Council planning record

Construction of a replacement two-storey, five-bedroom dwelling, including a lower ground floor, following the demolition of the existing bungalow (AMENDED DESCRIPTION)

56 NICHOL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5AW

Decided PermitReference: F/24/97874Eastleigh Borough Council

Last published check: 29 Sept 2026, 05:31. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
22 Jul 2024
Validated
23 Jul 2024
Determination deadline
8 Nov 2024
Local authority
Eastleigh Borough Council

Application overview

Construction of a replacement two-storey, five-bedroom dwelling, including a lower ground floor, following the demolition of the existing bungalow (AMENDED DESCRIPTION)

Proposal details

Reference
F/24/97874
Alternative references
13266758
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Agent
MDT Design (Mr Matthew Tate)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

56 NICHOL ROAD, CHANDLER'S FORD, EASTLEIGH, SO53 5AW

This record has no verified map location.

Documents 17 of 17

DocumentPublishedAction
F_24_97874 Delegated Officer ReportOfficer Report · PDF8 Nov 2024View
F_24_97874 PL_Final DecisionDecision Notice · PDF8 Nov 2024View
AMENDED Proposed Elevations, Floor Plans and Site layoutPlans · PDF7 Nov 2024View
Proposed Materials ListIllustration · PDF25 Oct 2024View
AMENDED Site and Location PlanSite Layout Plan · PDF24 Oct 2024View
Consultation response regarding environmental noiseConsultation Response · PDF18 Oct 2024View
Consultation response regarding contaminated land, air quality and other pollution issuesConsultation Response · PDF18 Oct 2024View
Ecology response 17 10 24 for F 24 97874 56 NICHOL ROAD, CHANDLER'S FORDConsultee Response · PDF17 Oct 2024View
Neighbour Comments - 54 Nichol RoadNeighbour Correspondence · PDF19 Aug 2024View
Arboricultural Method StatementTree Info · PDF23 Jul 2024View
SUPERSEDED Proposed Elevations, Floor Plans and Site layout · PDF22 Jul 2024View
SUPERSEDED Site and Location Plan · PDF22 Jul 2024View
Existing Site and Floor Plans and ElevationsPlans · PDF22 Jul 2024View
Design and Access StatementDesign And Access Statement · PDF22 Jul 2024View
Cover letter 56 Nichol Rd.pdfPlanning Statement · PDF22 Jul 2024View
ApplicationFormRedacted.pdfApplication Form · PDF22 Jul 2024View
Ecological Impact Assessment FINAL Report 080822Ecological Assessment · PDF8 Aug 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_24_97874 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 01_B, 02_H, and 03_B. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building or otherwise comply with the details in the submitted Proposed Materials List. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  4. No demolition or construction works involving excavation shall start until a Construction Environment Management Plan (CEMP) has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved CEMP which shall include: a) the location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities; f) provision for storage, collection, and disposal of waste from the development during demolition and construction period; g) measures to prevent mud and dust on the highway during demolition and construction; h) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; i) temporary lighting; j) protection of pedestrian routes during construction; k) temporary surface water drainage provisions; and l) hours of working Reason: To limit the impact the development has on the amenity of the locality.
  5. A watching brief should be followed at all times during demolition and construction works and confirmation of this shall be submitted to the Local Planning Authority (LPA) prior to completion. In the event that previously unidentified contamination is found during the watching brief it must be immediately reported to the Local Planning Authority. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, has been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required by the Local Planning Authority, the development shall not be brought into use until a verification report for the remediation work has been submitted to and approved in writing by the Local Planning Authority. Verification works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
  6. No development shall start until a precautionary working method for the protection of slow worms, common toads, stag beetles, hedgehogs and water shrews has been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To protect and enhance biodiversity.
  7. The development hereby permitted shall be implemented in accordance with the recommendations outlined in the Bat Survey Report (Hampshire Ecological Services, October 2024). Reason: To protect and enhance biodiversity.
  8. The development must accord with the arboricultural report reference Q5405. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  9. No additional or altered first-floor windows shall be constructed in the side elevations of the development hereby approved. Reason: To protect the amenity and privacy of the adjoining residential properties.
  10. Note to Applicant: A common pipistrelle bat emerged from under a roof slate on the second survey so a third survey was needed to inform a bat license application. The bat license can only be applied for after planning permission has been granted. If work has not started before the end of September 2025 an update walkover survey will be required prior to development.
  11. Note to Applicant: The site is within an area of maximum radon potential of 3-5%. Further consideration needs to be given to the radon risk. As general advice, all developers should: Consult the Radon UK map (UKradon - UK maps of radon) - if they're in an area above 1%, developers should buy the UK Health Agency Radon report (for approximately £4.00) and check their development. Details on the findings on radon risk should be submitted to the LPA. If this gives an answer that is greater than 1%, they should consider Radon protection for new developments. If the answer is greater than 3% then Radon protection will be needed according to Building Regulations, with basic protection required at 3-10% and full protection above 10%.
  12. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning and Building, Building Control, then select 'Considerate Builders Advice Note'.
  13. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.