Change of use and subdivision of building to create 2no. commercial units (Class E) on ground floor and 2no. one bed flats on first floor with bin and cycle storage and external alterations.
FORMER, 33-34 VICTORIA ROAD, NETLEY ABBEY
Decided PermitReference: F/24/96741Eastleigh Borough Council
Last published check: 1 Oct 2026, 01:46. Check the council record for more recent changes.
Application timeline
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Change of use and subdivision of building to create 2no. commercial units (Class E) on ground floor and 2no. one bed flats on first floor with bin and cycle storage and external alterations.
Proposal details
Reference
F/24/96741
Alternative references
12743378
Ward
Hamble & Netley Ward
Parish
Hound CP
Agent
Kode Architecture (Mr Rob Wiles)
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be implemented in accordance with the following plans referenced: KA/2024/J04 A100, KA/2024/J04 A101, KA/2024/J04 A102, KA/2024/J04 A103, KA/2024/J04 A200 & KA/2024/J04 A201, Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
No development shall commence until a noise assessment has been submitted to and approved in writing by the Local Planning Authority. The noise assessment shall include external noise levels (reflected and re-radiated noise) and mitigation (including sound insulation of the building envelope, orientation of habitable rooms away from major noise sources and details of acoustically attenuated mechanical ventilation to achieve internal room standards in accordance with the criteria of BS8233:2014). Reason: To protect future residents from commercial noise.
No dwelling shall be occupied until a post installation noise assessment (to confirm compliance with the sound criteria and outline any additional steps to mitigate noise) has been submitted to and approved in writing by the Local Planning Authority and all approved mitigation measures fully installed and thereafter permanently retained. Reason: To protect future residents from commercial noise.
No dwelling shall be occupied until evidence showing that mitigation is in place to offset the impact of increased nitrates from the development on the Solent and Southampton Water SPA/ Ramsar site has been submitted to and approved in writing by the Local Planning Authority. A vesting certificate is acceptable evidence for the Eastleigh Borough Council nitrate mitigation schemes. Reason: To accord with the Conservation of Habitats and Species Regulations 2017 (as amended).
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existings. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
The development hereby permitted shall not be occupied until the bin/ cycle store and external areas have been provided in accordance with the approved plans and thereafter retained. Reason: To make provisions for the new dwellings.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.