Council planning record

Installation of Heating, Ventilation, and Air Conditioning condensing equipment within protective cages.

UNIT F1, MANATON WAY, HEDGE END, SOUTHAMPTON, SO30 2XW

Decided PermitReference: F/25/100065Eastleigh Borough Council

Last published check: 13 Oct 2026, 18:05. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
12 Sept 2025
Validated
12 Sept 2025
Determination deadline
7 Nov 2025
Local authority
Eastleigh Borough Council

Application overview

Installation of Heating, Ventilation, and Air Conditioning condensing equipment within protective cages.

Proposal details

Reference
F/25/100065
Alternative references
14310040
Ward
Hedge End North Ward
Parish
Hedge End CP
Agent
Architecture Design Limited (Lee Ironmonger)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

UNIT F1, MANATON WAY, HEDGE END, SOUTHAMPTON, SO30 2XW

This record has no verified map location.

Documents 9 of 9

DocumentPublishedAction
F_25_100065 Delegated Officer Report (1)Officer Report · PDF21 Oct 2025View
F_25_100065 PL_Final DecisionDecision Notice · PDF21 Oct 2025View
Town CouncilConsultation Response2 Oct 2025View
Environmental HealthConsultation Response30 Sept 2025View
Location and Block PlansLocation Plan · PDF12 Sept 2025View
Elevations - Southern and NorthernElevations Plan · PDF12 Sept 2025View
Floor PlanFloor Plan · PDF12 Sept 2025View
Proposed Mechanical Layout PlanPlan · PDF12 Sept 2025View
Elevations - Eastern and WesternElevations Plan · PDF12 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_25_100065 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: Location and Block Plans 039.140/01 Floor Plans 039.140/02 Elevations 039.140/03 Elevations 039.140/04 Proposed Mechanical Layout Plan XXX/X/XXX rev P1 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.