documents · PDF2 Oct 2025View
Technical Drainage Details Sheet 1Drainage Plan · PDF2 Oct 2025View
SUPERSEDED Landscape General Arrangement PlanLandscape Plan · PDF2 Oct 2025View
Site Access ArrangementSupporting Documents · PDF2 Oct 2025View
SUPERSEDED Cut & Fill PlanPlan · PDF2 Oct 2025View
Exceedence Route PlanDrainage Plan · PDF2 Oct 2025View
Energy and Sustainability StatementSupporting Documents · PDF2 Oct 2025View
Construction Traffic Management Plan [Compiled]Supporting Documents · PDF2 Oct 2025View
Nutrient_Calculator_Solent_Kings Copse draft updated 11 10Supporting Documents2 Oct 2025View
Flat Plans Block D and A handedFloor Plan · PDF1 Oct 2025View
Proposed Elevations Type IElevations Plan · PDF1 Oct 2025View
Flat Plans Block D and A handedPlans · PDF1 Oct 2025View
Proposed Elevations Block D and A handed 2025_09_15Elevations Plan · PDF1 Oct 2025View
Proposed Site Boundary Elevations Northern and Eastern boundariesStreet Scene Plan · PDF1 Oct 2025View
Proposed Plans Type NN without ensuiteFloor Plan · PDF1 Oct 2025View
Proposed Elevations Type WElevations Plan · PDF1 Oct 2025View
Proposed Elevations Type BElevations Plan · PDF1 Oct 2025View
Design and Access Statement part 2 rev P01 2025_09_19Design And Access Statement · PDF1 Oct 2025View
Proposed Plans Type WFloor Plan · PDF1 Oct 2025View
Proposed Elevations Type BBElevations Plan · PDF1 Oct 2025View
Site layout plan with landscapeSite Layout Plan · PDF1 Oct 2025View
Flat Plans Block C and B handedFloor Plan · PDF1 Oct 2025View
Proposed Plans Type TT version 2Floor Plan · PDF1 Oct 2025View
Site location PlanLocation Plan · PDF1 Oct 2025View
Proposed Plans Type NN corner house without ensuite 2025_09_15Floor Plan · PDF1 Oct 2025View
Proposed Site Boundary Elevations (north west)Site Layout Plan · PDF1 Oct 2025View
Proposed Site SectionsSection Plan · PDF1 Oct 2025View
Proposed Plans Type NN corner unitFloor Plan · PDF1 Oct 2025View
Flat Plans Block C and B handedPlans · PDF1 Oct 2025View
Proposed Site Boundary Elevations (southern and western)Site Layout Plan · PDF1 Oct 2025View
Proposed Elevations Type TT and JElevations Plan · PDF1 Oct 2025View
Proposed Plans Type GGFloor Plan · PDF1 Oct 2025View
Proposed Elevations Type NN corner unitElevations Plan · PDF1 Oct 2025View
Proposed Elevations Type UUElevations Plan · PDF1 Oct 2025View
Proposed Plans Type UUPlans · PDF1 Oct 2025View
Proposed Elevations Block C and B handedElevations Plan · PDF1 Oct 2025View
Proposed Elevations Type GGElevations Plan · PDF1 Oct 2025View
Design and Access Statement part 1 rev P01Design And Access Statement · PDF1 Oct 2025View
Proposed Elevations Type NNElevations Plan · PDF1 Oct 2025View
Proposed Elevations Type TT version 2Elevations Plan · PDF1 Oct 2025View
Topographical and Utility SurveySupporting Documents · PDF1 Oct 2025View
Sections and streetscene, boundary Key PlanPlan · PDF1 Oct 2025View
Proposed Plans Type BFloor Plan · PDF1 Oct 2025View
Proposed Plans Type IFloor Plan · PDF1 Oct 2025View
Proposed Site SectionsSection Plan · PDF1 Oct 2025View
Block Plan and Roof PlanSite Layout Plan · PDF25 Sept 2025View
Application Form RedactedApplication Form · PDF25 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_100141 PL_Final Decision
Planning conditions
  1. Implementation timeframe The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. Approved plans The development hereby permitted shall be implemented in accordance with the following plans numbered: 0001 C01 (Site Location Plan); 0002 C01 (Proposed Block Roof Plan); 0003 C03 (Proposed Site Plan); 0003 C03 (Proposed Site Plan with landscaping); 0005 C01 (Proposed Streetscene Key Plan); 100 C02 (House Plans Type BB, Plots 7,8,11,12,15,16,19,20,23-25,51-54,57,59-64,77,78,80,82,83,86,88-91,93,94); 101 C01 (House Plans Type GG, Plots 26-29, 65, 66, 76, 84, 92); 102 C03 (House Plans Type NN, Plots 50,55,56,58,67,79,81,85,87); 104 C01 (House Plans Type W, Plots 3, 22, 100); 105 C01 (Proposed Plans Type NN Corner House, Plots 6, 48, 49, 68); 106 C01 (House Plans Type UU, Plots 1, 5, 9, 30, 69, 72, 95, 102); 107 C02 (House Plans Type TT and J, J Plots 31-34; TT Plots 2,4,13,14,70,71,73-75,96-99,101); 108 C01 (House Plans Type B, Plots 36, 39, 42, 45, 46); 109 C01 (House Plans Type I, Plots 35, 37, 38, 40, 41, 43, 44, 47); 110 C01 (House Plans Type TT version 2, Plot 99); 111 C01 (House Plans Type NN without ensuite, Plots 10, 18); 112 C01 (Proposed Plans Type NN Corner House without ensuite, Plots 17, 21); 0200 C01 (Elevations Type BB); 0201 C01 (Elevations Type GG); 0202 C01 (Elevations Type NN); 0203 C01 (Elevations Type W); 0204 C01 (Elevations Type NN corner unit); 0205 C01 (Elevations Type UU); 0206 C01 (Elevations Type TT and J); 0207 C01 (Elevations Type B); 0208 C01 (Elevations Type I); 0209 C01 (Elevations Type TT version 2); 220 C01 (Flat Plans Block C and B handed ground, first and second floor); 221 C01 – (Flat Plans Block C and B handed third floor and roof); 222 C01 (Flat Plans Block D and A handed ground, first and second floor); 223 C01 (Flat Plans Block D and A handed third floor and roof); 230 C01 (Flat Elevations Block A and D handed); 231 C01 (Flat Elevations Block B and C handed); 250 C01 (Proposed Site Sections A-A and B-B); 251 C01 (Proposed Site Sections C-C, D-D, E-E, F-F); 252 C01 (Proposed Site Boundary Elevations northern and eastern); 254 C01 (Proposed Site Boundary Elevations southern and western); 235 C01 (Proposed Site Boundary Elevations north-west); 9110 Rev. P07 (Cut and Fill to Formation Level); and 3743.03C (S278 Works – Overall Scheme Plan including access works). Reason: For the avoidance of doubt and in the interests of proper planning.
  3. Contaminated land A watching brief shall be followed at all times during construction works and confirmation of this shall be submitted to the Local Planning Authority (LPA) prior to completion. In the event that any evidence of potential contamination that was not previously identified in the approved Main Investigation Report (Soils Limited, December 2025, ref. 22085/MIR Rev1.0), is found during the watching brief, it must be immediately reported to the LPA. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, has been submitted to and approved in writing by the LPA. Where a remediation scheme is required by the LPA, the development shall not be brought into use until a verification report for the remediation work has been submitted to and approved in writing by the LPA. All works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  4. Construction Environmental Management Plan No construction to include site preparation works involving excavation shall start until a Construction Environmental Management Plan (CEMP) has been submitted to, and approved in writing, by the Local Planning Authority. Preparation and construction work shall only take place in accordance with the approved CEMP, which shall include: a) A programme of construction work; b) the location of temporary site buildings, compounds, construction material and plant storage areas; c) the arrangements for deliveries associated with all construction works; d) access and egress for plant and machinery; e) protection of pedestrian routes during construction; f) provision of long term facilities for contractor parking; g) methodology for ensuring dirt is not transferred onto the highway (i.e. wheel washers) and onwards mitigation should this fail (e.g. mechanical road sweepers), and the subsequent refresh of street lining as required should this be damaged; h) measures to control the emission of dust as set out in Table 16 of the submitted Air Quality Assessment (Omnia, ref. C11149-2/1.0); as well as dirt and airborne pollution; i) a scheme for controlling noise and vibration (to include piling); j) provision for storage, collection and disposal of rubbish from the development during the construction period; k) erection and maintenance of security hoarding including decorative displays where relevant; l) temporary lighting; m) temporary surface water drainage provisions; n) hours of working; o) adherence to the recommendations of the Ecological Impact Assessment (ACD Environmental, 06.11.2025) and the Great Crested Newt Precautionary Working Methods Statement (ACD Environmental, 2nd December 2025); and p) procedures for the management and reuse of excavated materials and soils, including segregation, temporary storage and appropriate reuse or disposal in accordance with the recommendations of the Main Investigation Report (Soils Ltd, December 2025). Reason: To limit the impact the development has on the amenity of the locality and to protect biodiversity, in accordance with Policies DM1, DM8 and DM11 of the Eastleigh Borough Local Plan 2016-2036.
  5. Access provision (a) No development shall start on site until a construction access has been provided in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority, and shall remain in place for the duration of construction works. (b) The permanent site access, including the footway and / or verge crossing, shall be completed in accordance with the approved plans prior to first occupation of the development and the lines of sight splays shall be kept free of any obstruction exceeding 0.6m in height above the adjacent carriageway and shall be subsequently maintained so thereafter. Reason: To provide satisfactory access in the interest of highway safety, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  6. Tree Protection The development hereby permitted must accord with the Arboricultural Impact Assessment and Method Statement (ACD Environmental, ref. EBC/24408aia_ams, dated 21/08/2025). No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plans reference EBC24408-03 (Sheets 1 to 3). Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason - To retain and protect the existing trees which form an important part of the amenity of the locality, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  7. Drainage scheme Prior to installation of any element of the drainage system, a final Drainage Strategy shall be submitted to and approved in writing by the Local Planning Authority. The final drainage strategy shall be based on the details set out in the submitted Flood Risk Assessment & Drainage Strategy prepared by AKS Ward, dated December 2024 (Rev. P03), unless an alternative scheme can be demonstrated to achieve the required policy and design standards, and shall include details as to how rain gardens and permeable paving will connect to the wider network. The drainage strategy shall thereafter be implemented in accordance with the approved scheme and completed prior to first occupation of the development. Reason: To ensure suitable drainage to prevent flood risk and to protect water quality, in accordance with Policies DM5 and DM6 of the Eastleigh Borough Local Plan (2016-2036).
  8. Drainage maintenance Prior to occupation of the development hereby permitted, a detailed Drainage Maintenance Plan, to include details of regular maintenance, occasional maintenance, remedial actions and monitoring activities, and reference to the watercourse and main outfall, shall be submitted to and approved in writing by the Local Planning Authority. The drainage strategy shall thereafter be managed and maintained in accordance with the approved plan. Reason: To ensure long term maintenance of the drainage system, to prevent flood risk and protect water quality, in accordance with Policies DM5 and DM6 of the Eastleigh Borough Local Plan (2016-2036).
  9. Minerals Recovery Strategy The development hereby permitted shall be carried out in accordance with the methodology for safeguarding and recovery of minerals as set out in the Minerals Recovery Statement prepared by Soils Limited, dated July 2025 (ref. 22023/MRS Rev 1.0). This shall include reporting of the following information to the Local Planning Authority and Minerals Planning Authority on 1st April each year following commencement until the development is completed: - Tonnes of minerals extracted; - Quantity re-used on site; - If exported, the location of processing. Reason: To ensure that minerals that can be viably recovered during the development operations are recovered and put to beneficial use in accordance with Policy 15 of the Hampshire Minerals and Waste Plan (2013).
  10. Archaeology Evaluation and Mitigation Prior to commencement of the development hereby permitted, the following shall be submitted to and approved in writing by the Local Planning Authority: (a) a scheme for archaeological evaluation; (b) a programme of archaeological mitigation based on the results of the archaeological evaluation. The archaeological evaluation and mitigation works shall thereafter be implemented in accordance with the approved details. Reason: To assess the extent and nature of any archaeological deposits and the impact of the development upon these heritage assets, in accordance with Policy DM12 of the Eastleigh Borough Local Plan (2016-2036).
  11. Materials Prior to any development above foundation / slab level, full details including samples where requested, of the proposed external materials for the buildings, shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details. Reason: To ensure a high quality design in the interest of visual amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  12. Central square Prior to commencement of the development hereby permitted, the details of the central square as shown on Plan ref. 2541-TFC-XX-XX-DR-L-1003 shall be further developed with full details of the footpath layout, surfacing materials (including samples where requested), soft landscaping, lighting and street furniture submitted to and approved in writing by the Local Planning Authority. The central square shall thereafter be laid out in accordance with the approved details. Reason: To secure a pedestrian friendly and legible area within the centre of the site, in the interest of good design, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  13. Landscaping a) No development above foundation / slab level shall take place until final versions of the Landscape Plans including detailed Planting Plans at 1:200 scale, have been submitted to and approved in writing by the Local Planning Authority. The final plans shall be based on the principles shown on the submitted plans ref. 2541-TFC-XX-00-DR-L-1001 P12 (Landscape General Arrangement) and 2541-TFC-XX-00-DR-L-3001 P07 (Structural Planting Plan) and shall include: - additional tree planting where feasible; - details of planting and protection methods for landscaping in close proximity to below ground utility pipelines; and - details of specialist tree cell tree pits. b) The approved landscaping and planting scheme shall be carried out in accordance with the details approved under part (a) of this condition in the first planting season following occupation of the development, or completion of the development (whichever is sooner); c) The developer shall provide to the Local Planning Authority photographic evidence with locations referenced into the site plan of the specialist tree pits once the tree cells have been installed (but prior to backfilling with the growing medium); d) If, within a period of 10 years after planting, any tree or plant is removed, dies or becomes, in the opinion of the Local Planning Authority, seriously damaged, defective or diseased, another tree or plant of the same species and size as that originally approved shall be planted at the same place within the next planting season, unless the Local Planning Authority gives its written consent to any variation. Reason: To achieve a high quality development and to support biodiversity in accordance with Policies DM1 of the Eastleigh Borough Local Plan (2016-2036).
  14. Landscape Management Plan Prior to occupation of the development hereby permitted, a Landscape Management and Maintenance Plan shall be submitted to and approved in witing by the Local Planning Authority. Landscape management and maintenance shall thereafter be carried out in accordance with the approved details. Reason: In the interest of biodiversity and visual amenity, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  15. Hard surfacing No development above foundation / slab level shall take place until full details of the materials to be used for the hard surfacing, including manufacturers details, have been submitted to and approved in writing by the Local Planning Authority. The hard surfacing shall thereafter be installed in accordance with the approved details. Reason: In the interest of visual amenity in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  16. Ecological Mitigation The development shall accord in full with the recommendations of the Ecological Impact Assessment (ACD Environmental, 06.10.2025, ref. EBC24408_EcIA), Biodiversity Net Gain Strategy (June 2025), and the Great Crested Newt Precautionary Working Methods Statement (ACD Environmental, dated 2nd December 2025), unless any variations are first submitted to and agreed in writing by the Local Planning Authority. Reason: To ensure protection of species and habitats and to achieve a biodiversity net gain, in accordance with paragraph 2, Schedule 7A of the Town and Country Planning Act 1990, Policy DM11 of the Eastleigh Borough Local Plan (2016-2036), and the Environment Act 2021, Schedule 14.
  17. Boundary treatment No development above foundation / slab level shall take place until full details of all boundary treatments and enclosures, to include fencing or other boundary treatment along the southern and eastern edges of the site to restrict access to adjacent woodland, have been submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall thereafter be installed in accordance with the approved details. Reason: In the interest of visual amenity and to protect existing woodland in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  18. Refuse storage Prior to development above foundation / slab level, full details of the refuse and recycling storage facilities for the houses and flats shall be submitted to and approved in writing by the Local Planning Authority. The refuse and recycling storage facilities shall thereafter be provided and retained in accordance with the approved details. Reason: To ensure appropriate waste storage in the interest of amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  19. Cycle storage Prior to development above foundation / slab level, full details of the cycle storage facilities (to include type and number of storage racks for the flats and details of the external storage enclosures for the houses), shall be submitted to and approved in writing by the Local Planning Authority. The cycle storage facilities shall thereafter be provided and retained in accordance with the approved plans. Reason: To encourage the use of alternative means of transport to the private car, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036) and the Adopted Parking Standards (September 2025).
  20. Noise testing Prior to first occupation of the development hereby permitted: a) a sample of plots for noise testing shall be agreed by the Local Planning Authority; and b) a post completion noise test shall be carried out by a competent acoustic consultant for the agreed sample of plots and a report submitted to and approved by the Local Planning Authority. Reason: To ensure that the noise mitigation measures are sufficient to protect future occupants from adverse noise impacts, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036) and British Noise Standards.
  21. Parking provision Prior to first occupation of the development hereby permitted, the vehicle parking spaces shown on the approved plans shall be provided and retained thereafter for vehicle parking only. Reason: To ensure adequate parking provision in accordance with Policy DM14 of the Eastleigh Borough Local Plan (2016-2036).
  22. Road and footway verification In relation to all roads, footways and cycleways to be provided on site the following requirements shall be met: a) Prior to construction of any road (excluding haul roads), footway or cycleway a plan showing the extent of the roads, footways and cycleways to be adopted and unadopted shall be submitted to and approved in writing by the Local Planning Authority; b) All roads, footways and cycleways, whether to be adopted or otherwise, shall be built to Hampshire County Council’s current adoptable construction standards and completed prior to occupation of the penultimate dwelling; and c) A verification report by a suitably qualified engineer confirming that all unadopted roads, footways and cycleways have been built to Hampshire County Council’s current adoptable construction standards shall be provided to the Local Planning Authority on completion of the final road surface or prior to occupation of the penultimate dwelling, whichever is earlier. The report shall include the relevant construction details that the roads, footways and cycleways have been built to and details of the professional qualifications of the person providing the verification. Reason: To ensure that the development is provided to an appropriate standard.
  23. Accessibility standards Prior to occupation of the dwellings hereby approved, evidence that at least 90% of units comply with Part M4(2) standard (Accessible and adaptable dwellings), and at least 4 of the dwellings would meet Part M4(3) standard (Wheelchair user dwellings), shall be submitted to and approved in writing by the Local Planning Authority. Reason: To ensure the development meets higher national access standards in accordance with Policy DM29 of the Eastleigh Borough Local Plan (2016-2036).
  24. Water efficiency Prior to the occupation of the dwellings hereby approved, supporting information to confirm the predicted mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality design across the site and to achieve water efficiency in accordance with Policy DM2 of the Eastleigh Borough Local Plan (2016-2036).
  25. Employment and Skills Plan No development shall commence until an Employment and Skills Plan (ESP) has been submitted to and approved in writing by the Local Planning Authority. The ESP shall be fully complied with during the construction phase unless otherwise agreed in writing by the Local Planning Authority. Reason: To provide employment and skills development opportunities as a result of the development, in accordance with Policy DM16 of the Eastleigh Borough Local Plan (2016-2036).
  26. Travel Plan Measures to encourage sustainable travel shall be implemented and monitored in accordance with the details set out in the Travel Plan prepared by i-Transport, dated 25 September 2025 (ref. OT/SG/DG/ITS19785-010), to include submission of monitoring reports to the Local Planning Authority on an annual basis for the first 5 years following occupation of the development. Reason: To encourage the use of alternative means of transport to the private car in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  27. Nutrient mitigation The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient outputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for which they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 and Policy DM11 of the Eastleigh Borough Local Plan (2016 – 2036).
  28. Conditions to comply with the Environment Act (2021) BNG management and monitoring The development shall not commence until a Habitat Management and Monitoring Plan (HMMP), prepared in accordance with the submitted Ecological Impact Assessment (ACD Environmental, 06.10.2025, ref. EBC24408_EcIA) and Biodiversity Net Gain Strategy (June 2025), has been submitted to and approved in writing by the Local Planning Authority along with a timetable for implementation. Thereafter those habitats shall be managed and maintained in accordance with the approved details for a minimum period of 30 years following completion. Reason: To ensure the development delivers a biodiversity net gain in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 and to accord with the Environment Act 2021, Schedule 14.
  29. BNG verification Notice in writing shall be given to the Local Planning Authority when the: a) Habitat creation and enhancement works as set out in the HMMP have commenced, and; b) Habitat creation and enhancement works as set out in the HMMP have been completed. Monitoring reports shall be submitted to the Local Planning Authority in writing in accordance with the methodology and frequency specified in the approved HMMP. Reason: To ensure the development delivers a biodiversity net gain in accordance with paragraph 2 Schedule 7A of the Town and Country Planning Act 1990 and policy DM11 and to accord with the Environment Act 2021, Schedule 14.
  30. Note to applicant: Southern Water requires a formal application for a connection to the public sewer. Please visit Southern Water’s Get Connected Service: Home. Please also refer to further advice from Southern Water set out in their comments dated 4 November 2025, including the request to liaise with Southern Water regarding landscaping in close proximity to public apparatus.
  31. Note to applicant: ESSO Petroleum Limited has apparatus situated near to the proposed works. The developer is advised to adhere to the Special Requirements for Safe Working: Special Requirements Brochure_Final_Rev 25.08_.pdf
  32. Note to applicant: The access and off-site highway works will require a separate S278 Agreement to be entered into with the Highway Authority. Details can be found via the following link: Section 278 agreement | Transport and roads | Hampshire County Council
  33. Note to applicant: The applicant is advised to continue to carry out technical work to investigate the potential for providing a direct link from the site to Little Hatts playground, and to work collaboratively with Botley Parish Council in relation to this matter.
  34. This application is subject to a S106 Legal Agreement dated 14 August 2026.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.