Council planning record

Installation of 1no. floating pontoon between piles V23 & V24

Upper area of the River Hamble, between piles V23 and V24, opposite Swanwick Marina,

Decided PermitReference: F/24/98269Eastleigh Borough Council

Last published check: 28 Sept 2026, 17:23. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
25 Sept 2024
Validated
30 Sept 2024
Determination deadline
25 Nov 2024
Local authority
Eastleigh Borough Council

Application overview

Installation of 1no. floating pontoon between piles V23 & V24

Proposal details

Reference
F/24/98269
Alternative references
13373857
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Upper area of the River Hamble, between piles V23 and V24, opposite Swanwick Marina,

This record has no verified map location.

Documents 18 of 18

DocumentPublishedAction
F_24_98269 Delegated Officer ReportOfficer Report · PDF7 Nov 2024View
F_24_98269 PL_Final DecisionDecision Notice · PDF7 Nov 2024View
Design and access statementDesign And Access Statement · PDF7 Nov 2024View
HRA F-24-98269Officer Notes · PDF23 Oct 2024View
Environmental HealthConsultation Response · PDF14 Oct 2024View
Natural EnglandConsultation Response · PDF9 Oct 2024View
Built Heritage ConsultantConsultation Response8 Oct 2024View
River Hamble Harbour AuthorityConsultation Response · PDF8 Oct 2024View
Ecology response amended for F 24 98269 Upper area of the River Hamble, between piles V23 and V24, opposite Swanwick MarinaConsultee Response · PDF3 Oct 2024View
Fareham Borough CouncilConsultation Response · PDF3 Oct 2024View
Site Location PlanPlan · PDF3 Oct 2024View
Ecology response for F 24 98269 Upper area of the River Hamble, between piles V23 and V24, opposite Swanwick MarinaConsultee Response · PDF2 Oct 2024View
MMOConsultation Response · PDF2 Oct 2024View
Location PlanLocation Plan · PDF25 Sept 2024View
Covering letter.pdfPlanning Statement · PDF25 Sept 2024View
Proposed ElevationsElevations Plan · PDF25 Sept 2024View
SUPERSEDED Design and access statement.pdfDesign And Access Statement · PDF25 Sept 2024View
Application Form RedactedApplication Form · PDF25 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_24_98269 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Location Plan and Proposed Elevations Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No development shall commence on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include: Details on the storage and disposal of waste and equipment on site;Details on how dust/sediment/concrete/other debris that may be accidentally released during construction or through surface run-off will be captured to prevent them entering the water;Detail of Biosecurity to ensure that all equipment brought onto the site does not bring any contaminants such as invasive species onto the site and into the water;Use of coatings/treatments for any timber that are suitable for use in the marine environment;Details on the use of spill kits and the reporting of any spillages; Hours of working. Construction work shall only take place in accordance with the approved CEMP. Reason: To ensure no adverse impact on the integrity of the protected waters, in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  4. Note to applicant: You are required to apply separately for permission from the River Hamble Harbour Authority, The Crown Estate and the Marine Management Organisation.
  5. Note to applicant: Please refer to the following links for further advice on Marine Licencing: Planning and development: Marine licences - GOV.UK (www.gov.uk); Make a marine licence application - GOV.UK (www.gov.uk).
  6. Note to applicant: The pontoon must have a gap of between 1.5 metres and 3 metres between each pile and the end of the pontoon.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.