Council planning record

Conversion of offices (Class E) to form 2.No HMO's each for 7 unrelated persons (sui generis), single storey side/rear extension to No 107, amenity space, parking and alterations to fenestration

107 LEIGH ROAD, EASTLEIGH, SO50 9DR

Decided PermitReference: F/24/97730Eastleigh Borough Council

Last published check: 29 Sept 2026, 06:20. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
9 Jul 2024
Validated
16 Jul 2024
Determination deadline
10 Sept 2024
Local authority
Eastleigh Borough Council

Application overview

Conversion of offices (Class E) to form 2.No HMO's each for 7 unrelated persons (sui generis), single storey side/rear extension to No 107, amenity space, parking and alterations to fenestration

Proposal details

Reference
F/24/97730
Alternative references
13204484
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP
Agent
Mr Oliver Farr

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

107 LEIGH ROAD, EASTLEIGH, SO50 9DR

This record has no verified map location.

Documents 21 of 21

DocumentPublishedAction
F_24_97730 Delegated Officer ReportOfficer Report · PDF9 Sept 2024View
F_24_97730 PL_Final DecisionDecision Notice · PDF9 Sept 2024View
F_24_97730 Decision notice informative leaflet - PERMITDecision · PDF9 Sept 2024View
F_24_97730 Legal Agreement Receipt · PDF5 Sept 2024View
AMENDED - Site and Location Plan - REV GSite Layout Plan · PDF4 Sept 2024View
Southern Water - Leigh RdConsultee Response · PDF30 Aug 2024View
AMENDED - Proposed Floor Plans - REV GFloor Plan · PDF19 Aug 2024View
AMENDED - Proposed Elevations - REV EElevations Plan · PDF15 Aug 2024View
F_24_97730 - Habitat Regulations Assessment Aug 24Ecological Assessment · PDF12 Aug 2024View
107-109 Leigh Rd - Itchen Nutrient Budget Calculator FinalEcological Assessment12 Aug 2024View
Environmental Health (Pollution) - Leigh RdConsultee Response · PDF9 Aug 2024View
Eastleigh Town CouncilParish Response · PDF9 Aug 2024View
HighwaysConsultation Response · PDF5 Aug 2024View
Ecology response for F 24 97730 107 LEIGH ROAD, EASTLEIGHConsultee Response · PDF17 Jul 2024View
Environmental Health (Noise) - Leigh RdConsultee Response · PDF17 Jul 2024View
SUPERSEDED - Site and Location PlansPlans · PDF9 Jul 2024View
Design and Access StatementDesign And Access Statement · PDF9 Jul 2024View
Existing Ground Floor and First Floor, Elevations PlansElevations And Floor Plan · PDF9 Jul 2024View
SUPERSEDED - Proposed ElevationsElevations Plan · PDF9 Jul 2024View
SUPERSEDED - Proposed Ground Floor and First Floor PlansFloor Plan · PDF9 Jul 2024View
Eastleigh BC Biodiversity Checklist.pdfEcological Assessment · PDF17 Jun 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_24_97730 PL_Final Decision F_24_97730 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: PG.9066 · 24 · 01, PG.9066 · 24 · 02 Rev. G, PG.9066 · 24 · 03 Rev. E & PG.9066 · 24 · 04 Rev. G. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  4. No development shall start until details of a sustainable drainage system have been submitted to and approved in writing by the local planning authority. The details shall include a timetable for its implementation and a management/ maintenance plan for the lifetime of the development. The system shall be implemented and thereafter managed and maintained in accordance with the approved details. Reason: To ensure satisfactory drainage for the development.
  5. No excavation, demolition or development related works shall take place on site until an arboricultural method statement and a tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), are submitted and approved by the LPA. The approved documents must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  6. No trees within the site shall be felled, uprooted, wilfully damaged, or destroyed, cut back in any way or removed without the prior written consent of the Local Planning Authority. Any trees removed without such consent, or which die or become severely damaged or seriously diseased within five years from the date of first occupation of the building hereby permitted shall be replaced with trees of similar size and species and shall be planted in the immediate vicinity unless the Local Planning Authority gives its written consent to any variation. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  7. No development shall commence on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: (a) Location of construction materials, and plant storage areas used during demolition and construction; (b) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]; (c) The parking of vehicles of site operatives and visitors; (d) A scheme for controlling noise and vibration from demolition and construction activities; (e) Provision for storage, collection, and disposal of rubbish from the development during construction period; (f) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; and (g) protection of pedestrian routes. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  8. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  9. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  10. The materials to be used in the construction of the external surfaces and new boundary walls of the development hereby permitted shall match in type, colour and texture those used on the existing buildings. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  11. Prior to first occupation, details of measures to protect future occupiers of the development from noise and air pollution associated with Leigh Road shall be submitted to, agreed in writing by the Local Planning Authority and implemented. These agreed and implemented measures shall then be retained in full working order throughout the lifetime of the development. Reason: The application site falls within the Eastleigh Air Quality Management Area and is subject to significant levels of noise and air pollution.
  12. Prior to first occupation a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard and soft landscaping (including boundary treatments, and biodiversity enhancements, which as a minimum shall include the installation of nesting boxes/ bricks) and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard, and maintained thereafter. For a period of 5 years after planting, any trees of plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  13. Prior to first occupation, the vehicle parking, bin storage and secure covered cycle storage for a minimum of seven cycles per property shall be provided in accordance with the approved plans and thereafter permanently retained. Reason: To make provision for off street parking for the purpose of highway safety, encourage sustainable modes of transport and ensure adequate on-site facilities to serve the development.
  14. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nutrient impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  15. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-withbats/ive-found-a-bat-during-works
  16. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.