Council planning record

Construction of an internal distributor road and associated footways, cycleways, lighting, landscaping and SuDS basins, and diversion of Public Rights of Way footpaths FOHHF 701 and 702 as part of the One Horton Heath development (proposal constitutes EIA development)

Land between Burnetts Lane and Fir Tree Lane, Eastleigh

Decided PermitReference: F/23/96631Eastleigh Borough Council

Application location

Land between Burnetts Lane and Fir Tree Lane, Eastleigh

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
22 Dec 2023
Validated
3 Jan 2024
Determination deadline
30 Apr 2026
Local authority
Eastleigh Borough Council

Application overview

Construction of an internal distributor road and associated footways, cycleways, lighting, landscaping and SuDS basins, and diversion of Public Rights of Way footpaths FOHHF 701 and 702 as part of the One Horton Heath development (proposal constitutes EIA development)

Proposal details

Reference
F/23/96631
Alternative references
12676680
Ward
West End North Ward;Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Mr Oliver Woolf

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 387 of 387

DocumentPublishedAction
Committee ReportOfficer Report · PDF1 May 2026View
Committee Update Paper HHDMC 23 April 2026 · PDF1 May 2026View
Decision NoticeDecision Notice · PDF29 Apr 2026View
HRA Appropriate Assessment Distributor Road Updated April 2026 report reference updates only · PDF9 Apr 2026View
SID Foxwood Road Main Plans List and Additional Plans List 26 March 2026 · PDF27 Mar 2026View
Lead Local Flood Authority (LLFA) further comments Feb 2026_RedactedConsultation Response · PDF20 Feb 2026View
Fair Oak and Horton Heath Parish Council removal of objectionConsultation Response · PDF20 Feb 2026View
Highway Authority comments Feb 26Consultation Response · PDF20 Feb 2026View
Fair Oak and Horton Heath Parish Council further commentsConsultation Response · PDF22 Jan 2026View
AMENDED Proposed External Works P03 · PDF15 Jan 2026View
Southern Water consultation response Dec 25Consultation Response · PDF31 Dec 2025View
Southern Water Gis Map printConsultation Response · PDF31 Dec 2025View
AMENDED EXCEEDANCE FLOW DRAWING PRE DEVEVELOPMENT · PDF16 Dec 2025View
AMENDED OVERALL TRACKING SHEET 1 · PDF16 Dec 2025View
AMENDED OVERALL TRACKING SHEET 3 · PDF16 Dec 2025View
DETAILED SuDS SECTIONS POND F · PDF16 Dec 2025View
AMENDED Proposed RC07 Crossing Routes Section and plan · PDF16 Dec 2025View
AMENDED DETAILED SuDS SECTIONS SWALE · PDF16 Dec 2025View
AMENDED OVERALL TRACKING SHEET 4 · PDF16 Dec 2025View
Applicant Technical Response to Highway Authority queries · PDF16 Dec 2025View
DETAILED SuDS SECTIONS POND G · PDF16 Dec 2025View
AMENDED RC05 Crossing Routes Section and plan · PDF16 Dec 2025View
AMENDED OVERALL TRACKING SHEET 2 · PDF16 Dec 2025View
AMENDED EXCEEDANCE FLOW DRAWING POST DEVELOPMENT · PDF16 Dec 2025View
AMENDED Crossing Routes Section and plan RC06 · PDF16 Dec 2025View
AMENDED Overall Site Plan · PDF16 Dec 2025View
Tree Constraints Plan Sheet 7 11705_P01 · PDF3 Dec 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 3 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 11 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 8 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 2 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 2 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 3 · PDF28 Nov 2025View
AMENDED PROPOSED DRAINAGE DETAILS SHEET 2 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 3 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 7 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 8 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY 5 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 6 · PDF28 Nov 2025View
AMENDED EXTERNAL WORKS CONSTRUCTION DETAILS 2 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 1 · PDF28 Nov 2025View
AMENDED PROPOSED FOXWOOD ROAD LONGSECTION 4 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 3 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 10 · PDF28 Nov 2025View
AMENDED PROPOSED DRAINAGE LAYOUT SHEET 4 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 5 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 10 · PDF28 Nov 2025View
AMENDED PROPOSED GULLY CATCHMENT PLAN 2 · PDF28 Nov 2025View
AMENDED TYPICAL SERVICES LAYOUT ADOPTING NJUG · PDF28 Nov 2025View
AMENDED PROPOSED ROAD GEOMETRY LAYOUT 3 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 2 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 11 · PDF28 Nov 2025View
PROPOSED LEVELS LAYOUT SHEET 9 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 11 · PDF28 Nov 2025View
AMENDED PROPOSED EXTERNAL WORKS DETAILS 1 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 11 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 2 · PDF28 Nov 2025View
AMENDED PROPOSED ROAD GEOMETRY LAYOUT 4 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 6 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 9 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 7 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 5 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 12 · PDF28 Nov 2025View
AMENDED PROPOSED GULLY CATCHMENT PLAN 1 · PDF28 Nov 2025View
AMENDED PROPOSED EXTERNAL WORKS DETAILS 2 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 5 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 10 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 8 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 1 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 7 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 2 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 4 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 7 · PDF28 Nov 2025View
AMENDED PROPOSED DRAINAGE DETAILS SHEET 1 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 12 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 4 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 6 · PDF28 Nov 2025View
AMENDED SID Road Overall site plan - Sheet 1 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 12 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 4 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 11 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 2 · PDF28 Nov 2025View
AMENDED PROPOSED DRAINAGE LAYOUT SHEET 3 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 10 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 5 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 7 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 4 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 10 · PDF28 Nov 2025View
AMENDED PROPOSED DRAINAGE LAYOUT SHEET 1 · PDF28 Nov 2025View
AMENDED PROPOSED DRAINAGE DETAILS SHEET 3 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 3 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 1 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 8 · PDF28 Nov 2025View
AMENDED PROPOSED GULLY CATCHMENT PLAN 3 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 8 · PDF28 Nov 2025View
AMENDED SID Road Overall site plan - Sheet 2 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 10 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 12 · PDF28 Nov 2025View
AMENDED EXTERNAL WORKS CONSTRUCTION DETAILS 1 · PDF28 Nov 2025View
AMENDED PROPOSED ROAD GEOMETRY LAYOUT 2 · PDF28 Nov 2025View
AMENDED PROPOSED FOXWOOD ROAD LONGSECTION 1 · PDF28 Nov 2025View
AMENDED PROPOSED GULLY CATCHMENT PLAN 4 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 10 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 7 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 1 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 8 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 3 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 2 · PDF28 Nov 2025View
AMENDED PROPOSED DRAINAGE LAYOUT SHEET 2 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 6 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 9 · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 12 · PDF28 Nov 2025View
AMENDED OVERALL SuDS LOCATIONS DRAINAGE LAYOUT · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 6 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 4 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 6 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 9 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 7 · PDF28 Nov 2025View
AMENDED PROPOSED ROAD GEOMETRY LAYOUT 1 · PDF28 Nov 2025View
AMENDED PROPOSED KERBING & SURFACING 9 · PDF28 Nov 2025View
AMENDED SID Road - Overall site plan Sheet 4 · PDF28 Nov 2025View
AMENDED PROPOSED FOXWOOD ROAD LONGSECTION 2 · PDF28 Nov 2025View
AMENDED OVERALL SuDS LOCATIONS DRAINAGE LAYOUT · PDF28 Nov 2025View
AMENDED PROPOSED COMBINED SERVICES LAYOUT 8 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 4 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 1 · PDF28 Nov 2025View
AMENDED PROPOSED FOXWOOD ROAD LONGSECTION 3 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY 9 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 12 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 11 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 3 · PDF28 Nov 2025View
AMENDED SIGNING AND LINING FOXWOOD ROAD 9 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING REFUSE VEHICLE 5 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 6 · PDF28 Nov 2025View
AMENDED VEHICLE TRACKING STANDARD RIGID BUS 1 · PDF28 Nov 2025View
AMENDED SID Road -Overall site plan Sheet 3 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 1 · PDF28 Nov 2025View
AMENDED CYCLIST_PEDESTRIAN VISIBILITY S 4 · PDF28 Nov 2025View
AMENDED PROPOSED LEVELS LAYOUT SHEET 5 · PDF28 Nov 2025View
Outline app plan AMENDED On-Site PROW Works - North (5) · PDF26 Nov 2025View
Outline app plan AMENDED On-Site PROW Works - South · PDF26 Nov 2025View
LLFA (HCC Flood and Water Team) further response_RedactedConsultation Response · PDF17 Apr 2025View
MAXIMUM INFLOW RATES FROM PARCEL CATCHMENT 2Drainage Plan · PDF18 Feb 2025View
Applicant response to LLFA Technical Note 004 · PDF18 Feb 2025View
MAXIMUM INFLOW RATES FROM PARCEL CATCHMENT 1Drainage Plan · PDF18 Feb 2025View
SuDS Strategy Spine Road redactedDrainage Plan · PDF18 Feb 2025View
Active Travel England commentsConsultation Response · PDF14 Feb 2025View
HCC Countryside Service commentsConsultation Response · PDF14 Feb 2025View
Hampshire and IOW Fire and Rescue Service comments_RedactedConsultation Response · PDF4 Feb 2025View
Highway Authority further comments 30 Jan 25Consultation Response · PDF30 Jan 2025View
Eastleigh Ramblers comments Jan 25Consultation Response · PDF14 Jan 2025View
AMENDED Road Safety Audit - Foxwood Road_RedactedSupporting Documents · PDF31 Dec 2024View
Technical Note PV2 Assessment - Campbell ReithSupporting Documents · PDF31 Dec 2024View
AMENDED Movement StrategySupporting Documents · PDF31 Dec 2024View
TYPICAL SERVICES LAYOUT ADOPTIONPlan · PDF31 Dec 2024View
Foxwood Road Submission Documents List 30.12.24Supporting Documents · PDF31 Dec 2024View
Southern WaterConsultation Response · PDF2 Oct 2024View
Fair Oak and Horton Heath Parish CouncilParish Response19 Sept 2024View
EMMS Appendix I OHH Barn owl Method StatementSupporting Documents · PDF18 Sept 2024View
EMMS Appendix D Quobleigh GCN licence Final development layout map A3Supporting Info · PDF18 Sept 2024View
EMMS Appendix H Reptile Method StatementSupporting Documents · PDF18 Sept 2024View
EMMS Appendix G 2020 reptile results A3Supporting Documents · PDF18 Sept 2024View
EMMS Appendix B OPA Ecological Areas Access Plan A3 (3)Supporting Documents · PDF18 Sept 2024View
EMMS Appendix E CEMP ChalcroftSupporting Documents · PDF18 Sept 2024View
EMMS Appendix A Ecological Constraints Plan North A3 (1)Supporting Documents · PDF18 Sept 2024View
EMMS Appendix A Ecological Constraints Plan South A3 (1)Supporting Documents · PDF18 Sept 2024View
EMMS Appendix G 2018 reptile results A3Supporting Documents · PDF18 Sept 2024View
EMMS Appendix C ES Mitigation tableSupporting Documents · PDF18 Sept 2024View
EMMS v2Supporting Documents · PDF18 Sept 2024View
EMMS Appendix F Trees with bat potentialSupporting Documents · PDF18 Sept 2024View
Hedge End Town CouncilConsultee Response5 Sept 2024View
Natural England re HRA AAConsultee Response · PDF4 Sept 2024View
HCC HighwaysConsultee Response · PDF3 Sept 2024View
Pollution teamConsultee Response20 Aug 2024View
Eastleigh RamblersConsultee Response · PDF18 Aug 2024View
HCC ArchaeologistConsultation Response · PDF15 Aug 2024View
Design officer re Amended drawingsConsultee Response7 Aug 2024View
ESA3 Appendix 12.1 AddendumEnvironmental Assessment · PDF29 Jul 2024View
AMENDED Illustrative Plan Extract 3Plan · PDF29 Jul 2024View
AMENDED Illustrative PlanPlan · PDF29 Jul 2024View
AMENDED Internal Distributor Road Layout Extract 5Plan · PDF29 Jul 2024View
AMENDED Scheme Features PlanPlan · PDF29 Jul 2024View
AMENDED Illustrative Plan Extract 4Plan · PDF29 Jul 2024View
Environmental Statement Addendum 3: Chapter 8 Traffic and TransportEnvironmental Assessment · PDF29 Jul 2024View
AMENDED-LLFA Responses TNSupporting Documents · PDF29 Jul 2024View
AMENDED Internal Distributor Road Layout PlanPlan · PDF29 Jul 2024View
AMENDED Illustrative Plan Extract 1Plan · PDF29 Jul 2024View
AMENDED llustrative Plan Extract 2Plan · PDF29 Jul 2024View
AMENDED Internal Distributor Road Layout Extract 2Plan · PDF29 Jul 2024View
Environmental Statement Addendum ESA3 Chapter 13 Landscape and VisualEnvironmental Assessment · PDF29 Jul 2024View
Written Schem of Investigation for Archaeological Monitoring - Jul24Supporting Documents · PDF29 Jul 2024View
AMENDED Illustrative Plan Extract 5Plan · PDF29 Jul 2024View
Environmental Statement Addendum 3 ESA3 Chapter 7 Air QualityEnvironmental Assessment · PDF29 Jul 2024View
Environmental Statement Addendum 3 ESA3 Chapter 7 Air Quality - AppendicesEnvironmental Assessment · PDF29 Jul 2024View
Environmental Statement Addendum 3 ESA3 Chapter 11 HydrologyEnvironmental Assessment · PDF29 Jul 2024View
AMENDED Internal Distributor Road Layout Extract 4Plan · PDF29 Jul 2024View
Environmental Statement Addendum 3 ESA3 Chapter 10 EcologyEnvironmental Assessment · PDF29 Jul 2024View
AMENDED Internal Distributor Road Layout Extract 1Plan · PDF29 Jul 2024View
Environmental Statement Addendum ESA3 Chapter 6 Socio EconomicsEnvironmental Assessment · PDF29 Jul 2024View
One Horton Heath ES Addendum 3 (ESA3) - July 2024Environmental Assessment · PDF29 Jul 2024View
Phasing PlanPlan · PDF29 Jul 2024View
AMENDED Internal Distributor Road Layout Extract 3Plan · PDF29 Jul 2024View
J00947d - Invasive Non-native Plant Species Walkover - Survey Results Report - FinalSupporting Documents · PDF26 Jun 2024View
LLFA /HCC Flood and Water Team Response - F-23-96631Consultee Response · PDF10 Jun 2024View
F 23 96631 AA FinalSupporting Info · PDF4 Jun 2024View
Southern WaterConsultation Response · PDF20 May 2024View
Southern Water GISConsultee Response · PDF20 May 2024View
F_23_96631 Urban Design CommentsConsultee Response14 May 2024View
Response to LLFA and Southern Water CommentsSupporting Documents · PDF29 Apr 2024View
SUPERSEDED Technical Note - Response to LLFA & Southern Water CommentSupporting Documents · PDF29 Apr 2024View
Sustainable Transport OfficerConsultee Response29 Apr 2024View
Pollution Team - noiseConsultee Response17 Apr 2024View
HCC Childrens ServicesConsultee Response26 Mar 2024View
Ecology responseConsultee Response · PDF22 Mar 2024View
Ecology RE_ NatureSpace Comment F_23_96631_ Construction of an internal distributor road and associated footways_ cycleways_ lighting_ lConsultee Response13 Mar 2024View
NatureSpace CommentConsultee Response11 Mar 2024View
Planning PolicyConsultee Response8 Mar 2024View
Environment AgencyConsultee Response7 Mar 2024View
OHH - SID IDR CEMP 26.03.24 with site specific appendicesSupporting Documents · PDF27 Feb 2024View
ES Appendix 5.4 - OPA Phase 1 Sustainability and Energy StatementEnvironmental Assessment · PDF23 Feb 2024View
Hampshire Highways ResponseConsultation Response · PDF7 Feb 2024View
LLFA Response - F-23-96631Consultee Response · PDF26 Jan 2024View
Fair Oak and Horton Heath PCParish Response24 Jan 2024View
Tree OfficerConsultee Response24 Jan 2024View
Southampton Airport responseConsultee Response23 Jan 2024View
Southern Water GISConsultee Response · PDF23 Jan 2024View
southern water consultationConsultation Response · PDF23 Jan 2024View
Planning Casework Unit Department of Levelling Up ResponseConsultee Response22 Jan 2024View
BUS TRACKING SHEET 1Supporting Documents · PDF18 Jan 2024View
Road Safety Audit Technical NoteSupporting Documents · PDF18 Jan 2024View
Drainage Strategy Sheet 4Drainage Report · PDF18 Jan 2024View
Drainage Strategy sheet 3Drainage Report · PDF18 Jan 2024View
BUS TRACKING SHEET 2Supporting Documents · PDF18 Jan 2024View
Drainage Strategy Sheet 1Drainage Report · PDF18 Jan 2024View
BUS TRACKING SHEET 4Supporting Documents · PDF18 Jan 2024View
BUS TRACKING SHEET 3Supporting Documents · PDF18 Jan 2024View
Drainage Strategy Sheet 2Drainage Report · PDF18 Jan 2024View
Eastleigh RamblersConsultee Response · PDF9 Jan 2024View
GreenSpaces/Direct ServicesConsultee Response9 Jan 2024View
HCC ArchaeologistConsultation Response9 Jan 2024View
One Horton Heath ES Addendum - NTSEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 3 The Environmental Statement Proposed DevelopmentEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 4 Consultation and AlternativesEnvironmental Assessment · PDF3 Jan 2024View
ES Great Crested Newts AssessmentEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.3 Watercourses and Fish HabitatEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix10.6 Otter and VoleEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.7 Habitat ReportEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.10 - ReptilesEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.8 BirdsEnvironmental Assessment · PDF3 Jan 2024View
One Horton Heath - ES Addendum · PDF3 Jan 2024View
ES Appendix 10.2 - Phase 1 HabitatsEnvironmental Assessment · PDF3 Jan 2024View
ES Environmental Statement Volume 1 Main StatementEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 11.1 - OPA FRA-Issue 1-Part 2 of 6 (Appendices 1-3)Environmental Assessment · PDF3 Jan 2024View
ES Chapter 12 Noise and Vibration AddendumEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.14 Information to Support Appropriate Assessment-6-2-2 · PDF3 Jan 2024View
ES Appendix 11.1 - OPA FRA-Issue 1-Part 1 of 6 (Report)Environmental Assessment · PDF3 Jan 2024View
ES Appendix 12.1 - Consultation with ChalcroftEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.13 - Habitat ChangeEnvironmental Assessment · PDF3 Jan 2024View
ESA Appendix 9 - Appendix B Sports Pitch Noise AssessmentEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 11.1 - OPA FRA-Issue 1-Part 3 of 6 (Appendix 4)Environmental Assessment · PDF3 Jan 2024View
ES Appendix 11.1 - OPA FRA-Issue 1-Part 4 of 6 (Appendix 5)Environmental Assessment · PDF3 Jan 2024View
ES Appendix 10.11 - Ecological Lighting BaselineEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 11.1 - OPA FRA-Issue 1-Part 5 of 6 (Appendix 6)Environmental Assessment · PDF3 Jan 2024View
ES Appendix 11.1 - OPA FRA-Issue 1-Part 6 of 6 (Appendices 7-14)Environmental Assessment · PDF3 Jan 2024View
ES Appendix 12.3 - Existing Sensitive ReceptorsEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 12.7 - ESR Results 2030Environmental Assessment · PDF3 Jan 2024View
ES Appendix 10.12 - Landscape and Ecological Mitigation MasterplanEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 13 Landscape and VisualEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 3.1 - Access Parameter PlanEnvironmental Assessment · PDF3 Jan 2024View
ES Environmental Statement Non Technical Summary AddendumEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 1.3 - Indicative Phasing PlanEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 7.4 - construction mitigationEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.4 - Bat Report Technical NoteEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix7.1 - Traffic FlowsEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix7.2 -Model Impacts and VerificationEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.1 - Desk StudyEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 7.3 Southampton WindroseEnvironmental Assessment · PDF3 Jan 2024View
ESA Appendix 9 - Appendix B Sports Pitch Noise Assessment · PDF3 Jan 2024View
ES Flood Risk Assessment Part 2 of 5Environmental Assessment · PDF3 Jan 2024View
ES Chapter 10 Ecology StatementEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 5 EIA ApproachEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 2 Site DescriptionEnvironmental Assessment · PDF3 Jan 2024View
ES Biodiversity Net Gain AssessmentEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 10.14 Information to Support Appropriate Assessment-V2 · PDF3 Jan 2024View
ES Figure 1.1 - Wider OPA Red Line PlanEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 8 Transport and Access StatementEnvironmental Assessment · PDF3 Jan 2024View
ESA Chapter 9 Built HeritageEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 6 Socio EconomicsEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 7 Air Quality AssessmentEnvironmental Assessment · PDF3 Jan 2024View
ES - Chapter 1 IntroductionEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 13.4 - Winter PhotoviewpointsEnvironmental Assessment · PDF3 Jan 2024View
ES Flood Risk Assessment Part 3 of 5Environmental Assessment · PDF3 Jan 2024View
ES Flood risk assessementEnvironmental Assessment · PDF3 Jan 2024View
ES Flood Risk Assessment Part 4 of 5Environmental Assessment · PDF3 Jan 2024View
ES Flood Risk Assessment Part 5 of 5Environmental Assessment · PDF3 Jan 2024View
ES Addendum Hydrology · PDF3 Jan 2024View
ES Consideration of Climate Change NoteEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 11 HydrologyEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 4.1: Pre-Application Engagement with EBC Officers, Statutory and Non-Statutory Bodies (from September 2019)Environmental Assessment · PDF3 Jan 2024View
ES Appendix 4.2: Community and Stakeholder Involvement ScheduleEnvironmental Assessment · PDF3 Jan 2024View
ESA Chapter 13 Landscape and VisualEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 14 Interactive AssessmentEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 9.1 - Heritage Desk-Based AssessmentEnvironmental Assessment · PDF3 Jan 2024View
ES Chapter 12 Noise and VibrationEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 12.4 - Traffic Data SummaryEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 12.5 - Noise Modelling AssumptionsEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 12.2 - Noise Survey SummaryEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 12.6 - ESR Results 2023Environmental Assessment · PDF3 Jan 2024View
ES Appendix 12.8 - SRI Glazing and VentilationEnvironmental Assessment · PDF3 Jan 2024View
ES Sustainability and Energy StatementEnvironmental Assessment · PDF3 Jan 2024View
ES FRP Sustainability and Energy StatementEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 3.6 - Concept MasterplanEnvironmental Assessment · PDF3 Jan 2024View
ES OPA Phase 1 - Revised Site PlanEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 3.3 - Green Infrastructure Parameter PlanEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 3.4 - Building Heights Parameter PlanEnvironmental Assessment · PDF3 Jan 2024View
ES Addendum Technical NoteEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 1.1 - Wider OPA Red Line PlanPlan · PDF3 Jan 2024View
ES Chapter 7 Air Quality AddendumEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 3.2 - Land Use Parameter PlanEnvironmental Assessment · PDF3 Jan 2024View
ES S98 One Horton Heath C-670597-HANT-069 SWS-S98-000798 Peel Common OptionEnvironmental Assessment · PDF3 Jan 2024View
ES One Horton Heath - Non-Technical Summary, December 2020Environmental Assessment · PDF3 Jan 2024View
ES Environmental Statement Volume 1b FiguresEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 13.3 - Viewpoints A-JEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 13.1 - LVIA ReportEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 13.1: Landscape and Visual Impact Assessment Methodology summary of Approach and Criteria TablesEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 13.5 - Scoping Responses and CorrespondanceEnvironmental Assessment · PDF3 Jan 2024View
ES OPA Phase 1 FRA Addendum 1_RedactedEnvironmental Assessment · PDF3 Jan 2024View
ES Appendix 3.1 Assessment DrawingsEnvironmental Assessment · PDF3 Jan 2024View
ES Flood Risk Assessment. Addendum 2Environmental Assessment · PDF3 Jan 2024View
ES Environmental Statement Volume 2 AppendicesEnvironmental Assessment · PDF3 Jan 2024View
ES Figure 3.5 - Demolition PlanEnvironmental Assessment · PDF3 Jan 2024View
ES One Horton Heath ES Addendum - Built HeritageEnvironmental Assessment · PDF3 Jan 2024View
ES Lower Acre Site Location PlanEnvironmental Assessment · PDF3 Jan 2024View
ES Response to Pollution Control CommentsEnvironmental Assessment · PDF3 Jan 2024View
Design and Access StatementDesign And Access Statement · PDF22 Dec 2023View
OHH SIR Planning StatementPlanning Statement · PDF22 Dec 2023View
Section 38 Lighting Layout 3 of 5Plan · PDF22 Dec 2023View
Drainage Strategy sheet 3Drainage Plan · PDF22 Dec 2023View
SUPERSEDED Illustrative_Plan_Extract_4_A.pdfPlan · PDF22 Dec 2023View
SUPERSEDEDPhasing_Plan_A.pdfSupporting Info · PDF22 Dec 2023View
-Secondary Road SuDS Strategy 3.pdfDrainage Report · PDF22 Dec 2023View
Arboricultural Impact AssessmentTree Info · PDF22 Dec 2023View
Arboricultural Impact Assessment part 4Tree Info · PDF22 Dec 2023View
Arboricultural Impact AssessmentTree Info · PDF22 Dec 2023View
Lighting Impact AssessmentReport - Other · PDF22 Dec 2023View
Section 38 Lighting Layout Part 4Plan · PDF22 Dec 2023View
ApplicationFormRedacted.pdfApplication Form · PDF22 Dec 2023View
Internal Distributor Road Pre-appplication Public Consultation Report July 2023 Final.pdfReport - Other · PDF22 Dec 2023View
Transport StatementTransport Assessment · PDF22 Dec 2023View
SUPERSEDED Secondary Road SuDS Strategy 1.pdfDrainage Report · PDF22 Dec 2023View
OHH SIR Biodiversity Checklist.pdfEcological Assessment · PDF22 Dec 2023View
Arboricultural Impact AssessmentTree Info · PDF22 Dec 2023View
Acoustic AssessmentNoise Report · PDF22 Dec 2023View
OHH Secondary Infrastructure Road Ecological Appraisal FINAL 18.12.23_compressed_RedactedEcological Assessment · PDF22 Dec 2023View
SUPERSEDED Landscape Proposals_4 of 6.pdfLandscape Plan · PDF22 Dec 2023View
Section 38 Lighting Layout Part 2Plan · PDF22 Dec 2023View
Section 38 Lighting Layout Page 1Plan · PDF22 Dec 2023View
Air Quality AssessmentAir Quality Report · PDF22 Dec 2023View
Section 38 Lighting Layout Page 5Plan · PDF22 Dec 2023View
SUPERSEDED Drainage StrategyDrainage Plan · PDF22 Dec 2023View
SUPERSEDED Secondary Road SuDS Strategy 2_compressed.pdfDrainage Plan · PDF22 Dec 2023View
OHH Secondary Infrastructure Road Ecological Appraisal FINAL 18.12.23_compressed.pdfEcological Assessment · PDF22 Dec 2023View
Winter Groundwater Monitoring ReportReport - Other · PDF22 Dec 2023View
SUPERCEDED Internal Distributor Road Location Plan.pdfLocation Plan · PDF22 Dec 2023View
SUPERSEDED OVERALL HIGHWAY SUDS LOCATIONS.pdfDrainage Plan · PDF22 Dec 2023View
Archeology and Heritage AssessmentSupporting Documents · PDF22 Dec 2023View
Spine Road Drainage StrategyDrainage Report · PDF22 Dec 2023View
Biodiversity Net Gain AssessmentEcological Assessment · PDF22 Dec 2023View
Surface Water Calculations DocumentDrainage Report · PDF22 Dec 2023View
SUPERSEDED Scheme_Features_Plan_A.pdfPlan · PDF22 Dec 2023View
OHH - Secondary Road and GI - Bird Hazard Management PlanSupporting Documents · PDF22 Dec 2023View
Traffic Management Document CTMPSupporting Documents · PDF22 Dec 2023View
EIA Statement of Compliance - December 2023 Final.pdfEnvironmental Assessment · PDF22 Dec 2023View
ApplicationForm.pdfApplication Form · PDF22 Dec 2023View
Internal Distributor Road Landscape Management Plan.pdfLandscape Plan · PDF22 Dec 2023View
Arboricultural Impact Assessment_JP_09112023-45-50_Part3Tree Info · PDF22 Dec 2023View
Arboricultural Impact Assessment Part 5Tree Info · PDF22 Dec 2023View
Arboricultural Impact Assessment Part 6Tree Info · PDF22 Dec 2023View
OHH SIR FRA.pdfFlood Risk Assessment · PDF22 Dec 2023View
SUPERSEDED Drainage Strategy Sheet 2Drainage Plan · PDF22 Dec 2023View
OHH SIR CL_RedactedSupporting Info · PDF22 Dec 2023View
Arboricultural Impact AssessmentTree Info · PDF22 Dec 2023View
Arboricultural Impact Assessment PlanTree Info · PDF22 Dec 2023View
Water Quality Monitoring and Management Protocol, Link Road - updated · PDF20 Dec 2022View
Employment and Skills PlanSupporting Documents · PDF2 Sept 2022View
SUPERSEDED_Nitrate Neutrality StudySupporting Documents · PDF28 May 2021View
SUPERSEDED_ESA Appendix 7 (ES Appendix 11.3) Wider OPA Nitrate Neutrality StudySupporting Documents · PDF28 May 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Decision Notice
Planning conditions
  1. Implementation timeframe The development hereby permitted shall start no later than two years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990 and to encourage delivery.
  2. Approved plans The development hereby permitted shall be implemented in accordance with the plans listed on the ‘SID (Foxwood Road) - Main Plans List’ (dated 26 March 2026), and in broad accordance with the technical highway, drainage and lighting plans listed on the ‘SID (Foxwood Road) - Additional Plans List’ (dated 26 March 2026), unless otherwise altered in accordance with the conditions of this permission. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. Construction Environmental Management Plan Before any site clearance or development commences, a final Construction and Environmental Management Plan (CEMP), to include Code of Construction Practice and a Construction Traffic Management Plan (CTMP), shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall include the following details: a) the appointment of an Ecological Clerk of Works; b) the indicative timing and phasing of the works (including all piling, the prevention of works during periods of heavy rainfall events and the timing of ground works close to watercourses so as to avoid sensitive spawning periods for Atlantic salmon); c) confirmation of no burning of site clearance or waste on site; d) hours of working; e) the location of temporary site buildings, plant and material storage areas; f) the arrangement for construction deliveries including construction traffic routing (including any restrictions); g) measures to prevent or minimise the risks of air pollution (through controls over dust emissions, exhaust emissions, bonfires etc.); h) temporary construction car parking and turning provisions on and off-site, i) temporary artificial lighting, including hours of lighting; j) mud on the road mitigation; k) a scheme for controlling noise and vibration from construction activities (to include piling) so as not to disturb sensitive biodiversity or harm residential amenity; l) the protection, closure and/or diversion of public rights of way during construction; m) storage of and collection of waste; n) controls for the volume and the quality of surface water runoff (including treatments for pollution and sediments) and which prevent or minimises the risks of land contamination and water pollution (including minimising the area of land that is disturbed and exposed, temporary covering/protection of disturbed areas, the installation of temporary SuDS, the use of silt traps and any other relevant requirements); o) watercourse crossings and any proposed diversions (temporary or permanent); p) a map or plan showing habitat areas to be specifically protected (identified in the ecological reports) during the works and any necessary mitigation for protected species to include appropriate buffers, exclusion zones, protective fencing and any other requirements to avoid damage to hedgerows, trees, streams and other important ecological features with no trenches for services or drains sited within the crown spread of retained trees; q) Information on the persons/bodies responsible for particular activities associated with the construction phase to include suitably competent SHEQ’s on site at all times during construction who can monitor and control activities in accordance with the agreed CEMP and who shall ensure that there are satisfactory monitoring and reporting arrangements and that incidents and emergencies are immediately reported to the local planning authority; r) Details of invasive species management. All works shall be carried out in accordance with the approved CEMP and should have due regard to the advice and guidance contained in British Standard BS5228:2009 (A1 2014) “Code of Practice for noise and vibration control on construction and open sites”. Reason: In the interests of amenity, highway safety, flood risk prevention and the protection of ecology and watercourse features during construction, in accordance with Policies DM1, DM5, DM6, DM8 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  4. Tree protection The development shall accord with the arboricultural report reference 11705_R16b_JP. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plans reference 11705_P32 Rev B sheets 1 and 2. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  5. Unexpected contamination In the event that any evidence of potential contamination is found at any time when carrying out the approved development that was not previously identified in the approved Phase 2 report, it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with a methodology previously approved by the Local Planning Authority and any recommendations complied with. Following completion of measures identified in the approved remediation scheme, a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority and the road hereby approved shall not be brought in to use until such approval is provided. Reason: In the interests of human health and in order to comply with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  6. Surface water drainage Prior to commencement of the development hereby permitted (other than vegetation clearance), a detailed surface water drainage scheme for the site, shall be submitted to and approved in writing by the Local Planning Authority. The submitted details shall be in broad accordance with the submitted drainage plans shown on ‘SID (Foxwood Road - Additional Plans List’ (dated 26 March 2026) and in broad accordance with the ‘Ridge Spine Road Drainage Strategy (dated December 2023, rev. P06)’ and ‘Technical Note dated 10.09.04, ref. 5018551-TN-003 P01), and shall include: a. A technical summary highlighting any changes to the design. b. Details of the discharge watercourses to include bank / bed levels and water levels. c. Detailed drainage plans to include type, layout and dimensions of drainage features including references to link to the drainage calculations. d. Detailed drainage calculations to demonstrate existing runoff rates are not exceeded and there is sufficient attenuation for storm events up to and including 1:100 + climate change. e. Exceedance plans at a suitable scale demonstrating the flow paths and areas of ponding in the event of blockages or storms exceeding design criteria. This should also take into account potential barriers to land drainage routes, as opposed to surface water drainage for impermeable areas, to ensure the road drainage can function appropriately. The drainage system shall be implemented in accordance with the approved details prior to first use of the road. Reason: To ensure that a suitable drainage scheme is in place to manage water runoff and prevent flood risk to the site and surrounding area, in accordance with Policy DM6 of the Eastleigh Borough Local Plan (2016-2036).
  7. Drainage management and maintenance Prior to first use of the road hereby permitted, a detailed management and maintenance plan for the drainage system shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include: i. Maintenance schedules for each drainage feature type; ii. A plan detailing ownership of each drainage feature; iii. Confirmation that adoption of feature sis accepted by relevant public bodies; iv. Responsibilities of each party for the post-construction implementation, management and maintenance of the drainage scheme. The drainage scheme shall thereafter be managed and maintained in accordance with the approved details. Reason: To ensure long term maintenance of the drainage system, to prevent flood risk and protect water quality, in accordance with Policies DM5 and DM6 of the Eastleigh Borough Local Plan (2016-2036).
  8. Drainage verification Within 3 months of the completion of the drainage scheme a verification report shall be submitted to and approved in writing by the Local Planning Authority. The verification report shall contain as built plans and photographs of surface water drainage assets in situ to demonstrate correct construction has taken place. Photographs of excavations, soil profiles and any installation of flow control devices shall also be included. Reason: to ensure the drainage scheme is properly installed so as not to increase flood risk, in accordance with Policy DM6 of the Eastleigh Borough Local Plan (2016-2036).
  9. Bird Hazard Management Plan Prior to commencement of the development hereby permitted, a final Bird Hazard Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Bird Hazard Management Plan shall comply with Advice Note 3: Wildlife Hazards Around Aerodromes (CAST). The Bird Hazard Management Plan shall be implemented as approved, on completion of the development and shall remain in force for the life of the development. Reason: It is necessary to manage the areas on the development in order to minimise its attractiveness to birds which could endanger the safe movement of aircraft and the operation of Southampton Airport in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  10. Landscaping a) Within 6 months of commencement of the development (excluding vegetation clearance, demolition and groundworks), final hard and soft Landscape Plans shall be submitted to and approved in writing by the Local Planning Authority. The details shall include planting plans, schedules, species, sizes, densities, details of service runs, and an implementation timetable; b) The landscaping scheme shall be carried out in accordance with the details approved under part (a) of this condition in the first planting season following first use of the road; c) Within 3 months of completion of the landscaping scheme, written verification that the approved plans have been fully implemented shall be submitted to the Local Planning Authority for approval; d) If, within a period of 10 years after planting, any tree or plant is removed, dies or becomes, in the opinion of the Local Planning Authority, seriously damaged, defective or diseased, another tree or plant of the same species and size as that originally approved shall be planted at the same place within the next planting season. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area and biodiversity, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  11. Landscape Management Plan (LMP) Within 6 months of commencement of the development (excluding vegetation clearance, demolition and groundworks), a final updated Landscape Management Plan (LMP) shall be submitted to and approved in writing by the local planning authority. The content of the LMP shall include the following: a) Details, extent and type of new planting (planting shall be of native species appropriate to the area); b) Details of long term management and maintenance including that for watercourses, buffers around watercourses and wetland habitats and invasive non-native species controls; c) Details of new and compensatory habitat created on or off site including details of target condition for the retained habitats and those created, restored or enhanced and monitoring methods and remedial measures to ensure these targets including Biodiversity Net Gain are achieved; d) Details of watercourse buffer zones including the planting and long-term management of watercourses and their associated buffer zones; e) Prescriptions and specifications for management actions; f) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period) to deliver the management and monitoring actions; g) Details of the body or organization responsible for implementation of the plan; h) Details of how contingencies and/or remedial action will be identified, agreed and implemented to ensure the development delivers the landscape objectives of the originally approved scheme. The LMP shall be fully implemented in accordance with the approved details prior to first use of the road. Reason: To ensure that landscape, protected species and ecological management measures are appropriately devised and implemented effectively so that the overall conservation objectives of the development (including Biodiversity Net Gain) are achieved and maintained over the lifetime of the development, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  12. Archaeology monitoring During construction, the parts of the development comprising the road crossing the Parish boundary and stream valley shall be subject to archaeological monitoring, watching brief and recording, details of which shall be submitted to and agreed in writing by the Local Planning Authority prior to the commencement of development. Reason: To protect heritage interests of the site in accordance with Policy DM12 of the Eastleigh Borough Local Plan (2016-2036).
  13. Employment and Skills Plan Prior to commencement of the development hereby permitted, an Employment and Skills Plan (ESP) shall be submitted to and approved in writing by the Local Planning Authority. The ESP shall be fully complied with during the construction phase. Reason: To provide employment and skills development opportunities as a result of the development, in accordance with Policy DM16 of the Eastleigh Borough Local Plan (2016-2036).
  14. Road/footway verification In relation to the road, footways and cycleways to be provided the following requirements shall be met: a) Prior to construction of any road, footway or cycleway a plan showing the extent of the roads, footways and cycleways to be adopted and unadopted shall be submitted to and approved in writing by the Local Planning Authority; b) The road and all footways and cycleways, whether to be adopted or otherwise, shall be built to Hampshire County Council’s current adoptable construction standards. c) A verification report by a suitably qualified engineer confirming that all unadopted roads, footways and cycleways have been built to Hampshire County Council’s current adoptable construction standards shall be provided to the Local Planning Authority on completion of the final road surface. The report shall include the relevant construction details that the road, footways and cycleways have been built to and details of the professional qualifications of the person providing the verification. Reason: To ensure that the development is provided to an appropriate standard, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  15. Lighting Within 6 months of the commencement of development, a final lighting design strategy and plans shall be submitted to the local planning authority. The strategy shall be in broad accordance with the lighting plans listed on Plans List and Distributor Road Lighting Impact Assessment (Hydrock, 10/12/23, 24755-HYD-XX-XX-RP-Y-5007), and shall: a) identify those areas/ecological features and the species they support that are particularly sensitive to artificial lighting and where artificial lighting is likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and b) show how and where external lighting will be installed (through the provision of appropriate lighting contour plans and technical specifications) to clearly demonstrate that areas to be lit will not disturb or prevent the above species using their territory or having access to their breeding sites and resting places. All external lighting shall be installed in accordance with the approved details prior to first use of the road, and shall be maintained thereafter in accordance with the strategy. Under no circumstances should any other external lighting be installed without prior consent from the local planning authority. Reason: To ensure that crepuscular and nocturnal animal species are not significantly disturbed by artificial lighting such that it adversely affects their breeding, roosting, foraging and commuting patterns and behaviour and to protect residential amenity, highway safety and security, in accordance with Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  16. Adherence to Ecological Report Development shall be carried out in accordance with the recommendations of the Ecological Appraisal Report prepared by Johns Associates, ref. J00947/Version 1.2, dated 18 December 2023. Reason: To ensure that ecological features and species are protected from harm in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  17. Ecological Mitigation and Management Plan (EMMP) No development shall commence (including vegetation clearance and groundworks) until an Ecological Mitigation and Management Plan (EMMP) has been submitted to and approved in writing by the Local Planning Authority. The EMMP shall be based on the One Horton Heath Ecological Mitigation and Management Strategy Version 2, Johns Associates, September 2024 (EMMS) and the One Horton Heath Secondary Infrastructure Road Ecological Appraisal Report J00947/Version 1.2 dated18/12/23 (Johns Associates). It shall be based on up-to-date ecological survey information and detail the avoidance and mitigation measures to be carried out on and off-site, together with a timetable for implementation. The development shall be carried out in accordance with the approved details. The EMMP shall include the following: a) Detailed risk assessment of potentially damaging site clearance and construction activities; b) Method Statement for the removal or long-term management/control of any invasive non-native species (if determined to be present); c) Details of the extent and location of important ecological features and protected species (habitats, including watercourses, ponds, all hedgerows and trees, and species including great crested newt, bats, hedgehog, dormice, otter, reptiles, badger and water vole) and related green infrastructure and proposed avoidance and mitigation measures, shown on appropriate scale maps and plans; d) Identification of ‘biodiversity protection zones’ where no construction related activities will take place (including protection zones for SINCs, woodland, hedgerows, ponds and watercourses); e) Details of the requirements for updated ecological surveys to inform mitigation measures and the timetable for each survey; f) Include a Biodiversity Net Gain Plan; g) Identify where Protected Species Licences will be required; h) Detailed practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during site clearance and construction including the location and timing of sensitive works to avoid harm to important biodiversity features (may be provided as a set of method statements); i) The times during construction when specialist ecologists need to be present on site to oversee works; j) Ecological trends and site constraints that might influence management; and k) Details of long-term management responsibilities including a description and evaluation of the ecological features to be managed. The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the LMP are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The approved plan shall be fully implemented in accordance with the approved details prior to first use of the road and any subsequent variations shall be agreed in writing by the Local Planning Authority. Reason: To protect features of ecological importance during site clearance and construction in accordance with the National Planning Policy Framework (NPPF, December 2024) and Policies DM1 and DM11 of the Eastleigh Borough Local Plan (2016-2036).
  18. Pedestrian / cycle route details Within 6 months of commencement of the development, full details of all pedestrian and cycle routes, to include a timetable for implementation and details of crossing locations, shall be submitted to and approved in writing by the Local Planning Authority. The pedestrian and cycle routes shall thereafter be implemented in accordance with the approved details and timetable. Reason: To ensure suitable connectivity for cyclists and pedestrians in accordance with Policies DM1 and DM13 of the Eastleigh Borough Local Plan (2016-2036).
  19. Junctions and crossing points Prior to commencement of the development hereby permitted (other than vegetation clearance), details of the location and design of the following shall be submitted to and approved in writing by the Local Planning Authority. These details shall be in broad accordance with the submitted technical plans as included in ‘SID (Foxwood Road) - Additional Plans List’ (dated 26 March 2026): a) all junctions from the distributor road to adjacent residential land parcels to include visibility splays (excluding those within the proposed Local Centre land parcel); b) all uncontrolled and controlled crossing points, to include pedestrian and cycle priority at each crossing of a side road and suitable visibility (excluding those within the proposed Local Centre land parcel); The junctions and crossing points shall thereafter be installed in accordance with the approved details prior to first use of the road. Where a junction is not to be implemented, as a result of the detailed design of the adjacent land parcel, then a plan showing how the highway will be completed (kerbing, drainage, lighting, and any other features), shall be submitted to and approved in writing by the Local Planning Authority. Reason: To provide suitable access to adjacent land parcels in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  20. Bus stop locations and details Prior to installation of any bus stops including any temporary stops where required (excluding those within the proposed Local Centre land parcel), full details of their location and design shall be submitted to and approved in writing by the Local Planning Authority. Bus stops shall thereafter be installed in accordance with the approved details. Reason: To provide appropriate provision for public transport, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  21. Visibility splays All visibility splays shall remain clear of any obstruction over 0.6m in height in perpetuity. Reason: In the interest of highway safety in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  22. School parking strategy Prior to first use of the road hereby permitted, a School Parking Strategy to include details of parking management responsibilities to prevent parking obstruction on the road in proximity of the school, shall be submitted to and approved in writing by the Local Planning Authority. The School Parking Strategy shall thereafter be implemented in accordance with the approved details. Reason: In the interest of highway safety in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  23. Minerals No development shall commence (other than vegetation clearance) until the following has been submitted to and approved in writing by the Local Planning Authority and thereafter all works shall be carried out in accordance with the methods agreed throughout the construction period: i) A method for ensuring that such incidental materials that can be viably recovered during the development are recovered and put to beneficial use; ii) A method to record the quantity of recovered mineral (re-use on site or off-site). Reason: To provide minerals recovery and reuse where viable and to comply with Policy 15 of the Hampshire Minerals and Waste Plan.
  24. Soil handling Prior to the commencement (other than vegetation clearance) of the section of road within Grades 3a in the Agricultural Land Classification (ALC) system, as shown on plan reference 30454/999 dated May 2023 of application O/20/989498, a Soils Handling Strategy, which complies with the Defra Construction Code of Practice for the Sustainable Use of Soils on Construction , shall be submitted to, and approved in writing, by the Local Planning Authority to ensure, where feasible, the beneficial use of any higher quality (BMV) soils within the development, including in landscaping and allotments. Reason: To protect the onsite best and most versatile soil from being compromised and for compliance with Policy S5 of the Eastleigh Borough Local Plan.
  25. Note to applicant: In accordance with the National Planning Policy Framework (December 2024), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  26. Note to applicant: Advice from Southern Water: • If it is intended for Southern Water to adopt the SuDS system, it shall be designed and constructed in line with the following Design and Construction Guidance: Sewerage Sector Guidance - approved documents | Water UK • The impact of any works within the highway/access road on public apparatus shall be assessed and approved, in consultation with Southern Water, under a NRSWA enquiry in order to protect public apparatus. Please send these enquiries to: Developer.Services@southernwater.co.uk. • Any new connections to the public sewerage system will require a Section 106 connection application to Southern Water. For further advice please contact Southern Water, Southern House, Yeoman Road, Worthing, West Sussex, BN13 3NX (tel. 03303030119). • Please refer to Southern Water’s consultation response dated 31 December 2025 for further information on the above matters.
  27. Note to applicant: Advice from Hampshire County Council Countryside Service: i Nothing connected with the development, or its future use should have an adverse effect on the right of way, which must always remain available for public use. ii All vehicles and plant crossing a Public Right of Way should give way to public users, which could include horse-riders and cyclists, at all times. iii Any damage caused to the surface of the Public Right of Way by construction traffic will be required to be restored to the satisfaction of the Area Countryside Access Manager on the completion of the build. iv. There must be no surface alterations to a Public Right of Way without the prior consent of Hampshire County Council as Highway Authority. To carry out any such works without this permission would constitute an offence under s131 Highways Act 1980.
  28. Note to applicant: Advice from Natural England - Site clearance and construction works that could result in harm or disturbance to species listed on Schedule 2 of the Conservation of Habitats and Species Regulations, 2017 (as amended) or their breeding sites or resting places, shall not in any circumstances commence unless the local planning authority has been provided with either: a) a licence issued by [the relevant licensing body] pursuant to Regulation 55 of The Conservation of Habitats and Species Regulations 2017 authorising the specified activity/development to go ahead; b) written confirmation from Natural England or accredited ecologist that the operation does not require such a licence. The works must be undertaken strictly in accordance with the methods, conditions and limitations of the licence granted.
  29. Note to applicant: Advice from the Lead Local Flood Authority (LLFA) – If the proposals include works to an ordinary watercourse, prior consent from the LLFA is required.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.