Council planning record

Construction of a 70-bed care home (Use Class C2), with associated parking, landscaping, access, drainage, and other associated works following demolition of existing structures (amended plans received).

Land East of Chickenhall Lane,, Eastleigh, SO50 6AF

Decided PermitReference: F/24/98678Eastleigh Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
24 Dec 2024
Validated
9 Jan 2025
Determination deadline
6 Mar 2026
Local authority
Eastleigh Borough Council

Application overview

Construction of a 70-bed care home (Use Class C2), with associated parking, landscaping, access, drainage, and other associated works following demolition of existing structures (amended plans received).

Proposal details

Reference
F/24/98678
Alternative references
13593516
Ward
Eastleigh North Ward;Bishopstoke Ward
Parish
Bishopstoke CP;Eastleigh Town CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land East of Chickenhall Lane,, Eastleigh, SO50 6AF

This record has no verified map location.

Documents 133 of 133

DocumentPublishedAction
Land east of Chickenhall Lane discharge of Condition 10 200826Discharge Of Conditions Decision Notice · PDF20 Aug 2026View
S106 AgreementLegal Agreement · PDF10 Mar 2026View
F_24_98678 PL_Final DecisionDecision · PDF4 Mar 2026View
F_24_98678 Decision notice informative leaflet - PERMITDecision · PDF4 Mar 2026View
AMENDED - ENGROSSMENT Chickenhall Lane S106 02.02.26Legal Agreement Supporting Info · PDF2 Feb 2026View
SUPERSEDED - DRAFT Chickenhall Lane S106 29.01.26Legal Agreement Supporting Info · PDF30 Jan 2026View
Planning Application - Land East of Chickenhall Lane Eastleigh SO50 6AF Ref F2498678Committee Report · PDF4 Nov 2025View
ELAC Committee Presentation Nov 25Committee Report · PDF4 Nov 2025View
Landscape commentsConsultee Response · PDF22 Oct 2025View
AMENDED - Landscape General Arrangement PlanLandscape Plan · PDF17 Oct 2025View
AMENDED - Proposed Site Plan P22Site Layout Plan · PDF17 Oct 2025View
AMENDED - Planning Application Submission RegisterSupporting Documents · PDF17 Oct 2025View
Highway Works overlay plan ref. 024.0060-0007.P06 · PDF14 Oct 2025View
250930-PLANNING SUBMISSION REGISTER - CHICKENHALL v7Supporting Documents · PDF30 Sept 2025View
Habitat Management Monitoring Plan V.01 FINALSupporting Documents · PDF30 Sept 2025View
Ecology response 1 9 25 for F 24 98678 Land East of Chickenhall Lane, EastleighConsultee Response · PDF1 Sept 2025View
Urban Design comments re. daylightConsultation Response · PDF6 Aug 2025View
Consultation Response from Natural EnglandConsultation Response · PDF5 Aug 2025View
Ecology response 30 7 25 for F 24 98678 Land East of Chickenhall LaneConsultee Response · PDF30 Jul 2025View
Tree Officer further commentsConsultee Response · PDF28 Jul 2025View
Construction Environmental Management Plan V5_RedactedSupporting Documents · PDF25 Jul 2025View
Construction Environmental Management Plan V5 · PDF25 Jul 2025View
Ecological Impact Assessment Rev CEcological Assessment · PDF25 Jul 2025View
Urban Design comments July 2025Consultation Response · PDF24 Jul 2025View
HRA Appropriate Assessment for Land east of Chickenhall Lane 220725 · PDF22 Jul 2025View
LLFA confirmation of no further commentsConsultation Response · PDF15 Jul 2025View
Ecology response 14 7 25 for F24 98678 Land East of Chickenhall Lane, Eastleigh, SO50 6AFConsultation Response · PDF14 Jul 2025View
AMENDED General Arrangement Roof Plan-D0-P2 · PDF9 Jul 2025View
AMENDED Proposed First Floor Plan-D0-P11 · PDF9 Jul 2025View
AMENDED Proposed Ground Floor Plan-D0-P11 · PDF9 Jul 2025View
AMENDED Proposed Elevations - Sheet 1-D0-P9Elevations Plan · PDF9 Jul 2025View
AMENDED Proposed Second Floor Plan-D0-P11 · PDF9 Jul 2025View
AMENDED-Proposed Elevations - Sheet 2-D0-P9 · PDF9 Jul 2025View
SUPERSEDED - Proposed Site Plan-D0-P20Site Layout Plan · PDF9 Jul 2025View
Southern Water Response LetterConsultation Response · PDF8 Jul 2025View
Southern Water Map PrintConsultation Response · PDF8 Jul 2025View
Shading diagram June_6pm_Proposed_30.06.254 Jul 2025View
Shading diagram June_8am_Proposed_30.06.254 Jul 2025View
Shading diagram March_12_Proposed_30.06.254 Jul 2025View
Shading diagram March_8am_Proposed_30.06.254 Jul 2025View
Shadow diagram June_12_Proposed_30.06.254 Jul 2025View
Shading diagram March_6pm_Proposed_30.06.254 Jul 2025View
Amended CGI west elevation4 Jul 2025View
Photomontage - image from roundabout4 Jul 2025View
Amended CGI courtyard4 Jul 2025View
Flood Risk Assessment v3-App GFlood Risk Assessment · PDF30 Jun 2025View
AMENDED Arboricultural Method Statement v3Tree Info · PDF30 Jun 2025View
AMENDED Statutory BNG Metric Rev B June 202530 Jun 2025View
AMENDED Ecological Impact Appraisal Rev CEcological Assessment · PDF30 Jun 2025View
Flood Risk Assessment v3-App BFlood Risk Assessment · PDF30 Jun 2025View
Flood Risk Assessment v3-ReportFlood Risk Assessment · PDF30 Jun 2025View
AMENDED Noise Impact Assessment Addendum v3_RedactedNoise Report · PDF25 Jun 2025View
Further Environmental Health Noise commentsConsultation Response · PDF25 Jun 2025View
Environmental Health further comments air quality and CEMPConsultation Response · PDF19 Jun 2025View
Highway Authority further comments · PDF17 Jun 2025View
Further Urban Design Officer commentsConsultation Response · PDF13 Jun 2025View
Ecology response 12 6 25 for F24 98678 Land East of Chickenhall Lane, Eastleigh, SO50 6AFConsultee Response · PDF12 Jun 2025View
Letter re. traffic from Material Recycling Facility_RedactedSupporting Documents · PDF9 Jun 2025View
Shadowing Technical Note P3_RedactedSupporting Documents · PDF28 May 2025View
Shadow Habitats Regs Assessment 02.05.25Supporting Documents · PDF28 May 2025View
SUPERSEDED - Landscape General Arrangement PlanLandscape Plan · PDF28 May 2025View
Covering letter for amended and additional information_RedactedSupporting Documents · PDF28 May 2025View
UPDATED Air Quality Assessment v3Air Quality Report · PDF28 May 2025View
SUPERSEDED UPDATED Construction Environmental Management Plan v4 · PDF28 May 2025View
Applicant responses to consultation comments · PDF28 May 2025View
AMENDED CGIIllustration · PDF28 May 2025View
UPDATED Landscape Visual Statement Rev A · PDF28 May 2025View
River Barton Buffer Zone - Cross Section · PDF28 May 2025View
AMENDED Proposed Elevations - Sheet 1-D0-P8Elevations Plan · PDF28 May 2025View
Environment Agency comments 7 April 2025Consultation Response · PDF6 May 2025View
Lead Local Flood Authority (LLFA) further comments_RedactedConsultation Response · PDF9 Apr 2025View
Highway Authority further comments on impact of permitted Material Waste FacilityConsultation Response · PDF2 Apr 2025View
Design Review Panel Comments - F_24_98678 - Land East of Chickenhall Lane · PDF25 Mar 2025View
Refuse Store and Sub Station plansElevations And Floor Plan · PDF20 Mar 2025View
Ecology response 20 3 25 for F 24 98678 Land East of Chickenhall Lane, Eastleigh, SO50 6AFConsultee Response · PDF20 Mar 2025View
Drainage Technical Note TN03-Response to comments from EA, LLFA and Ecologist (1)_RedactedDrainage Plan · PDF18 Mar 2025View
Southern Water updated commentsConsultation Response · PDF13 Mar 2025View
Applicant statement re. trees · PDF13 Mar 2025View
Southern Water map GISConsultation Response · PDF10 Mar 2025View
Eastleigh Town Council Objection letter F 24 98678Consultation Response6 Mar 2025View
Highway responseConsultation Response · PDF14 Feb 2025View
Planning Policy commentsConsultation Response · PDF14 Feb 2025View
Tree Officer responseConsultee Response · PDF6 Feb 2025View
Ecology responseConsultee Response · PDF6 Feb 2025View
LLFA (Lead Local Flood Authority) ResponseConsultation Response · PDF4 Feb 2025View
Environmental Health Comments Air QualityConsultation Response · PDF31 Jan 2025View
Environment Agency commentsConsultation Response · PDF29 Jan 2025View
Southampton Airport holding responseConsultation Response · PDF28 Jan 2025View
SSEN advice letterConsultation Response · PDF24 Jan 2025View
SGN advice - Valve safety advice · PDF24 Jan 2025View
SGN advice letterConsultation Response · PDF24 Jan 2025View
Utilities Services search response · PDF24 Jan 2025View
SGN advice - Dig Safely Measures to avoid injury and damage to gas pipes · PDF24 Jan 2025View
SSEN safety advice Watch_it_SSEN_Dist · PDF24 Jan 2025View
SGN Map key · PDF24 Jan 2025View
SSEN Guide to Interpreting map · PDF24 Jan 2025View
Southern Gas Network (SNG) map · PDF24 Jan 2025View
Urban Design Officer commentsConsultation Response · PDF24 Jan 2025View
Scottish and Southern Electricity Networks (SSEN) map · PDF24 Jan 2025View
SGN advice - Know what's below · PDF24 Jan 2025View
Natural England commentsConsultation Response · PDF23 Jan 2025View
Environmental Health comments NoiseConsultation Response · PDF22 Jan 2025View
Environmental Health comments Contamianted LandConsultation Response · PDF17 Jan 2025View
Southern Water map GIS · PDF16 Jan 2025View
Southern Water holding responseConsultation Response · PDF16 Jan 2025View
Heritage Officer commentsConsultation Response · PDF16 Jan 2025View
Application with Amended Certificate B_Redacted · PDF9 Jan 2025View
Application with Amended Certificate B · PDF9 Jan 2025View
Noise Impact Assessment v5_RedactedSubsistence Fee - Public · PDF31 Dec 2024View
Ground Condition Assessment- v2_Part2_RedactedSupporting Documents · PDF31 Dec 2024View
Artificial Lighting Assessment v3_RedactedSupporting Documents · PDF31 Dec 2024View
Transport Statement v4_RedactedSupporting Documents · PDF30 Dec 2024View
SUPERSEDED Illustration 2Illustration24 Dec 2024View
Illustration 3Illustration24 Dec 2024View
Site Location PlanLocation Plan · PDF24 Dec 2024View
Topographical and Drainage SurveySupporting Documents · PDF24 Dec 2024View
Planning Design Access Statement_Part 2Supporting Documents · PDF24 Dec 2024View
Ground Condition Assessment v2_Part1Supporting Documents · PDF24 Dec 2024View
Bird Hazard Management PlanSupporting Documents · PDF24 Dec 2024View
Planning Design Access StatementSupporting Documents · PDF24 Dec 2024View
Proposed Bike Store PlanPlan · PDF24 Dec 2024View
Proposed Site SectionsSection Plan · PDF24 Dec 2024View
Proposed Demolition PlanPlan · PDF24 Dec 2024View
Proposed Garden BuildingPlan · PDF24 Dec 2024View
Nutrient_Calculator_Itchen_SAC_V_03_01_3Supporting Documents24 Dec 2024View
Proposed Elevations and Floor Plans bin store and substationPlans · PDF24 Dec 2024View
Landscape Visual StatementSupporting Documents · PDF24 Dec 2024View
Landscape and Ecological Management PlanSupporting Documents · PDF24 Dec 2024View
Sustainability StatementSupporting Documents · PDF24 Dec 2024View
Minerals Resource Assessment.pdf · PDF24 Dec 2024View
Travel Plan v3Supporting Documents · PDF24 Dec 2024View
Planning Needs AssessmentSupporting Documents · PDF24 Dec 2024View
Illustration 1Illustration24 Dec 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
Land east of Chickenhall Lane discharge of Condition 10 200826 F_24_98678 PL_Final Decision F_24_98678 Decision notice informative leaflet - PERMIT
Planning conditions
  1. Implementation timeframe The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. Approved plans The development hereby permitted shall be implemented in accordance with the following plans numbered: • 0101 P5 – Site Location Plan • 0102 P22 – Proposed Site Plan • 0201 P11 – Proposed Ground Floor Plan • 0211 P11 – Proposed First Floor Plan • 0221 P11 – Proposed Second Floor Plan • 2701 P2 – General Arrangement Roof Plan • 0301 P9 – Proposed Elevations – Sheet 1 • 0302 P9 – Proposed Elevations – Sheet 2 • 9005 P1 – Proposed Demolition Plan • 9006 P1 – Proposed Bike Store • 9007 P1 – Refuse and Sub Station • 9008 P2 – Proposed Garden Building • 0403 P3 - Proposed Site Sections • DD679L01 G – Landscape General Arrangement Plan • Proposed River Barton Buffer Zone plan Reason: For the avoidance of doubt and in the interests of proper planning.
  3. Habitats regulations The development hereby permitted shall not be commenced for a period of at least 21 days from the date of this decision. Reason: To comply with Section 28I (6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  4. Contaminated land remedial scheme No works shall commence on site until a detailed site-specific scheme for remedial works and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed and proposals for future maintenance and monitoring has been submitted to and approved by the LPA, in accordance with the agreed Ground Conditions Assessment Report (Ground Conditions Consultants, October 2024, Version 2.0. Report reference J24-018-R03). Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Reason: To minimise the risk from land contamination for the safety of the future occupiers/ users of the development, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  5. Contaminated land verification The development hereby permitted shall not be occupied / brought into use until there has been submitted to the LPA verification by the competent person approved under the provisions of condition 3 above (remediation) that any remediation scheme required and approved under the provisions of condition 3 has been implemented fully in accordance with the approved details (unless varied with the written permission of the LPA in advance of implementation). Unless agreed in writing with the LPA such verification shall comply with UK Land contamination risk management (LCRM). Typically such a report would comprise: a. A description of the site and its background, and summary of relevant site information; b. a description of the remediation objectives and remedial works carried out; c. verification data, including - data (sample locations/analytical results, as-built drawings of the implemented scheme, photographs of the remediation work in progress, etc. d. Certificates demonstrating that imported and/or material left in situ is free from contamination, confirmation of material removal, gas/vapour membranes have been installed correctly. Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition above (remediation) Reason: To minimise the risk from land contamination for the safety of the future occupiers/ users of the development in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  6. Construction Environmental Management Plan The construction of the development shall take place in accordance with the details and methodologies set out in the Construction Environmental Management Plan Version 5 (Highwood Construction, 2025), or in accordance with alternative details that shall have first been submitted to and approved in writing by the Local Planning Authority through formal condition submission. Reason: To limit the impact the development has on the amenity of the locality and to protect biodiversity, in accordance with Policies DM1, DM8 and DM11 of the Eastleigh Borough Local Plan 2016-2036.
  7. Tree protection The development must accord with the Arboricultural Method Statement reference JFA0340 V3. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  8. Access provision No development shall start on site until the access, including the footway, shall be constructed and lines of sight provided in accordance with the approved plans. The lines of sight splays shown on the approved plans shall be kept free of any obstruction exceeding 1m in height above the adjacent carriageway and shall be subsequently maintained so thereafter. Reason: To provide satisfactory access and in the interest of highway safety, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  9. Parking provision Prior to occupation of the development hereby permitted, provision for parking shall have been made in accordance with the approved plans and shall thereafter be retained. Reason: To ensure adequate on-site car parking provision for the development and in the interest of highway safety in accordance with Policy DM13 of the Eastleigh Borough Local plan (2016-2036).
  10. Materials Prior to any development above foundation / slab level, full details of the proposed external materials for the development, including facing and roofing materials, window, parapet, balcony and rainwater goods details and hard surfacing, shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details. Reason: To ensure a high quality design in the interest of visual amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  11. Drainage strategy provision and maintenance The drainage scheme shall be installed and thereafter managed and maintained in accordance with the details and associated plans set out in the Flood Risk Assessment & Drainage Strategy Report (Jubb, November 2024, ref. 24305_FRA01) and the Technical Note V3 (Jubb,16.03.2025). Reason: To ensure suitable drainage to prevent flood risk and pollution to watercourses, in accordance with Policies DM5 and DM6 of the Eastleigh Borough Local Plan (2016-2036).
  12. Finished floor levels The finished floor levels of the development shall be set no lower than 11.60.AODm above Ordnance Datum (AOD) as stated in section 2.1.1 of the Technical Note V3 (Jubb,16.03.2025), and shall be retained as such for the lifetime of the development. Reason: To reduce the risk of flooding to the proposed development and future occupants, in accordance with Policy DM5 of the Eastleigh Local Plan (2016-2036).
  13. Ecological mitigation The development shall be carried out in accordance with the ecological and protected species mitigation measures set out in the submitted Ecological Impact Appraisal (FPCR Environment & Design, dated June 2025). Reason: To ensure that protected species are not harmed by the development and to achieve biodiversity enhancements in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  14. Lighting The external lighting scheme for the development shall be carried out and thereafter maintained in accordance with the details set out in the submitted Artificial Lighting Assessment Version 3 (Dice Environmental, 9 December 2024, ref. 101358), or in accordance with alternative details that shall have first been submitted to and approved in writing by the Local Planning Authority through formal condition submission. Reason: In the interest of visual amenity and to avoid harm to protected species, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  15. Boundary treatment Notwithstanding the details shown on the approved plans, no development above foundation / slab level shall take place until full details of all boundary treatments and enclosures, to include details of the substation enclosure, have been submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall thereafter be installed in accordance with the approved details. Reason: In the interest of visual amenity in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  16. Roof mounted plant and equipment Prior to any development above foundation / slab level, details of any roof mounted plant and equipment including solar PV panels, and details of any barriers and enclosures, shall be submitted to and approved in writing by the Local Planning Authority. The plant and equipment shall thereafter be installed in accordance with the approved details. Reason: In the interest of visual amenity in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  17. Landscaping a) The landscaping shall be carried out in accordance with Landscape General Arrangement Plan ‘DD679L01 REV G’, and in accordance with detailed planting plans to 1:200 scale that have first been submitted to and approved in writing by the Local Planning Authority. b) The landscaping shall be carried out in accordance with the approved details in the first planting season following occupation of the development, or completion of the development (whichever is sooner), unless an alternative timetable is first submitted to and approved in writing by the Local Planning Authority. c) If, within a period of 10 years after planting, any tree or plant is removed, dies or becomes, in the opinion of the Local Planning Authority, seriously damaged, defective or diseased, another tree or plant of the same species and size as that originally approved shall be planted at the same place within the next planting season, unless the Local Planning Authority gives its written consent to any variation. Reason: In the interest of visual amenity in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  18. Refuse and recycling Prior to occupation of the development hereby permitted, the facilities for the storage of refuse and recycling shall be provided in accordance with the approved plans and retained for such purposes thereafter. Reason: To ensure suitable refuse storage in the interest of amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  19. Cycle storage provision Prior to occupation of the development hereby permitted, the cycle storage facilities for staff and visitors shall be provided in accordance with the approved plans and retained thereafter. Reason: To encourage the use of sustainable means of transport in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  20. Travel Plan implementation Measures to encourage sustainable travel shall be implemented in accordance with the details set out in the Travel Plan prepared by Paul Basham Associates dated December 2024 (ref. 024.0060/TP/3). Reason: To encourage the use of alternative means of transport to the private car, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  21. Noise mitigation The development shall be carried out in accordance with the noise mitigation measures set out in the Noise Impact Assessment Version 5 (Dice Environmental, 9th December 2024, ref. 101358) and the Noise Impact Assessment Addendum Version 3 (Dice Environmental, 17th June 2025, ref. 101358). Reason: To ensure that future occupants will be protected from adverse noise impacts in accordance with Policy DM8 of the Eastleigh Local Plan (2016-2036).
  22. Noise mitigation verification Prior to the first occupation of the development hereby approved, a post-completion acoustic assessment shall be carried out by a suitably qualified acoustic consultant. The assessment shall demonstrate that the internal noise levels within habitable rooms and external amenity areas meet the criteria set out in the Noise Impact Assessment Version 5 (Dice Environmental, 9th December 2024, ref. 101358) and the Noise Impact Assessment Addendum Version 3 (Dice Environmental, 17th June 2025, ref. 101358). Reason: To ensure that future occupants will be protected from adverse noise impacts in accordance with Policy DM8 of the Eastleigh Local Plan (2016-2036).
  23. BREEAM Within 3 months following occupation of the care home, a report demonstrating how the development meets the relevant BREEAM requirements including a New Construction Post Construction certificate at ‘Excellent’ standard, shall be submitted to and approved in writing by the local Planning Authority. Reason: To ensure that the development meets required sustainability standards in accordance with Policy DM2 of the Eastleigh Borough Local Plan (2016-2036).
  24. Electric vehicle charging The development shall not be occupied until electric vehicle (EV) charging infrastructure has been installed in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority. Details must include: - Total number, type, location and operation of EV charging points; - Passive provision for future EV charging; - A timeline for installation and maintenance. Reason: To promote sustainable travel to reduce air pollution and support climate change mitigation, in accordance with Policies DM3 and DM8 of the Eastleigh Borough Local Plan (2016-2036).
  25. Bird Hazard Management Plan The development shall be carried out in accordance with the mitigation measures set out in the Bird Hazard Management Plan (FPCR, November 2024). Reason: To reduce the risk to birds due to the close proximity to Southampton Airport.
  26. Nutrient mitigation The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nutrient impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 and Policy DM11 of the Eastleigh Borough Local Plan (2016 – 2036).
  27. Conditions to comply with the Environment Act 2021 BNG management and monitoring On-site habitat shall be created, managed and monitored in accordance with the details set out in the Habitat Management and Monitoring Plan V.01 (FPCR, 29/09/2025), unless any amendments are first submitted to and agreed in writing by the Local Planning Authority. This shall include monitoring of habitats for a 30 year period, with monitoring reports submitted to the Local Planning Authority for approval in years 2, 3, 5, 10, 15, 20, 25 and 30. Reason: To ensure delivery of at least 10% biodiversity net gain as required by the Environment Act (2021) and to comply with policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  28. BNG verification Notice in writing shall be given to the Local Planning Authority when the: a) Habitat creation and enhancement works as set out in the Habitat Management and Monitoring Plan V.01 (FPCR, 20/09/2025), have commenced, and; b) Habitat creation and enhancement works as set out in the Habitat Management and Monitoring Plan V.01 (FPCR, 20/09/2025), have been completed. Reason: To ensure delivery of at least 10% biodiversity net gain as required by the Environment Act (2021) and to comply with policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  29. Note to applicant: The access works will require a separate S278 Legal Agreement to be entered into. Details can be found via the following link: Section 278 agreement | Transport and roads | Hampshire County Council
  30. Note to applicant: Given the nature of the proposed development, it is possible that a crane may be required during its construction. Please note the requirement within the British Standard Code of Best Practice for the safe use of Cranes, for crane operators to consult the aerodrome before erecting a crane in close proximity to an aerodrome. This is explained further in Advice Note 4 – Cranes.
  31. Note to applicant: Southern Water will require a formal application for connection and on-site mains to be made by the developer. This can be made via Southern Water’s online Get Connected service at: Home
  32. Note to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.