Council planning record

Erection of a two storey 5x bedroom house with integral garage, first floor roof terraces and landscape alterations, following demolition of existing dwelling, as per details of the previously approved Householders Planning Application H/23/94973.

18 CROWSPORT, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4HG

Decided PermitReference: F/23/96301Eastleigh Borough Council

Last published check: 2 Oct 2026, 04:00. Check the council record for more recent changes.

Application location

18 CROWSPORT, HAMBLE-LE-RICE, SOUTHAMPTON, SO31 4HG

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
25 Oct 2023
Validated
1 Nov 2023
Determination deadline
5 Jan 2024
Local authority
Eastleigh Borough Council

Application overview

Erection of a two storey 5x bedroom house with integral garage, first floor roof terraces and landscape alterations, following demolition of existing dwelling, as per details of the previously approved Householders Planning Application H/23/94973.

Proposal details

Reference
F/23/96301
Alternative references
12533564
Ward
Hamble & Netley Ward
Parish
Hamble-le-Rice CP
Agent
Toldfield Architects Ltd (Toldfield Architects Ltd)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 32 of 32

DocumentPublishedAction
F_23_96301 PL_Final DecisionDecision Notice · PDF4 Jan 2024View
F_23_96301 Delegated Officer ReportOfficer Report · PDF2 Jan 2024View
Objection letter on behalf of 22 CrowsportNeighbour Correspondence · PDF28 Nov 2023View
Heritage - 18 CrowsportConsultee Response · PDF21 Nov 2023View
Proposed Ground Floor PlanFloor Plan · PDF1 Nov 2023View
Design and Access StatementDesign And Access Statement · PDF1 Nov 2023View
Design and Access Statement - ContentsDesign And Access Statement · PDF1 Nov 2023View
EA Flood Map for PlanningSupporting Documents · PDF25 Oct 2023View
Location PlanLocation Plan · PDF25 Oct 2023View
Existing Overhead Perspective ViewIllustration · PDF25 Oct 2023View
Proposed Sections AA and BBSection Plan · PDF25 Oct 2023View
Existing North and West ElevationsElevations Plan · PDF25 Oct 2023View
Existing Survey - Plans and ElevationsElevations And Floor Plan · PDF25 Oct 2023View
Sustainable Disposal of Surface WaterSupporting Documents · PDF25 Oct 2023View
Existing Western Contextual Street Scene ElevationsStreet Scene Plan · PDF25 Oct 2023View
Proposed Western Contextual Street Scene ElevationsElevations Plan · PDF25 Oct 2023View
Landscape PlanLandscape Plan · PDF25 Oct 2023View
Existing Site PlanSite Layout Plan · PDF25 Oct 2023View
Site Block PlanBlock Plan · PDF25 Oct 2023View
Existing Ground Floor PlanFloor Plan · PDF25 Oct 2023View
Proposed South and East ElevationsElevations Plan · PDF25 Oct 2023View
Existing South and East ElevationsElevations Plan · PDF25 Oct 2023View
Existing Site Roof PlanRoof Plan · PDF25 Oct 2023View
Proposed First Floor PlanFloor Plan · PDF25 Oct 2023View
Application FormApplication Form · PDF25 Oct 2023View
Arboricultural AssessmentEnvironmental Assessment · PDF25 Oct 2023View
Proposed Northern Contextual Street Scene ElevationsElevations Plan · PDF25 Oct 2023View
Existing Northern Contextual Street Scene ElevationsStreet Scene Plan · PDF25 Oct 2023View
Location PlanLocation Plan · PDF25 Oct 2023View
Proposed Overhead Perspective ViewIllustration · PDF25 Oct 2023View
Proposed North and West ElevationsElevations Plan · PDF25 Oct 2023View
Arboricultural Constraints AssessmentSupporting Documents · PDF31 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_96301 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 221202-P01, 221202-P02, 221202-P03, 221202-P04, 221202-P05, 221202-P06, 221202-P07, 221202-P08, 221202-P09, 221202-P10, 221202-P13, 221202-P14, 221202-P15, 221202-P16, 221202-P17, 221202-P18, 221202-P19, 221202-P20 & 221202-P21. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No development above damp-proof course level shall start until details (and samples where requested) of the following have been submitted to and approved in writing by the Local Planning Authority: a) details of the proposed parapet wall coping and glazing; b) details of rainwater goods and downpipes; c) details of glazing to be used including window frame colour; d) details of the colour and opacity of roof terrace privacy screens; e) details of proposed boundary treatments including the alignment, height and materials of all walls, fences and other means of enclosure; and f) the provision to be made for external lighting. The development shall not be occupied until the approved details have been fully implemented unless agreed in writing by the Local Planning Authority. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  4. No development shall start until details for the sustainable disposal of surface water from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The proposals shall be in line with the drainage strategy submitted in support of the planning application. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of surface water drainage.
  5. No site preparation, demolition or internal strip-out shall commence until a detailed drawn and photographic survey and record of the existing dwelling has been submitted to and approved in writing by the Local Planning Authority. Reason: To provide a record of the original building for the benefit of future scholars.
  6. No construction or demolition work shall start until a Construction Environment Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) a programme and phasing of the demolition and construction work; b) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; c) the arrangements for the routing/ turning of lorries and details for construction traffic access to the site; d) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. e) the parking of vehicles of site operatives and visitors; f) measures to control the emission of dust and dirt generated by demolition and construction; g) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); h) provision for storage, collection, and disposal of rubbish from the development during construction period; i) measures to prevent mud and dust on the highway during demolition and construction; j) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; and k) temporary lighting. Reason: To limit the impact the development has on the amenity of the locality
  7. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  8. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  9. No development above damp-proof course level shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping, including trees and boundary treatments and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  10. For a period of no less than 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenities of the locality.
  11. The development hereby approved shall not be brought into use until the roof terrace screening shown on the approved drawings has been installed. The height of the screens must be at least 1.8 metres above the floor level of the terraces and once installed shall remain in place for the lifetime of the development. Reason: To safeguard the amenity of the neighbouring residents.
  12. All first floor windows on the eastern and southern elevations [as marked on the approved plan] shall be obscure glazed to Pilkingtons level 3 or equivalent with no opening parts less than 1.7 metres above the floor level of the rooms which they serve. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  13. The development hereby permitted shall not be occupied until the parking areas have been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwelling house as a residence. Reason: To make provision for off street parking for the purpose of highway safety.
  14. Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] Order 2015 [or any order revoking and re-enacting that Order with or without modification], no development permitted by Classes A, B, C, D or E of Part 1 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenities of the locality and to maintain a good quality environment.
  15. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  16. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.