Council planning record

Demolition of existing bungalow and construction of 2 x 4no. bed dwellings, including creation of vehicular access from Spring Lane and the construction of 2no. garages.

ST MARTINS, CHURCH ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6BH

Decided PermitReference: F/24/96839Eastleigh Borough Council

Last published check: 30 Sept 2026, 12:21. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided Permit
Application type
Full planning
Received
5 Feb 2024
Validated
6 Mar 2024
Determination deadline
3 Oct 2024
Local authority
Eastleigh Borough Council

Application overview

Demolition of existing bungalow and construction of 2 x 4no. bed dwellings, including creation of vehicular access from Spring Lane and the construction of 2no. garages.

Proposal details

Reference
F/24/96839
Alternative references
12706102
Ward
Bishopstoke Ward
Parish
Bishopstoke CP
Agent
Mr Tom French

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

ST MARTINS, CHURCH ROAD, BISHOPSTOKE, EASTLEIGH, SO50 6BH

This record has no verified map location.

Documents 58 of 58

DocumentPublishedAction
F_24_96839 PL_Final DecisionDecision Notice · PDF10 Sept 2024View
Committee ReportCommittee Report · PDF10 Sept 2024View
F_24_96839 Decision notice informative leaflet - PERMITDecision · PDF10 Sept 2024View
F_24_96839 Legal Agreement Receipt · PDF10 Sept 2024View
Ecology response amended for F 24 96839 ST MARTINS, CHURCH ROAD, BISHOPSTOKEConsultee Response · PDF16 Apr 2024View
St Martins Close - Design & Access Statement_RevDDesign And Access Statement · PDF11 Apr 2024View
208-H.02 PROPOSED FIRST FLOOR-DPlan · PDF11 Apr 2024View
207-H.02 PROPOSED GROUND FLOOR-PLAN-EPlan · PDF11 Apr 2024View
214-H.02 PROPOSED ELEVATIONS-DPlan · PDF11 Apr 2024View
202-PROPOSED SITE GROUND FLOOR-PLAN-EPlan · PDF11 Apr 2024View
210-PROPOSED SITE ELEVATIONS-DPlan · PDF11 Apr 2024View
206-H.01 PROPOSED ROOF PLAN-DPlan · PDF11 Apr 2024View
213-H.02 PROPOSED ELEVATIONS-CPlan · PDF11 Apr 2024View
230-PROPOSED ACCESS DRIVE-GPlan · PDF11 Apr 2024View
212-H.01 PROPOSED ELEVATIONS-DPlan · PDF11 Apr 2024View
205-H.01 PROPOSED FIRST FLOOR-PLAN-DPlan · PDF11 Apr 2024View
209-H.02 PROPOSED ROOF PLAN-DPlan · PDF11 Apr 2024View
204-H.01 PROPOSED GROUND FLOOR-PLAN-DPlan · PDF11 Apr 2024View
211-H.01 PROPOSED ELEVATIONS-DPlan · PDF11 Apr 2024View
201-PROPOSED SITE PLAN-EPlan · PDF11 Apr 2024View
F2496839_Church Road_240405Consultee Response5 Apr 2024View
Southern Water ResponseConsultation Response · PDF27 Mar 2024View
Ecology response F 24 96839 ST MARTINS, CHURCH ROAD, BISHOPSTOKEConsultee Response · PDF25 Mar 2024View
Existing ElevationsElevations Plan · PDF6 Mar 2024View
Existing ElevationsElevations Plan · PDF6 Mar 2024View
H.02 PROPOSED GARAGEElevations And Floor Plan · PDF1 Mar 2024View
Existing Ground Floor PlanFloor Plan · PDF1 Mar 2024View
H.01 PROPOSED GARAGEElevations And Floor Plan · PDF1 Mar 2024View
Existing Site ElevationsElevations Plan · PDF1 Mar 2024View
Arboricultural Method StatementTree Info · PDF5 Feb 2024View
Proposed First Floor Plan - House 01Floor Plan · PDF5 Feb 2024View
Application FormApplication Form · PDF5 Feb 2024View
Site Location PlanLocation Plan · PDF5 Feb 2024View
Proposed Vehicular Access - Technical NoteTransport Assessment · PDF5 Feb 2024View
Proposed Site PlanSite Layout Plan · PDF5 Feb 2024View
Proposed Site Ground Floor PlanFloor Plan · PDF5 Feb 2024View
Proposed Roof Plan - House 01Roof Plan · PDF5 Feb 2024View
Proposed Ground Floor Plan - House 01Floor Plan · PDF5 Feb 2024View
Proposed Elevations - House 01Elevations Plan · PDF5 Feb 2024View
Proposed Ground Floor Plan - House 02Floor Plan · PDF5 Feb 2024View
Design and Access StatementDesign And Access Statement · PDF5 Feb 2024View
Proposed Site ElevationsElevations Plan · PDF5 Feb 2024View
Existing Site PlanSite Layout Plan · PDF5 Feb 2024View
Flood Risk and Drainage Assessment Report October 23.pdfFlood Risk Assessment · PDF5 Feb 2024View
Proposed Elevations - House 02Elevations Plan · PDF5 Feb 2024View
Arboricultural Impact AssessmentTree Info · PDF5 Feb 2024View
Proposed Access DriveSite Layout Plan · PDF5 Feb 2024View
Tree Protection PlanTree Info · PDF5 Feb 2024View
Proposed Site Block PlanBlock Plan · PDF5 Feb 2024View
Nutrient Neutrality Statement and Calculations.pdfOther · PDF5 Feb 2024View
Proposed First Floor Plan - House 02Floor Plan · PDF5 Feb 2024View
St Martins Close Ecological Assessment Report October 2023_RedactedEcological Assessment · PDF5 Feb 2024View
Proposed Elevations - House 02Elevations Plan · PDF5 Feb 2024View
Existing Site Block PlanBlock Plan · PDF5 Feb 2024View
Design and Access StatementDesign And Access Statement · PDF5 Feb 2024View
Proposed Roof Plan - House 02Roof Plan · PDF5 Feb 2024View
Arbicultural Impact AssessmentTree Info · PDF5 Feb 2024View
Proposed Elevations - House 01Elevations Plan · PDF5 Feb 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Permit
F_24_96839 PL_Final Decision F_24_96839 Decision notice informative leaflet - PERMIT
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following documents and plans numbered: Site Location Plan 2022-009 010Existing Site Block Plan 2022-009 011Existing Site Plan 2022-009 100Existing Ground Floor Plan 2022-009 102 Rev AExisting Site Elevations 2022-009 110 Rev BExisting Elevations 2022-009 111 Rev B Existing Elevations 2022-009 112 Rev BProposed Site Block Plan 2022-009 200 Rev AProposed Site Plan 2022-009 201 Rev EProposed Site Ground Floor Plan 2022-009 202 Rev EH.01 Proposed Elevations 2022-009 211 Rev DH.01 Proposed Elevations 2022-009 212 Rev DH.01 Proposed Ground Floor Plan 2022 204 Rev DH.01 Proposed First Floor Plan 2022-009 205 Rev DH.01 Proposed Roof Plan 2022-009 206 Rev DH.01 Proposed Garage 2022-009 240H.02 Proposed Ground Floor Plan 2022-009 207 Rev EH.02 Proposed First Floor Plan 2022-009 208 Rev DH.02 Proposed Roof Plan 2022-009 209 Rev DProposed Site Elevations 2022-009 210 Rev DH.02 Proposed Elevations 2022-009 213 Rev CH.02 Proposed Elevations 2022-009 214 Rev DH.02 Proposed Garage 2022-009 241 Proposed Access Drive 2022-009 230 Rev GTree Protection Plan SM-TPP-001 Rev AArboricultural Impact Assessment St. Martins Close, Bishopstoke, Eastleigh, SO50 6BHArb. Impact Assessment SM-AIA-001 Rev AArboricultural Method Statement St. Martins Close, Bishopstoke, Eastleigh, SO50 6BHProposed Residential Development at St Martin’s Close Bishopstoke Flood Risk Assessment and Drainage Proposals Report (dated 9 October 2023)Spring Lane, Bishopstoke, Nr.Eastleigh Hampshire, SO50 6AZ: Proposed Vehicular Access Technical Note (dated November 2023)St Martins Close, Bishopstoke, Hampshire Ecological Appraisal (dated October 2023)St Martin’s Close Bishopstoke, SO50 6BH Design & Access Statement Rev D (dated April 2024)Nutrient Neutrality Statement and Calculations PCD547/002 Rev.B Reason: For the avoidance of doubt and in the interests of proper planning.
  3. No development shall commence on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: A programme of and phasing of demolition and construction work;Provision of long term facilities for contractor parking and parking of vehicles of site operatives and visitors;Access and egress for plant and machinery;Location of temporary site buildings, compounds, construction material, and plant storage areas used during demolition and construction;The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges];The arrangements for the turning of lorries and details for construction traffic access to the site;A scheme for controlling noise and vibration from demolition and construction activities (to include piling);Provision for storage, collection, and disposal of rubbish from the development during the construction period;Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process;The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;Details of any temporary lighting;Protection of pedestrian routes during construction;Temporary surface water drainage provisions;Precautionary working method statement (providing full details of those outlined in the ‘Response to Ecology Officer and NatureSpace Comments received 11 April 2024)Measures to protect listed walls along access from Church Road. Reason: In order that the planning Authority can properly assess the works effects on the amenity of the locality.
  4. Demolition and construction work shall only take place in accordance with the approved management plan. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  5. No development shall commence until details for the sustainable disposal of surface water and the disposal of foul sewerage from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority, and in consultation with Southern Water. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
  6. Notwithstanding the information submitted to date, no development related works shall take place on site until a detailed arboricultural method statement relating to the creation of the new access on to Spring Lane is submitted to and approved in writing by the Local Planning Authority. The approved method statement must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  7. No development related works shall take place on site until a detailed arboricultural supervision proposal, detailing all proposed supervision activity and method of reporting, has been submitted and approved by the Local Planning Authority. The approved arboricultural supervision proposal must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  8. No development shall start on site until the access onto Spring Lane, including the footway and/ or verge crossing shall be constructed and lines of sight of 2.4m by 43m provided in accordance with the approved plans (PCD547/002 Rev.B). The lines of sight splays shown on the approved plans shall be kept free of any obstruction exceeding 0.6m in height above the adjacent carriageway and shall be subsequently maintained so thereafter. Reason: To provide satisfactory access and in the interests of highway safety.
  9. No development shall commence until a wall protection plan has been submitted to and approved in writing by the Local Planning Authority and protection measures installed on the site. The approved protection measures shall be implemented for the duration of the demolition and building works. Reason: To preserve the character of the conservation area.
  10. Notwithstanding the approved plans/ details, no development above damp-proof-course level shall continue until full details of the following have been submitted to and approved in writing by the Local Planning Authority: materials (and samples where requested) to be used in the construction of the external surfaces of the development;Construction details of the junctions between different facing materials;Parapet details;Window reveals; andRainwater goods. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  11. Prior to construction/ repair works to the existing boundary wall the following details shall be submitted to and approved in writing by the Local Planning Authority: Brick details; colour/ make; andMortar details; colour/ material. The development shall then be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  12. Details of the solar panels shall be submitted to and approved in writing by the Local Planning Authority prior to their installation. The works shall then be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  13. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  14. No construction, demolition, or deliveries to the site shall take place except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  15. The development must accord with the approved arboricultural impact assessment and arboricultural method statement. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan reference SM-TPP-001. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the works and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  16. A watching brief should be followed at all times during demolition and construction works and confirmation of this shall be submitted to the Local Planning Authority prior to completion. In the event that previously unidentified contamination is found during the watching brief it must be immediately reported to the Local Planning Authority. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, has been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required by the Local Planning Authority, the development shall not be brought into use until a verification report for the remediation work has been submitted to and approved in writing by the Local Planning Authority. All works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
  17. Prior to first occupation a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard and soft landscaping (including all boundary treatments, additional tree planting and biodiversity enhancements) and shall provide details of timings for all landscaping and any future maintenance. The approved landscaping scheme shall be carried out in the first planting season following occupation of the development, or completion of the development (whichever is sooner), and to the appropriate British Standard, and maintained thereafter. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  18. Prior to first occupation, the vehicle parking, bin and cycle storage as shown on plan referenced “Proposed Site Plan 2022-009 201 Rev E”” shall be implemented and thereafter retained for the lifetime of the development. Reason: To make provision for off street parking for the purpose of highway safety.
  19. Prior to the first occupation of the approved development, supporting information to confirm the predicted internal mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To achieve water efficiency requirements in the interest of environmental sustainability, in accordance with Policy DM2 of the Eastleigh Borough Local Plan 2016-2036.
  20. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  21. The development shall not be occupied until details of the southern boundary treatment have been submitted to and approved in writing by the Local Planning Authority. The details shall include the design, height and materials of a new boundary wall to replace the existing fencing. The approved boundary treatment shall be fully installed prior to the first occupation of either dwelling hereby permitted. Reason: To preserve and enhance the character of the conservation area and to protect residential amenity.
  22. Prior to the occupation of any dwelling hereby approved, evidence that the dwelling complies with Part M4(2) standard (Accessible and adaptable dwellings) of the building regulations for new build residential development (or future equivalent), shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To ensure the development meets higher national access standards in accordance with policy DM29 of the Eastleigh Borough Local Plan 2016-2036.
  23. Any vehicular access gates provided shall be set back a distance of 6m from the edge of the carriageway of the adjoining highway. Reason: In the interests of highway safety.
  24. The garages hereby approved shall only be used for the purpose of parking private motor vehicles in connection with the residential use of the property and shall not, at any time, be used for living accommodation, business, commercial or industrial purposes. Reason: To ensure the adequate provision of onsite parking for the purpose of highway safety.
  25. The green roofs on the development hereby permitted shall not be used as a balcony or similar outdoor amenity area and access shall be for maintenance purposes only. Reason: to protect residential amenity.
  26. Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] Order 2015 [or any order revoking and re-enacting that Order with or without modification], no development permitted by Classes A, AA, B & E of Part 2 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To preserve the character of the conservation area.
  27. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  28. INFORMATIVES Note to Applicant a) In the event that a bat is found, works should stop immediately and Natural England informed: https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works Note to Applicant b) A licence is required from Natural England for any work that may disturb badgers or damage/ block access to a badger sett. Note to Applicant c) Please review Southern Water’s Comments in detail online and contact: SouthernWaterPlanning@southernwater.co.uk when and/or where necessary. Note to Applicant d) The site is within an area of maximum radon potential of 3-5%. Further consideration needs to be given to the radon risk. As general advice, all developers should: Consult the Radon UK map (UKradon - UK maps of radon) - if they're in an area above 1%, developers should buy the UK Health Agency Radon report (for approximately £4.00) and check their development. Details on the findings on radon risk should be submitted to the LPA. If this gives an answer that is greater than 1%, they should consider Radon protection for new developments. If the answer is greater than 3% then Radon protection will be needed according to Building Regulations, with basic protection required at 3-10% and full protection above 10%. Note to Applicant e) In accordance with Paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.