Council planning record

Erection of a four-bedroom bungalow with associated parking, storage, and amenity space.

82 ST JOHNS ROAD, HEDGE END, SOUTHAMPTON, SO30 4DF

Decided PermitReference: F/24/97314Eastleigh Borough Council

Last published check: 29 Sept 2026, 12:11. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
22 Apr 2024
Validated
6 Jun 2024
Determination deadline
1 Aug 2024
Local authority
Eastleigh Borough Council

Application overview

Erection of a four-bedroom bungalow with associated parking, storage, and amenity space.

Proposal details

Reference
F/24/97314
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Zoe Mitchell

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

82 ST JOHNS ROAD, HEDGE END, SOUTHAMPTON, SO30 4DF

This record has no verified map location.

Documents 44 of 44

DocumentPublishedAction
Legal Agreement ReceiptLegal Agreement Supporting Info · PDF5 Aug 2024View
F_24_97314 PL_Final DecisionDecision Notice · PDF1 Aug 2024View
F_24_97314 Delegated Officer ReportOfficer Report · PDF1 Aug 2024View
NE Response 480452Consultation Response · PDF23 Jul 2024View
Ecology response 9 7 24 for F 24 97314 82 ST JOHNS ROAD, HEDGE ENDConsultee Response · PDF9 Jul 2024View
Ecology report appendixEcological Assessment · PDF9 Jul 2024View
Southern Water MapConsultation Response · PDF28 Jun 2024View
Southern WaterConsultation Response · PDF27 Jun 2024View
Ground Floor Plan A3 1-100 - updated 26 June 2024Floor Plan · PDF26 Jun 2024View
Tree Response 97314 - 82 ST JOHNS ROAD, HEDGE ENDConsultee Response · PDF26 Jun 2024View
Site Ground Floor Plan A3 1-200 with Amendment 26 June 24Floor Plan · PDF26 Jun 2024View
HRA F-24-97314Officer Notes · PDF24 Jun 2024View
ParishConsultation Response · PDF20 Jun 2024View
Ecology response amended for F 24 97314 82 ST JOHNS ROAD, HEDGE ENDConsultee Response · PDF19 Jun 2024View
Ecology response for F 24 97314 82 ST JOHNS ROAD, HEDGE ENDConsultee Response · PDF13 Jun 2024View
Environmental HealthConsultation Response · PDF12 Jun 2024View
Application FormApplication Form · PDF16 May 2024View
REMOVED FROM APPLICATION - Air Source Heat Pump detailsSupporting Info · PDF16 May 2024View
Tree Protection PlanTree Info · PDF22 Apr 2024View
Arboricultural Assessment & Method StatementTree Info · PDF22 Apr 2024View
Manual for Managing Trees on Development SiteReport - Other · PDF22 Apr 2024View
Isometric Site Massing View A3Illustration · PDF22 Apr 2024View
Contextual Boundary Elevations A3 1-200Elevations Plan · PDF22 Apr 2024View
Bungalow Sections AA and BBSection Plan · PDF22 Apr 2024View
Tree Protection Method StatementSupporting Documents · PDF22 Apr 2024View
Existing Site SurveySurvey Plan · PDF22 Apr 2024View
West and S-East Elevations A3 1-100Elevations Plan · PDF22 Apr 2024View
Site Block Plan AnalysisBlock Plan · PDF22 Apr 2024View
DESIGN STATEMENT - CONTENTSDesign And Access Statement · PDF22 Apr 2024View
Windows 2Photos22 Apr 2024View
Location Plan 1:500Location Plan · PDF22 Apr 2024View
SUPERSEDED Ground Floor Plan A3 1-100Floor Plan · PDF22 Apr 2024View
Windows / DoorsPhotos22 Apr 2024View
SUPERSEDED Site Ground Floor Plan A3 1-200Floor Plan · PDF22 Apr 2024View
Ecological Appraisal Report_RedactedEcological Assessment · PDF22 Apr 2024View
Bin and Refuse Store Plans and Elevations A3 1-100.pdfElevations And Floor Plan · PDF22 Apr 2024View
Ecological AssessmentEcological Assessment · PDF22 Apr 2024View
DESIGN STATEMENTDesign And Access Statement · PDF22 Apr 2024View
Location Plan 1:1250Location Plan · PDF22 Apr 2024View
Site Roof PlanRoof Plan · PDF22 Apr 2024View
Contextual Massing Perspective Views A3 Rev C.pdfIllustration · PDF22 Apr 2024View
Roof - ZincPhotos22 Apr 2024View
Internal Site Perspective Views A3Illustration · PDF22 Apr 2024View
East and S-West Elevations A3 1-100Elevations Plan · PDF22 Apr 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_24_97314 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: P00, P01, P02, P03 Rev C, P05 Rev C, P06 Rev C, P07 Rev C, P08 Rev C, P09 Rev C, P10 Rev C, P11 Rev C, P12 Rev C, P13 Rev C, P14 Rev C and P15 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No development shall commence on site until a Construction Environmental Method Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: a) A programme of construction work; b) Provision of long term facilities for contractor parking and parking of vehicles of site operatives and visitors; c) Access and egress for plant and machinery; d) Location of temporary site buildings, compounds, construction material, and plant storage areas used during demolition and construction; e) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. f) The arrangements for the routing/ turning of lorries and details for construction traffic access to the site; g) A scheme for controlling noise and vibration from demolition and construction activities (to include piling); h) Provision for storage, collection, and disposal of rubbish from the development during construction period; i) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process; j) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; k) Details of any temporary lighting; l) Protection of pedestrian routes during construction; m) Dust suppression; n) Chemical and/or fuel run-off from construction into nearby watercourse(s); o) Waste disposal. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  4. Prior to the commencement of development, details of the proposed means of foul sewerage and surface water disposal shall be submitted to, and approved in writing by, the Local Planning Authority, in consultation with Southern Water. This shall be in broad accordance with the submitted plan ref P07 Rev C and demonstrate suitable infiltration rates. Reason: To ensure satisfactory provision of foul and surface water drainage.
  5. The development must accord with the arboricultural report reference 20184-AA-DC. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan reference 20184-BT1. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  6. The development shall not be occupied until a site wide landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping [including trees and boundary treatment] and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. The site wide landscaping scheme shall be completed by the end of the first planting season following occupation of the dwelling. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  7. Prior to the first occupation of the approved dwelling, supporting information to confirm the predicted internal mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality design across the site and to achieve water efficiency
  8. Prior to the first occupation of the dwelling hereby approved, evidence that the dwelling complies with Part M4(2) standard (Accessible and adaptable dwellings) of the building regulations for new build residential development (or future equivalent), shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To ensure the development meets higher national access standards in accordance with policy DM29 of the Eastleigh Borough Local Plan 2016-2036.
  9. Prior to first occupation, the vehicle parking as shown on plans referenced P07 Rev C shall be implemented and thereafter retained for the lifetime of the development. Reason: To make provision for off street parking for the purpose of highway safety.
  10. Prior to first occupation, the approved bin and cycle storage shall be completed in accordance with plan P15 and retained for the lifetime of the development. Reason: To make provision for off street parking for the purpose of highway safety.
  11. Prior to first occupation of the dwelling hereby approved, a detailed lighting plan shall be submitted to and approved in writing by the Local Planning Authority, in line with the guidance note Bats and Artificial Lighting at Night (GN08/23) https://www.bats.org.uk/news/2023/08/bats-and-artificial-lighting-at-night-ilp-guidance-note-update-released. The approved plan shall not be altered without the prior written consent from the Local Planning Authority. Reason: To ensure the protection of bats.
  12. The materials to be used must match as closely as possible, in type, colour and texture those listed in the proposed elevational drawings (P10 Rev C, P11 Rev C and P15). Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  13. The development shall be built in accordance with the approved levels as shown in drawings P12 Rev C titled ‘Bungalow Sections AA and BB’. Reason: To ensure the protection of neighbouring residential amenity.
  14. The submitted Ecological Assessment (ref 0695 Rev 01), associated appendix (ref 09 July 2024) and Ecological Appraisal Report (referenced 01/11/19 Rev 0) shall be adhered to in full, including all recommendations for biodiversity enhancement. Reason: To ensure a biodiversity enhancement in accordance with Policy DM11 from the Eastleigh Borough Local Plan (2016-2036)
  15. For a period of no less than 10 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenities of the locality.
  16. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  17. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties
  18. Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] Order 2015 [or any order revoking and re-enacting that Order with or without modification], no development permitted by Classes A, AA, B, C, D and E from Part 1 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenities of the locality and to maintain a good quality environment.
  19. Note to Applicant: - The 3-inch water distribution mains require a clearance of 6 metres on either side of the water distribution mains to protect it from construction works and to allow for future access for maintenance. - No excavation, mounding or tree planting should be carried out within 6 metres of the external edge of the public water distribution mains without consent from Southern Water. - No new soakaways, swales, ponds, watercourses or any other surface water retaining or conveying features should be located within 5 metres of a public water distribution mains. - All existing infrastructure, including protective coatings and cathodic protection, should be protected during the course of construction works.
  20. Note to Applicant: Subsequent to any planning approval that may be granted by EBC as local planning authority, a secondary permission will be required from HCC to actually undertake the works. Details of this process can be found via the following link: https://www.hants.gov.uk/transport/parking/droppedkerbs The permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways
  21. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (Dec 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.