Council planning record

Conversion of offices to 2.No HMO's for 6 unrelated persons (C4), single storey side/rear extension to No 107, amenity space, parking, boundary containment, alterations to fenestrations. (Amended description).

107/109, Leigh Road, SO50 9DR

Decided PermitReference: F/23/96585Eastleigh Borough Council

Last published check: 1 Oct 2026, 18:16. Check the council record for more recent changes.

Application location

107/109, Leigh Road, SO50 9DR

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
13 Dec 2023
Validated
13 Dec 2023
Determination deadline
7 Feb 2024
Local authority
Eastleigh Borough Council

Application overview

Conversion of offices to 2.No HMO's for 6 unrelated persons (C4), single storey side/rear extension to No 107, amenity space, parking, boundary containment, alterations to fenestrations. (Amended description).

Proposal details

Reference
F/23/96585
Alternative references
12670735
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP
Agent
Mr Robert Narramore

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
F-23-96585 107-109 Leigh RoadOfficer Report · PDF3 Apr 2024View
F_23_96585 PL_Final DecisionDecision Notice · PDF3 Apr 2024View
Legal Agreement ReceiptLegal Agreement Supporting Info · PDF3 Apr 2024View
107 and 109 Leigh Road HMO Application-Proposed Rev A 107 to 109Plan · PDF13 Feb 2024View
107 and 109 Leigh Road HMO Application-Proposed Rev A 107 to 109 Site PlanPlan · PDF13 Feb 2024View
ApplicationFormRedacted.pdfApplication Form · PDF13 Dec 2023View
Existing Elevation and Floor PlanElevations And Floor Plan · PDF13 Dec 2023View
Proposed Elevation and Floor PlanElevations And Floor Plan · PDF13 Dec 2023View
Design and Access Statement Sui Generis_RedactedDesign And Access Statement · PDF13 Dec 2023View
Proposed Block PlanBlock Plan · PDF13 Dec 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

Permit
F_23_96585 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: • Existing Elevations and Plans PL/01 • Proposed Sui Generis HMO for More than 6 Unrelated Persons PL/02 Rev A • Proposed Sui Generis HMO for More than 6 Unrelated Persons PL/03 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  3. No development shall commence on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: (a) Location of construction materials, and plant storage areas used during demolition and construction; (b) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. (c) The parking of vehicles of site operatives and visitors; (d) A scheme for controlling noise and vibration from demolition and construction activities; (e) Provision for storage, collection, and disposal of rubbish from the development during construction period; (f) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; and (g) protection of pedestrian routes. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  4. No development shall commence until details for the sustainable disposal of surface water from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
  5. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  6. No construction, demolition or deliveries to the site shall take place during the demolition and construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  7. No excavation, demolition or development related works shall take place on site until an arboricultural method statement and a tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), are submitted and approved by the LPA. The approved documents must be adhered to in full, and may only be modified subject to written agreement from the Local Planning Authority. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  8. No trees within the site shall be felled, uprooted, wilfully damaged, or destroyed, cut back in any way or removed without the prior written consent of the Local Planning Authority. Any trees removed without such consent, or which die or become severely damaged or seriously diseased within five years from the date of first occupation of the building hereby permitted shall be replaced with trees of similar size and species and shall be planted in the immediate vicinity unless the Local Planning Authority gives its written consent to any variation. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  9. Prior to first occupation a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard and soft landscaping (including boundary treatments, and biodiversity enhancements, which as a minimum shall include the installation of nesting boxes/ bricks) and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard, and maintained thereafter. For a period of 5 years after planting, any trees of plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  10. Prior to first occupation, details of measures to protect future occupiers of the development from noise and air pollution associated with Leigh Road shall be submitted to, agreed in writing by the Local Planning Authority and implemented. These agreed and implemented measures shall then be retained in full working order throughout the lifetime of the development. Reason: The application site falls within the Eastleigh Air Quality Management Area and is subject to significant levels of noise and air pollution.
  11. Prior to first occupation, the vehicle parking and bin storage shall be provided in accordance with the approved plans and thereafter permanently retained. Reason: To make provision for off street parking for the purpose of highway safety.
  12. Prior to first occupation, cycle storage for at least 12 bicycles (6 per property) shall be provided in accordance with full details that have first been submitted to and approved in writing by the Local Planning Authority, to include details of siting and security measures. The cycle storage shall thereafter be retained for cycle storage purposes only for the lifetime of the development. Reason: To encourage sustainable modes of transport.
  13. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nutrient impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  14. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  15. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  16. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  17. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.