Council planning record

Conversion of meeting room into 1.no four bed dwelling

78 CHALK HILL, WEST END, SOUTHAMPTON, SO18 3DB

Decided PermitReference: F/24/98611Eastleigh Borough Council

Last published check: 28 Sept 2026, 01:40. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
9 Dec 2024
Validated
12 Dec 2024
Determination deadline
7 Mar 2025
Local authority
Eastleigh Borough Council

Application overview

Conversion of meeting room into 1.no four bed dwelling

Proposal details

Reference
F/24/98611
Alternative references
13626056
Ward
West End South Ward
Parish
West End CP
Agent
BPS Design Consultants Ltd (Mr Robert Narramore)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

78 CHALK HILL, WEST END, SOUTHAMPTON, SO18 3DB

This record has no verified map location.

Documents 19 of 19

DocumentPublishedAction
F_24_98611 PL_Final DecisionDecision Notice · PDF4 Mar 2025View
Officer Report F 24 98611Officer Report · PDF4 Mar 2025View
Legal Agreement ReceiptLegal Agreement Supporting Info · PDF28 Feb 2025View
Proposed elevations, floor, roof and cycle storage plansElevations And Floor Plan · PDF14 Feb 2025View
Proposed Site PlanSite Layout Plan · PDF14 Feb 2025View
Ecological Impact AssessmentEcological Assessment · PDF13 Feb 2025View
Proposed Work Compound (during renovation works)Plan · PDF13 Feb 2025View
Existing Elevations and Floor PlansElevations And Floor Plan · PDF13 Feb 2025View
Ecology OfficerConsultee Response · PDF13 Feb 2025View
Existing Block PlanSite Layout Plan · PDF13 Feb 2025View
Natural EnglandConsultation Response · PDF4 Feb 2025View
Ecology OfficerConsultee Response · PDF22 Jan 2025View
Tree OfficerConsultee Response · PDF22 Jan 2025View
Nitrate Stage 1.pdfSupporting Documents · PDF9 Dec 2024View
Application Form RedactedApplication Form · PDF9 Dec 2024View
Nitrate Stage 3.pdfSupporting Documents · PDF9 Dec 2024View
Nitrate Developement Site Details.pdfSupporting Documents · PDF9 Dec 2024View
Design and Access StatementDesign And Access Statement · PDF9 Dec 2024View
Nitrate Stage 4.pdfSupporting Documents · PDF9 Dec 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_24_98611 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans: PL/01, PL/02RevA, PL/03, PL/04RevA & PL/05. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The development shall be carried out in accordance with the approved ecological impact assessment, by LC Ecological Services, dated February 2025. All enhancements and planting (listed in section 8 of the ecological impact assessment & shown on the approved block plan) shall be fully installed by the end of the first planting season following completion of the development. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as the approved details.
  4. No excavation, demolition or development related works shall take place on site until an arboricultural method statement and a tree protection plan have been submitted to and approved in writing by the Local Planning Authority. The information shall be in accordance with British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations). The development shall be carried out in accordance with the approved documents and may only be modified subject to written agreement from the Local Planning Authority. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  5. No excavation, demolition or development related works shall take place on site until a precautionary working method statement to protect bats and nesting birds has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved approved details. Reason: To prevent harm to bats and nesting birds.
  6. The development hereby approved shall be carried out in accordance with the Proposed Work Compound plan (drawing PL/05) Reason: To limit the impact the development has on ecology.
  7. The materials to be used must match as closely as possible, in type, colour and texture those listed on the application form and on the approved elevation plans. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  8. No vegetation clearance shall occur on site during the bird nesting season [between 1st March & 31st August] unless a suitably qualified ecologist has checked that the vegetation to be removed does not contain nesting birds within 24 hours before the start of works. If any active nests are found, work must stop, and a 5 m buffer must be erected around the nest to protect it from disturbance until after the birds have fledged and left the nest. Reason: To prevent harm to nesting birds.
  9. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  10. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  12. Note to Applicant: - In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be informed. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/imworking-on-a-building-with-bats/ive-found-a-bat-during-works. - The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) - Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ). Photos 10 and 11 show ideal elevations for swift nest boxes.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.