Council planning record

A new permanent building to house a centrifuge; alongside a balancing tank, sludge cake skip and adjacent hard standing for temporary pallet storage at the site known as River Itchen Water Treatment Works (WTW), Allington Lane, Southampton, SO30 3HQ.

River Itchen Water Treatment Works, Allington Lane,, Southampton,, SO30 3HQ

Decided PermitReference: F/24/97844Eastleigh Borough Council

Last published check: 29 Sept 2026, 06:02. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
18 Jul 2024
Validated
18 Jul 2024
Determination deadline
12 Sept 2024
Local authority
Eastleigh Borough Council

Application overview

A new permanent building to house a centrifuge; alongside a balancing tank, sludge cake skip and adjacent hard standing for temporary pallet storage at the site known as River Itchen Water Treatment Works (WTW), Allington Lane, Southampton, SO30 3HQ.

Proposal details

Reference
F/24/97844
Alternative references
13240495
Ward
West End North Ward
Parish
West End CP
Agent
Ms Debra Higginbotham

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

River Itchen Water Treatment Works, Allington Lane,, Southampton,, SO30 3HQ

This record has no verified map location.

Documents 24 of 24

DocumentPublishedAction
F_24_97844 PL_Final DecisionDecision Notice · PDF12 Sept 2024View
F_24_97844 Decision notice informative leaflet - PERMITDecision · PDF12 Sept 2024View
Ecology response F.24.97844 centrifuge River Itchen Water Treatment WorksConsultee Response · PDF12 Sept 2024View
F_24_97844 Delegated Officer ReportOfficer Report · PDF10 Sept 2024View
Hampshire HighwaysConsultee Response · PDF14 Aug 2024View
Environmental Health (Pollution) - WaterworksConsultee Response · PDF10 Aug 2024View
Environmental Health (Noise) - Water WorksConsultee Response · PDF30 Jul 2024View
Typical sectionSection Plan · PDF18 Jul 2024View
23708River Itchen Works FRA Rev B.pdfFlood Risk Assessment · PDF18 Jul 2024View
Ecological AssessmentEcological Assessment · PDF18 Jul 2024View
Block PlanBlock Plan · PDF18 Jul 2024View
CEMP.pdf · PDF18 Jul 2024View
The_Statutory_Biodiversity_Metric_River Itchen fv2.xlsx18 Jul 2024View
UK Habitat Baseline plan.pdf · PDF18 Jul 2024View
SITE LAYOUTSite Layout Plan · PDF18 Jul 2024View
BNG enhancement · PDF18 Jul 2024View
River Itchen WTW Planning Statement.pdfPlanning Statement · PDF18 Jul 2024View
ElevationsElevations Plan · PDF18 Jul 2024View
GENERAL SITE PLAN.pdfSite Layout Plan · PDF18 Jul 2024View
23708 River Itchen Works TS Rev B.pdf · PDF18 Jul 2024View
Acoustic Data Hiller Nov 2020 T0011 0006EN.pdf · PDF18 Jul 2024View
River Itchen WTW BNG Covering Letter fv2_RedactedAcknowledgement Letter · PDF18 Jul 2024View
Centrifuge Building Site Layout PlanSite Layout Plan · PDF5 Jun 2024View
Centrifuge Building - Proposed Location PlanLocation Plan · PDF20 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_24_97844 PL_Final Decision F_24_97844 Decision notice informative leaflet - PERMIT
Planning conditions
  1. Environment Act 2021 The development hereby approved shall not be brought into use until details of how the development will achieve a biodiversity net-gain of at least 10%. The base date for measuring this improvement shall be from the date of submission of the planning application and details shall include a timescale for the implementation of the proposed measures and their future management. The development shall be carried out in accordance with the approved details. Reason: To accord with the Environment Act 2021, Schedule 14.
  2. Town and Country Planning Act 1990 The Town and Country Planning (Development Management Procedure) (England) Order 2015 The development hereby permitted shall be implemented in accordance with the following plans numbered: 23708-GAP-XX-XX-DR-C-9001 P04; 23708-GAP-XX-XX-DR-C 9002 P01; 23708-GAP-XX-XX-DR-C 9050 P02; 23708-GAP-XX-XX-DR-C 9052 P01; 23708-GAP-XX-XX-DR-C 9201 P04; 23708-GAP-XX-XX-DR-C 9202 P03; 23708-GAP-XX-XX-DR-C 9501 P01; & 55-91-128H. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  4. All construction or demolition work shall be undertaken in accordance with the submitted Construction Environmental Management Plan by SLR Consulting, dated 12 July 2024 Revision:01. Reason: To limit the impact the development has on the amenity of the locality and local ecology.
  5. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  6. The materials to be used must match as closely as possible, in type, colour and texture those listed on approved Elevations drawing '23708-GAP-XX-XX-DR-C 9201 P04'. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  7. Prior to the installation of the proposed DP37 centrifuge, an acoustic assessment shall be submitted to the Local Planning Authority to demonstrate that the sound rating level LAr,Tr of the plant when operating does not exceed the representative background sound level (LA90) at any residential curtilage established for the daytime (07:00 hours to 18:00 hours); evening (18:00 hours to 23:00 hours) and nighttime (23:00 hours to 07:00 hours) periods of interest. The assessment shall include full details of any mitigation measures necessary to achieve this standard for approval by the Local Planning Authority. Approved mitigation measures shall be implemented before the first operation of the plant and thereafter maintained. Reason: To protect the amenity of nearby residents.
  8. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  9. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.