The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be implemented in accordance with the following plans numbered: • Location Plan 659027 001 • Block Plan 659027 002 • Proposed Site Plan 659027 003 • Proposed Container Elevations 659027 004 Rev A • Preliminary Ecological Appraisal (Ecosupport, May 2024) • Shadow Habitats Regulations Assessment (sHRA) (Ecosupport, May 2024) • 240322 Hamble Paddle – FRA Letter (dated 22 March 2024) Reason: For the avoidance of doubt and in the interests of proper planning.
No development shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: a) The arrangements for deliveries associated with all construction works b) Access and egress for plant and machinery c) Location of temporary site buildings, compounds, construction material, and plant storage areas d) Details of land activities e) Details of construction methods f) Details of the timings of works g) Details of noise mitigation measures h) Protection measures to prevent contamination of the adjacent River Hamble (through silt/ rubbish/ debris etc) The work shall only be undertaken in accordance with the approved details. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those set out within the application form, unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.