Council planning record

Erection of 70-bed C2 Care Home incorporating an ancillary Community Hub with new vehicular access to White Stork Road (AMENDED DESCRIPTION)

Land at Fieldfare Road, adjacent to the roundabout with Winchester Road.,

Decided PermitReference: F/23/96629Eastleigh Borough Council

Last published check: 1 Oct 2026, 04:00. Check the council record for more recent changes.

Application location

Land at Fieldfare Road, adjacent to the roundabout with Winchester Road.,

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
21 Dec 2023
Validated
11 Jan 2024
Determination deadline
13 Jun 2025
Local authority
Eastleigh Borough Council

Application overview

Erection of 70-bed C2 Care Home incorporating an ancillary Community Hub with new vehicular access to White Stork Road (AMENDED DESCRIPTION)

Proposal details

Reference
F/23/96629
Alternative references
12575802
Ward
Botley Ward
Parish
Botley CP
Agent
Mr Jon Gateley

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 169 of 169

DocumentPublishedAction
Approval of Non-Material AmendmentDecision Notice · PDF13 Mar 2026View
Landscape · PDF6 Mar 2026View
AMENDED Soft Landscape ProposalsNonmaterial Minor Amendment · PDF3 Mar 2026View
AMENDED Drainage LayoutNonmaterial Minor Amendment · PDF26 Feb 2026View
AMENDED Proposed Site Plan - Hard LandscapingNonmaterial Minor Amendment · PDF26 Feb 2026View
LandscapeNonmaterial Minor Amendment · PDF2 Feb 2026View
Urban DesignNonmaterial Minor Amendment · PDF2 Feb 2026View
Proposed Pergola DetailsNonmaterial Minor Amendment · PDF15 Jan 2026View
External Building Materials V1Nonmaterial Minor Amendment · PDF15 Jan 2026View
AMENDED Proposed South and SE ElevationsNonmaterial Minor Amendment · PDF6 Jan 2026View
AMENDED Proposed NE, NW and East ElevationsNonmaterial Minor Amendment · PDF6 Jan 2026View
AMENDED Proposed North and West ElevationsNonmaterial Minor Amendment · PDF6 Jan 2026View
AMENDED Proposed Site PlanNonmaterial Minor Amendment · PDF18 Dec 2025View
AMENDED Proposed Site Sections Sheet 1Nonmaterial Minor Amendment · PDF18 Dec 2025View
AMENDED Proposed Site Sections Sheet 3Nonmaterial Minor Amendment · PDF18 Dec 2025View
AMENDED Proposed Roof PlanNonmaterial Minor Amendment · PDF18 Dec 2025View
TreesNonmaterial Minor Amendment · PDF11 Nov 2025View
HCC HighwaysNonmaterial Minor Amendment · PDF10 Nov 2025View
Urban DesignNonmaterial Minor Amendment · PDF10 Nov 2025View
Refuse Store DetailsNonmaterial Minor Amendment · PDF23 Oct 2025View
Cycle Store DetailsNonmaterial Minor Amendment · PDF23 Oct 2025View
Drainage Strategy ReportNonmaterial Minor Amendment · PDF23 Oct 2025View
Proposed Ground Floor PlanNonmaterial Minor Amendment · PDF23 Oct 2025View
Proposed Site Sections Plans - Sheet 2Nonmaterial Minor Amendment · PDF23 Oct 2025View
Proposed First Floor PlanNonmaterial Minor Amendment · PDF23 Oct 2025View
Proposed Second Floor PlanNonmaterial Minor Amendment · PDF23 Oct 2025View
NMA Cover Letter_RedactedNonmaterial Minor Amendment · PDF23 Oct 2025View
Proposed Second Floor PlanNonmaterial Minor Amendment · PDF23 Oct 2025View
Attachment SummaryNonmaterial Minor Amendment · PDF23 Oct 2025View
Application Form RedactedNonmaterial Minor Amendment · PDF23 Oct 2025View
S106 Agreement_redactedLegal Agreement · PDF13 Jun 2025View
F_23_96629 Decision notice informative leaflet - PERMITDecision · PDF13 Jun 2025View
F_23_96629 PL_Final DecisionDecision Notice · PDF13 Jun 2025View
Final agreed draft of S106 Legal AgreementLegal Agreement · PDF15 May 2025View
Minutes for HEWEB 27 Jan 2025Meeting Agenda / Minutes · PDF27 Jan 2025View
Committee Update for HEWEB 27.1.25Committee Report · PDF27 Jan 2025View
Committee Report for HEWEB 27.1.25Committee Report · PDF17 Jan 2025View
LandscapeConsultation Response · PDF16 Jan 2025View
AMENDED Proposed Ground Floor PlanFloor Plan · PDF15 Jan 2025View
Natural England - response to HRA Appropriate AssessmentConsultation Response · PDF15 Jan 2025View
AMENDED Proposed Second FloorFloor Plan · PDF14 Jan 2025View
AMENDED Proposed First FloorFloor Plan · PDF14 Jan 2025View
Urban Design - car park landscapingConsultation Response · PDF13 Jan 2025View
AMENDED Ecological Report Jan 2025Ecological Assessment · PDF9 Jan 2025View
AMENDED Proposed North and West ElevationsElevations Plan · PDF8 Jan 2025View
AMENDED Soft Landscape ProposalsLandscape Plan · PDF8 Jan 2025View
HRA Appropriate AssessmentEnvironmental Assessment · PDF20 Dec 2024View
Additional information re: care home occupancy levelsSupporting Documents · PDF19 Dec 2024View
Landscape - car park tree species & tree pit detailsConsultation Response · PDF19 Dec 2024View
EcologyConsultation Response · PDF17 Dec 2024View
Note re: balcony noise levelsSupporting Documents6 Dec 2024View
Note re: use of local GPs and need for care homeSupporting Documents6 Dec 2024View
Care Home Need AssessmentSupporting Documents · PDF6 Dec 2024View
Landscape - CGIsConsultation Response · PDF5 Dec 2024View
Urban Design - CGIsConsultation Response4 Dec 2024View
Environmental Health - Air Quality & OdourConsultation Response · PDF3 Dec 2024View
AMENDED Proposed Bin StoreElevations And Floor Plan · PDF20 Nov 2024View
TreesConsultation Response · PDF19 Nov 2024View
HCC HighwaysConsultation Response · PDF15 Nov 2024View
ADDITIONAL Addendum Parking NoteTransport Assessment · PDF7 Nov 2024View
AMENDED Nutrient Neutrality Calculator DRAFT v2Supporting Documents5 Nov 2024View
AMENDED Proposed Private Gardens CGISupporting Documents5 Nov 2024View
AMENDED Proposed South Western CGISupporting Documents5 Nov 2024View
AMENDED Proposed South Eastern CGISupporting Documents5 Nov 2024View
AMENDED Proposed North Eastern CGISupporting Documents5 Nov 2024View
AMENDED Proposed Community Hub Entrance CGISupporting Documents5 Nov 2024View
AMENDED Proposed Care Home Entrance CGISupporting Documents5 Nov 2024View
Urban DesignConsultation Response · PDF31 Oct 2024View
EcologyConsultation Response · PDF29 Oct 2024View
LandscapeConsultation Response · PDF24 Oct 2024View
AMENDED Proposed Cycle StoreElevations And Floor Plan · PDF22 Oct 2024View
Biodiversity Net Gain (BNG) and Biodiversity Enhancements letterSupporting Documents · PDF21 Oct 2024View
HCC HighwaysConsultation Response · PDF21 Oct 2024View
Statutory Biodiversity Metric Calculation Tool, October 2024Supporting Documents21 Oct 2024View
Ozone Odour Control System detailsSupporting Documents · PDF16 Oct 2024View
AMENDED Tree Protection PlanTree Info · PDF16 Oct 2024View
Rolec EV Charging detailsSupporting Documents · PDF16 Oct 2024View
ACD Document Issue SheetSupporting Documents · PDF16 Oct 2024View
AMENDED Arboricultural Impact Assessment & Method Statement (inc Tree Survey Schedule) rev ETree Info · PDF16 Oct 2024View
AMENDED Proposed Site PlanSite Layout Plan · PDF15 Oct 2024View
AMENDED Hard Landscape ProposalsLandscape Plan · PDF15 Oct 2024View
EcologyConsultation Response · PDF10 Oct 2024View
AMENDED Preliminary Ecological Appraisal - March 2024Ecological Assessment · PDF26 Sept 2024View
HCG - Mobility Scooters_RedactedSupporting Documents · PDF25 Sept 2024View
Proposed Site Sections Sheet 3Section Plan · PDF25 Sept 2024View
Heating and Hot Water Schematic LayoutPlan · PDF25 Sept 2024View
Combined Heat and Power (CHP) Unit Technical Data (Dachs-Gen2)Supporting Documents · PDF25 Sept 2024View
Urban DesignConsultation Response · PDF23 Sept 2024View
Environmental HealthConsultation Response · PDF20 Sept 2024View
HCC Flood & WaterConsultation Response · PDF13 Sept 2024View
LandscapeConsultation Response · PDF12 Sept 2024View
ADDITIONAL External Noise Amenity Memo (21.8.24)Noise Report · PDF9 Sept 2024View
AMENDED Proposed Roof PlanRoof Plan · PDF9 Sept 2024View
AMENDED Proposed North East, North West and East ElevationsElevations Plan · PDF9 Sept 2024View
AMENDED Proposed South and South East ElevationsElevations Plan · PDF9 Sept 2024View
Hedge End Town CouncilParish Response · PDF5 Sept 2024View
Botley Parish CouncilParish Response · PDF28 Aug 2024View
Environmental Health - Contaminated LandConsultation Response · PDF19 Aug 2024View
LandscapeConsultation Response · PDF15 Aug 2024View
Covering email from agent with amended drainage and FRA informationCorrespondence Incoming5 Aug 2024View
AMENDED Flood Risk Assessment & Drainage Strategy rev CFlood Risk Assessment · PDF5 Aug 2024View
HCC HighwaysConsultation Response · PDF5 Aug 2024View
Drainage Strategy LayoutDrainage Plan · PDF5 Aug 2024View
Planning Statement - Addendum re: Community HubSupporting Documents · PDF1 Aug 2024View
Urban DesignConsultation Response · PDF30 Jul 2024View
BREEAM Pre-assessment ReportSupporting Documents · PDF25 Jul 2024View
Environmental Health - NoiseConsultation Response · PDF23 Jul 2024View
ADDITIONAL Proposed Site Sections Sheet 2Section Plan · PDF18 Jul 2024View
ADDITIONAL Proposed Site Sections Sheet 1Section Plan · PDF18 Jul 2024View
EcologyConsultation Response · PDF16 Jul 2024View
Design & Access Statement Addendum - rev CDesign And Access Statement · PDF15 Jul 2024View
Transport Statement - June 2024Transport Assessment · PDF15 Jul 2024View
Covering email from agent with amended plans and amended descriptionSupporting Documents · PDF15 Jul 2024View
Design Review PanelConsultation Response · PDF24 May 2024View
PolicyConsultation Response · PDF15 Apr 2024View
EcologyConsultation Response · PDF26 Mar 2024View
Additional ecological informationSupporting Documents · PDF20 Mar 2024View
Boorley Green Ecology Addendum March 2024Ecological Assessment · PDF20 Mar 2024View
NHS Hampshire Integrated Care Board (ICB)Consultation Response · PDF4 Mar 2024View
Direct Services - Neighbourhood Green Open SpacesConsultation Response · PDF29 Feb 2024View
Urban Design - comments on CGIsConsultation Response · PDF26 Feb 2024View
Environmental Health - Noise & Air QualityConsultation Response · PDF23 Feb 2024View
TreesConsultation Response · PDF23 Feb 2024View
Hedge End Town CouncilParish Response8 Feb 2024View
Botley Parish CouncilParish Response · PDF6 Feb 2024View
Natural EnglandConsultation Response · PDF6 Feb 2024View
Environmental Health - Contaminated LandConsultation Response · PDF5 Feb 2024View
Southampton AirportConsultation Response2 Feb 2024View
Southern WaterConsultation Response · PDF31 Jan 2024View
Southern Water GISConsultation Response · PDF31 Jan 2024View
Urban DesignConsultation Response · PDF29 Jan 2024View
HCC HighwaysConsultation Response · PDF26 Jan 2024View
HCC Flood & WaterConsultation Response · PDF25 Jan 2024View
EcologyConsultation Response · PDF24 Jan 2024View
LandscapeConsultation Response · PDF22 Jan 2024View
Curdridge Parish CouncilParish Response · PDF22 Jan 2024View
HCC ArchaeologyConsultation Response · PDF15 Jan 2024View
RamblersConsultation Response · PDF12 Jan 2024View
Topographical LayoutPlan · PDF11 Jan 2024View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 15)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 12)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 13)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 5)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 9)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 10)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 11)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 14)Supporting Documents · PDF22 Dec 2023View
Planning Statement_RedactedPlanning Statement · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4- part 4)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 1)_RedactedSupporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 6)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 7)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 8)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 1)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 2)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - part 3)Supporting Documents · PDF22 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 2)Supporting Documents · PDF21 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 6)Supporting Documents · PDF21 Dec 2023View
Noise Impact AssessmentNoise Report · PDF21 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 7)Supporting Documents · PDF21 Dec 2023View
Marketing report and appendixSupporting Documents · PDF21 Dec 2023View
Soft Landscape Specification - December 2023Supporting Documents · PDF21 Dec 2023View
Sustainability Statement ReportSupporting Documents · PDF21 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 5Supporting Documents · PDF21 Dec 2023View
ApplicationFormRedacted.pdfApplication Form · PDF21 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 3Supporting Documents · PDF21 Dec 2023View
Existing Site Location PlanLocation Plan · PDF21 Dec 2023View
Phase 1 Desk Study and Preliminary Land Contamination Risk Assessment (Part 4 - complete)Supporting Documents · PDF21 Dec 2023View
Design and Access StatementDesign And Access Statement · PDF21 Dec 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Approval of Non-Material Amendment F_23_96629 Decision notice informative leaflet - PERMIT F_23_96629 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans and documents numbered: H.21.61/(9-) 1 “Existing Site Location Plan”H.21.61/(9-)3 “Topographical Layout”H2161-ADG-ZZ-GF-DR-A-0001 rev 15 “Proposed Ground Floor Plan”H2161-ADG-ZZ-01-DR-A-0002 rev 15 “Proposed First Floor”H2161-ADG-ZZ-02-DR-A-0003 rev 13 “Proposed Second Floor”H2161-ADG-ZZ-03-DR-A-0004 rev 6 “Proposed Roof Plan”H2161-ADG-ZZ-XX-DR-A-0101 rev 7 “Proposed South and South East Elevations”H2161-ADG-ZZ-XX-DR-A-0102 rev 8 “Proposed North East, North West and East Elevations”H2161-ADG-ZZ-XX-DR-A-0103-rev 11 “Proposed North and West Elevations”H2161-ADG-ZZ-XX-DR-A-9002 rev AA “Proposed Site Plan”H2161-ADG-ZZ-XX-DR-A-9010 rev 2 “Proposed Bin Store”H2161-ADG-ZZ-XX-DR-A-9011 rev 2 “Proposed Cycle Store”H2161-ADG-ZZ-XX-DR-A-9020 “Proposed Site Sections Sheet 1”H2161-ADG-ZZ-XX-DR-A-9021 rev 1 “Proposed Site Sections Sheet 2”H2161-ADG-ZZ-XX-DR-A-9022 “Proposed Site Sections Sheet 3”PRI24389 11G “Soft Landscape Proposals”PRI24389 12C “Hard Landscape Proposals”ACD Environmental’s “Soft Landscape Specification” (reference PRI24389, dated December 2023)PRI24389-03E “Tree Protection Plan”ACD Environmental’s “Arboricultural Impact Assessment & Method Statement (Including Tree Survey Schedule) rev E (reference PRI24389aia_ams, dated 14.10.24)23094/DS01 rev P3 “Drainage Strategy Layout” Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The development hereby approved, excluding the Community Hub, shall be used only for purposes within Class C2 "Residential Institutions" of the schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), (or in any provision equivalent to that/those Class in any statutory instrument revoking and re-enacting that Order with or without modification) and for no other purposes. Reason: In the interests of proper planning, highway safety, local amenity and in accordance with The Conservation of Habitats and Species Regulations 2017 (as amended).
  4. No construction or demolition work shall start on site until a Construction Environmental Management Plan has been submitted to and approved in writing by the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved management plan which shall include: a) Means of access for construction work; b) A programme and phasing of demolition and construction work, including access, car parking and landscaping; c) Location of temporary site buildings, compounds, parking of site operatives and visitors, construction material and plant storage areas used during demolition and construction; d) The arrangements for deliveries associated with all construction works, including lorry routing, loading / unloading of plant, machinery & materials and restoration of any damage to the highway (including vehicle crossovers and grass verges); e) Protection of pedestrian routes during construction; f) A noise and vibration assessment which takes into account the impact of demolition, piling works and noise generating plant on existing and proposed noise sensitive properties, including a scheme of mitigation measures for protecting from noise and vibration; g) Provision for storage, collection, and disposal of recycling / waste from the development during construction period; h) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process; i) Measures to control the emission of dust and dirt during construction (having regard to the details contained in the IAQM’s “Guidance on the assessment of dust from demolition and construction” (January 2024 Version 2.2) and the Mayor of London’s “The control of dust and emissions during construction and demolition” Supplementary Planning Guidance (July 2014); j) Safeguards to be used within the construction process to ensure surface water contains no pollutants on leaving the site, including suspended solids, and measures to protect nearby waterways from pollution impacts; k) Protection of trees and ecology (to include Habitats Regulation Assessment requirements); l) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; m) Temporary lighting; n) No burning on site during construction and fitting out of the development. Reason: To limit the impact the development has on the amenity of the locality.
  5. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  6. No development shall take place until the following has been submitted to, and approved in writing by, the Local Planning Authority: a) A site investigation report, documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the Preliminary Investigation and in accordance with BS10175:2011, BS 8576:2013, BS 8485:2015+A1:2019, Claire RB17, CIRIA C665 and unless otherwise agreed with the Local Planning Authority; b) If required, a detailed site-specific scheme for remedial works, and measures to be undertaken to avoid the risk from contaminants and / or gases when the site is developed, and proposals for future maintenance and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Reason: To minimise the risk from land contamination for the safety of the future site users.
  7. The development hereby permitted shall not be occupied / brought into use until there has been submitted to and approved in writing by the Local Planning Authority verification by the competent person approved under the provisions of condition 6(b) that any remediation scheme required and approved under the provisions of condition 6(b) has been implemented fully in accordance with the approved details (unless varied with the written permission of the Local Planning Authority in advance of implementation). Unless agreed in writing with the Local Planning Authority such verification shall accord with UK Land contamination risk management (LCRM) national guidance. Typically such a report would comprise: a) A description of the site and its background, and summary of relevant site information; b) A description of the remediation objectives and remedial works carried out; c) Verification data, including - data (sample locations/analytical results), as built drawings of the implemented scheme, photographs of the remediation works in progress, etc. d) Certificates demonstrating that imported and / or material left in situ is free from contamination, confirmation of material removal, gas / vapour membranes have been installed correctly. Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition 6(b). Reason: To minimise the risk from land contamination for the safety of the future site users.
  8. The development must accord with the arboricultural report reference PRI24389aia_ams Rev E. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan reference PRI24389-03 Rev E. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  9. No excavation, demolition or development related works shall take place on site until an arboricultural monitoring statement proposal, detailing supervision for arboriculturally sensitive activity and reporting of monthly inspections of tree protection measures, has been submitted to and approved in writing by the Local Planning Authority. The approved arboricultural monitoring statement proposal must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. This condition may only be fully discharged upon completion of the proposed development, subject to submission of all monitoring reports as detailed in the approved arboricultural monitoring statement. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  10. The development hereby permitted shall not be occupied/brought into use until the access, including the footway and / or verge crossing has been constructed in line with a S278 agreement with Hampshire County Council Reason: To provide satisfactory access and in the interests of highway safety.
  11. No development above slab level shall start until details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  12. The development hereby permitted shall be implemented in accordance with the recommendations outlined in the letter from Ecosupport to Lisa Malter dated 9.1.25, titled "RE: Ecology response 10/10/24 for F/23/96629 Land at Fieldfare Road, adjacent to the roundabout with Winchester Road". Reason: To protect and enhance biodiversity.
  13. No development above slab level shall commence until details of all heating, cooling, and ventilation plant and equipment to be installed have been submitted to and approved in writing by the Local Planning Authority. These details shall include any measures to minimise air emissions, in compliance with the Air Quality Objectives set out in the UK Air Quality Strategy and Eastleigh Borough Council’s Air Quality Action Plan, and relevant DEFRA guidance. All equipment must be installed, operated, and maintained in accordance with the manufacturer’s specifications for the approved details. Reason: To ensure the development does not adversely affect local air quality and to safeguard public health and the environment.
  14. No development above slab level shall commence until a fully detailed landscape scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be in accordance with the approved Soft and Hard Landscape Proposals shown on drawings PRI24389_11G and PRI24389_12C and shall cover all soft and hard landscaping, including trees and detailed designs for the associated soil cells and soil volumes and provide large-scale details of all boundary treatments. Details of timings for all landscaping shall also be included. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality.
  15. No development above slab level shall commence until a landscape management plan and maintenance schedule has been submitted to and approved in writing by the Local Planning Authority. The landscape scheme shall thereafter be managed in accordance with the approved details. Reason: In the interests of the visual amenities of the locality.
  16. The tree pits shall be installed in accordance with the approved details, including soil cell and soil volume details, and, prior to surfacing of the car park, a verification report prepared by the installers of the soil cells confirming their correct installation shall be submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual amenities of the locality.
  17. Prior to the planting of the species-rich grassland in the areas shown on the approved Soft Landscape Proposals shown on drawing PRI24389_11G, details of the soil testing undertaken to establish the most appropriate meadow mixture for the soil conditions shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: To protect and enhance biodiversity.
  18. For a period of no less than 10 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenities of the locality.
  19. Within 3 months of the first occupation of the development hereby approved a BREEAM New Construction Post Construction certificate at 'Excellent' standard shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality environmentally sustainable design.
  20. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for which they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nutrient impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017 (as amended) and Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  21. Prior to the first occupation of the development hereby proposed, a scheme to demonstrate that the internal sound levels within habitable rooms will conform to the standard identified by BS 8233 2014, Sound Insulation and Noise Reduction for Buildings - Code of Practice, whilst providing satisfactory ventilation, shall be submitted to and approved in writing by the Local Planning Authority. In bedrooms the scheme must achieve noise levels of 35dB LAeq or lower between the hours of 07:00 and 23:00 and 30dB LAeq or lower between the hours of 23:00 to 07:00. In living / resting rooms the scheme must achieve a noise level of 35dB LAeq or lower between the hours of 07:00 and 23:00. The development hereby approved shall then be implemented in accordance with the approved details prior to occupation of the premises and retained as such thereafter. Reason: In the interests of residential amenity.
  22. The combined sound from all external plant, mechanical ventilation and flues shall be designed to achieve a rating level (LAr,Tr) 5dB below the measured background noise (LA90) as measured one metre from the nearest affected window of the nearest affected habitable room, unless agreed in writing by the Local Planning Authority, as defined in British Standard BS 4142: 2014 +A1:2019 ‘Methods for rating and assessing industrial and commercial sound’. An assessment to demonstrate that the design can achieve this standard shall be carried out for three separate periods of interest: 07:00 hours to 18:00 hours; 18:00 hours to 23:00 hours and 23:00 hours to 07:00 hours and submitted to the Local Planning Authority for approval. The external plant and flues shall be constructed in accordance with the approved details and retained as such for the lifetime of the development, unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interests of residential amenity.
  23. The development hereby permitted shall not be brought into use until the existing access(es) from the site to White Stork Road have been permanently stopped up and effectively closed with the footway provided or verge reinstated, in accordance with details which have been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of highway safety.
  24. The development hereby permitted shall not be brought into use until the car park has been constructed, surfaced and marked out, and the cycle parking installed, in accordance with the approved plans. The approved car parking area shall not thereafter be used for any purpose other than the turning, parking, loading and unloading of vehicles and the cycle parking shall be retained thereafter for the purposes of parking of cycles and not used for any other purpose. Reason: To make provision for off street parking and cycle parking for the purpose of highway safety and enabling sustainable travel.
  25. The development hereby permitted shall not be brought into use until a Car Park Management Plan has been submitted to and approved in writing by the Local Planning Authority. The Plan shall provide details of the how the car park shall be managed to enable use by staff, care home visitors and community hub users and details shall include confirmation of the dedicated car parking space for the community hub, with details of how it is to be identified on-site, and details of the electrical vehicle charging points to be installed. The car park shall be managed in accordance with the approved details. Reason: To provide satisfactory parking arrangements and in the interests of highway safety.
  26. The development hereby permitted shall not be brought into use until a Refuse Collection Management Plan has been submitted to and approved in writing by the Local Planning Authority. The Plan shall stipulate the maximum size of the refuse vehicle to be contracted to collect refuse internally from the site. This vehicle must be no larger than the Small Refuse Vehicle measuring 6.623m x 2.200m shown on the Swept Path Analysis plans contained in Appendix 3 of Connect Consultant’s Transport Statement, dated June 2024. The refuse collection for the development shall be in accordance with the approved details. Reason: To provide satisfactory access and in the interests of highway safety.
  27. Notwithstanding the Town and Country Planning (Control of Advertisements)(England) Regulations 2007 (as amended), the development hereby permitted shall not be brought into use until a Signage Strategy has been submitted to and approved in writing by the Local Planning Authority. The Strategy shall set out the location, size and style of all signage related to the development and the development shall be carried out in accordance with the approved details. Reason: In the interests of visual amenity.
  28. Any windows or balcony screens marked on the approved plans as obscure glazed shall be obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight. Once installed the windows and screens shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  29. Notes to Applicant: In accordance with paragraph 39 of the National Planning Policy Framework, Eastleigh Borough Council take a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner. Due to the site's location please be aware of the requirements within the UK Civil Aviation Authority's CAP1096 "Guidance to crane users on the crane notification process and obstacle lighting and marking".
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.