Council planning record

Two storey rear extension and part conversion of building to create 1no. one bed and 2no. two bed flats with associated cycle parking and landscaping. The first floor office at the front of the building is to be retained within this application.

59 LEIGH ROAD, EASTLEIGH, SO50 9DF

Decided PermitReference: F/23/96368Eastleigh Borough Council

Last published check: 2 Oct 2026, 02:37. Check the council record for more recent changes.

Application location

59 LEIGH ROAD, EASTLEIGH, SO50 9DF

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
6 Nov 2023
Validated
6 Nov 2023
Determination deadline
15 Mar 2024
Local authority
Eastleigh Borough Council

Application overview

Two storey rear extension and part conversion of building to create 1no. one bed and 2no. two bed flats with associated cycle parking and landscaping. The first floor office at the front of the building is to be retained within this application.

Proposal details

Reference
F/23/96368
Alternative references
12520066
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP
Agent
Spruce Town Planning Ltd (Mr Matthew Holmes)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 21 of 21

DocumentPublishedAction
F_23_96368 PL_Final DecisionDecision Notice · PDF13 Mar 2024View
Officer Report F_23_96368Officer Report · PDF13 Mar 2024View
Legal Agreement Receipt 2 Bed ElementLegal Agreement Supporting Info · PDF12 Mar 2024View
Environmental HealthConsultation Response13 Feb 2024View
Noise Impact AssessmentNoise Report · PDF31 Jan 2024View
Natural EnglandConsultation Response10 Jan 2024View
Environmental HealthConsultation Response22 Dec 2023View
Environmental Health (land contamination)Consultation Response · PDF22 Dec 2023View
Ecology OfficerConsultee Response · PDF7 Dec 2023View
Nutrient Budget Calculator6 Dec 2023View
59 Leigh Road HRA6 Dec 2023View
Location and block plan.pdfLocation Plan · PDF6 Nov 2023View
existing floor layouts.pdfFloor Plan · PDF6 Nov 2023View
ApplicationFormRedacted.pdfApplication Form · PDF6 Nov 2023View
existing side elevations.pdfElevations Plan · PDF6 Nov 2023View
Proposed Front and rear elevs.pdfElevations Plan · PDF6 Nov 2023View
proposed site layout.pdfSite Layout Plan · PDF6 Nov 2023View
proposed side elevations.pdfElevations Plan · PDF6 Nov 2023View
indicative roof layout.pdfRoof Plan · PDF6 Nov 2023View
existing front and rear elevations.pdfElevations Plan · PDF6 Nov 2023View
proposed floor layouts.pdfFloor Plan · PDF6 Nov 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_96368 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: P01, P02revB, P03revA, P04revA, P05revB, P06revA, P07, P08 & P09 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No development shall commence until a detailed noise mitigation scheme to address noise arising from the adjacent nursery on the occupants of the approved residential development has been submitted to and approved in writing by the Local Planning Authority. The noise mitigation scheme shall achieve the standards given in the approved report by Impact Acoustics, referenced: IMP7275-3. The development shall not be occupied until the noise mitigation measures (as approved in writing by the Local Planning Authority) have been fully installed and written verification provided to the Local Planning Authority confirming compliance with the approved standards. The approved noise mitigation measures shall thereafter be retained. Reason: To protect the amenity of the approved residential development.
  4. No development shall commence until a scheme for the ventilation of habitable rooms (so as to achieve the internal noise standards of the Local Plan), has been submitted to and approved by the Local Planning Authority. The development shall not be occupied until the approved ventilation scheme shas been implemented and thereafter maintained. Reason: To protect the amenity of the approved residential development.
  5. No development, including demolition, shall take place until the following has been submitted to, and approved in writing by the Local Planning Authority: a) Report of Preliminary Investigation comprising a Desk Study, Conceptual Site Model, and Preliminary Risk Assessment documenting previous and existing land uses of the site and adjacent land b) A site investigation report, documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the desk study c) A detailed site specific scheme for remedial works, and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed, and proposals for future maintenance and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Investigations, assessments and reports are to be undertaken by a competent person and should comply with UK Land contamination risk management (LCRM) national guidance, including BS10175:2011+A2:2017 Investigation of potentially contaminated sites - Code of Practice, and gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665 unless otherwise agreed with the Local Planning Authority. Reason: To protect the residential development from ground contamination.
  6. The development hereby permitted shall not be occupied until there has been submitted to the Local Planning Authority verification by the competent person approved under the provisions of condition 5(c) that any remediation scheme required and approved under the provisions of condition 5(c) has been implemented fully in accordance with the approved details (unless varied with the written permission of the Local Planning Authority in advance of implementation). Unless agreed in writing with the Local Planning Authority such verification shall accord with UK Land contamination risk management (LCRM) national guidance, and the guidance contained in EA Guidance for the Safe Development of Housing on Land Affected by Contamination - R&D Publication 66: 2008. Typically such a report would comprise: a. A description of the site and its background, and summary of relevant site information, b. a description of the remediation objectives and remedial works carried out c. verification data, including - data (sample locations/analytical results, as built drawings of the implemented scheme, photographs of the remediation works in progress, etc. d. Certificates demonstrating that imported and / or material left in situ is free from contamination, and gas / vapour membranes have been installed correctly. Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition 5(c). Reason: To protect the residential development from ground contamination.
  7. No development, above damp proof course, shall commence until details of the cycle and bin storage, tree planting, boundary treatment and external surfacing has been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the approved details have been installed on site and thereafter retained. Reason: In the interests of amenity and promoting sustainable development.
  8. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  9. The proposed windows on the north eastern side elevation and the proposed first floor windows on the south western side elevation (as marked on the approved plans shall be positioned at least 1.7 metres above the floor of the room in which they are installed and thereafter permanently maintained in that condition. No new windows shall be installed on the north eastern side elevation or first floor windows on the south western side elevation unless they are: a) obscure glazed to Pilkingtons level 3 or equivalent with no more than a top-hung opening toplight: OR b) positioned at least 1.7 metres above the floor of the room in which they are installed. Reason: To protect the privacy of the adjoining properties.
  10. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  11. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be contacted. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.