Council planning record

Demolition and Replacement of 2-changing room sports pavilion and groundsman facilities. No change of use proposed

PAVILION, LONG LANE DISTRICT PARK, LONG LANE, BURSLEDON, SOUTHAMPTON, SO31 8DA

Decided PermitReference: F/23/96488Eastleigh Borough Council

Last published check: 1 Oct 2026, 19:32. Check the council record for more recent changes.

Application location

PAVILION, LONG LANE DISTRICT PARK, LONG LANE, BURSLEDON, SOUTHAMPTON, SO31 8DA

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
24 Nov 2023
Validated
4 Dec 2023
Determination deadline
16 Feb 2024
Local authority
Eastleigh Borough Council

Application overview

Demolition and Replacement of 2-changing room sports pavilion and groundsman facilities. No change of use proposed

Proposal details

Reference
F/23/96488
Alternative references
12395660
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
Mr Harry Lee

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 20 of 20

DocumentPublishedAction
F-23-96488 Pavilion, Long Lane District ParkOfficer Report · PDF15 Feb 2024View
F_23_96488 PL_Final DecisionDecision Notice · PDF15 Feb 2024View
20240116 66494 - ON NO E2 - Burlesdon Recreation Ground_RedactedConsultation Response · PDF16 Jan 2024View
Ecology response amended 15 1 24 for F 23 96488 PAVILION, LONG LANE DISTRICT PARK, LONG LANE, BURSLEDONConsultee Response · PDF15 Jan 2024View
Ecology response amended for F 23 96488 PAVILION, LONG LANE DISTRICT PARK, LONG LANE, BURSLEDONConsultee Response · PDF28 Dec 2023View
Existing ElevationsElevations Plan · PDF4 Dec 2023View
Heritage Statement_F2396488Supporting Documents · PDF29 Nov 2023View
Location Plan_Bursledon Recreation Ground_UpdatedLocation Plan · PDF28 Nov 2023View
Block Plan_Existing_Bursledon Recreation Ground_updatedBlock Plan · PDF28 Nov 2023View
Long Lane Pavillion_Biodiversity Net Gain Assessment Report.pdfReport - Other · PDF24 Nov 2023View
Arboricultural report · PDF24 Nov 2023View
Long Lane Pavilion Phase II Letter Report - Final.pdfOther · PDF24 Nov 2023View
Proposed Elevations.pdfElevations Plan · PDF24 Nov 2023View
ApplicationFormRedacted.pdfApplication Form · PDF24 Nov 2023View
Proposed Site Plan.pdfSite Layout Plan · PDF24 Nov 2023View
Tree ReportTree Info · PDF24 Nov 2023View
Proposed Plan.pdfPlan · PDF24 Nov 2023View
Design and Access Statement_Long Lane Pavilion .pdfDesign And Access Statement · PDF24 Nov 2023View
Block Plan_Existing_Bursledon Recreation GroundBlock Plan · PDF3 Jul 2023View
Location Plan_Bursledon Recreation GroundLocation Plan · PDF3 Jul 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_96488 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: • Location Plan: Bursledon Recreation Ground • Block Plan TQRQM23123151426936 • Elevations As Existing 5021481 RDG XX XX D B 0009 • Plans & Elevations As Proposed 5021481 RDG XX 00 D B 0001 Rev D • Elevations As Proposed 5021481 RDG XX XX D B 0010 Rev B • Site Plan As Proposed 5021481 RDG XX ST D B 0011 • Tree Survey Report (September 2023) (CBA11083LLRG V2) • Arboricultural Development Statement (November 2023) • Preliminary Ecological Appraisal (March 2023) • Ecosupport Long Lane, Bursledon: Phase II Bat Survey Report (dated 23 October 2023) • Biodiversity Net Gain Assessment, Monitoring and Management Plan (November 2023) • ENC/130323/2693S1 • As Laid Drainage Plan Reason: For the avoidance of doubt and in the interests of proper planning.
  3. No development shall start on site until a construction method statement has been submitted to and approved in writing by the Planning Authority, which shall include: (a) A programme of and phasing of demolition (which shall be undertaken by a specialist contractor, whereby if asbestos is found it shall be managed in accordance with ‘Control of Asbestos Regulations CAR 2012’) and construction work; (b) The provision of long term facilities for contractor parking; (c) The arrangements for deliveries associated with all construction works; (d) Methods and phasing of construction works; (e) Access and egress for plant and machinery; (f) Protection of pedestrian routes during construction; (g) Location of temporary site buildings, compounds, construction material, and plant storage areas; (h) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process (i) Details of noise mitigation measures (j) Precautionary working methods (to protect hedgehogs and amphibians) Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  4. A watching brief should be followed at all times during demolition and construction works and confirmation of this shall be submitted to the Local Planning Authority. In the event that unidentified contamination is found during the watching brief it must be immediately reported to the Local Planning Authority. Work shall then cease until an investigation and risk assessment, and where required a remediation scheme, have been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required, the proposed development shall not be brought into use until a verification report for the remediation work has been submitted to and approved in writing by the Local Planning Authority. All works shall be undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To minimise the risk from land contamination for the safety of the property’s users.
  5. The mitigation recommendations set out within Section 6 of the Preliminary Ecological Appraisal (March 2023) shall be implemented in full prior to commencement of development and shall be adhered to during the construction phase until the development is complete. Reason: In the interests of protection of wildlife and supporting habitat.
  6. The development shall accord with the Biodiversity Net Gain Assessment, Monitoring and Management Plan (November 2023). This sets out proposed created habitats and net gain assessment, as well as future habitat management which shall be implemented in full within the specified timeframes. Reason: In the interests of providing biodiversity net gain.
  7. The development must accord with the arboricultural report reference CBA11083LLRG v1A. No excavation, demolition or development related works shall commence until the appropriate tree protection measures have been installed as per the tree protection plans contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  8. Prior to development above DPC, details (and samples where requested) of the materials to be used in the construction of the external surfaces (including rainwater goods) of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  9. Note to Applicant: Plan referenced “Elevations As Proposed 5021481 RDG XX XX D B 0010 Rev B” shows proposed signage. Approving these plans as part of this application does not prejudice any future decision on any separate advertisement application.
  10. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.