Construction of a two bedroom chalet bungalow and garage with parking (Alternative scheme to that already approved under planning permissions F/18/82592 & X/20/89516)
Land to the South of Netley Hill Farm, St John's Road, Hedge End, Southampton, SO30 4DG
Decided PermitReference: F/23/96266Eastleigh Borough Council
Last published check: 2 Oct 2026, 04:44. Check the council record for more recent changes.
Application location
Land to the South of Netley Hill Farm, St John's Road, Hedge End, Southampton, SO30 4DG
This record has no verified map location.
Application summary
Status
Decided Permit
Application type
Full planning
Received
19 Oct 2023
Validated
30 Oct 2023
Determination deadline
9 Feb 2024
Local authority
Eastleigh Borough Council
Application overview
Construction of a two bedroom chalet bungalow and garage with parking (Alternative scheme to that already approved under planning permissions F/18/82592 & X/20/89516)
Proposal details
Reference
F/23/96266
Alternative references
12502624
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Foreman Homes Limited (Mrs Jane Carrington)
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be implemented in accordance with the following plans numbered: 17.096.15.02_P and 17.096.15.SK12_E. Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
No development shall start until details for the sustainable disposal of surface water and disposal of foul sewerage from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details prior to occupation of the development. Reason: To ensure satisfactory provision of foul and surface water drainage.
No development shall start until details of ecological mitigation and enhancement for the site have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To protect and enhance biodiversity.
No site preparation, construction or demolition works shall commence until a Construction Environment Management Plan (CEMP), has been submitted to, and approved in writing by, the Local Planning Authority. All works shall only take place in accordance with the approved details which shall include: a) a programme and phasing of the construction and development works; b) the location and height of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; c) safeguards to be used within the construction process to ensure surface water contains no pollutants on leaving the site; d) safeguards for fuel and chemical storage and use, to ensure no pollution of the surface water leaving the site; e) the arrangements for the routing / turning of lorries and details for construction traffic access to the site; f) the arrangements for deliveries associated with all construction works, loading / unloading of plant & materials and restoration of any damage to the highway [including any vehicle crossovers where applicable]; g) the parking of vehicles of site operatives and visitors; h) the protection of pedestrian routes during construction; i) management measures to control the emission of dust generated by demolition and construction works; j) a scheme, following assessment, for controlling noise and vibration impacts on noise sensitive properties from, site preparation and construction activities (to include details of any piling if proposed); k) provision for storage, collection, and disposal of waste from the development during the demolition and construction period; l) measures to prevent mud and dust on the highway during demolition and construction; m) details of temporary lighting; and n) measures to protect wildlife, including reptiles, hedgehogs and badgers during the construction process. Reason: To limit the impact the development has on the amenity of the locality, neighbouring residents, and biodiversity and hydrology during the demolition and construction process.
The development must accord with the arboricultural report reference J947/01/23 Revision B, dated 24th October 2023. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan reference 'J947.01.23 Revision B'. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
No vegetation clearance shall occur on site during the bird nesting season [between 1st March & 31st August] unless supervised by an appropriately qualified ecologist. Reason: To prevent harm to breeding birds.
No development above damp-proof-course level shall proceed until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping, including trees and boundary treatment, and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
For a period of no less than 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenities of the locality.
The development hereby approved shall be constructed of the materials set out in the approved materials schedule, unless otherwise agreed in writing by the Local Planning Authority. Reason: To ensure a satisfactory visual relationship of the new development.
The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
The development hereby permitted shall not be brought into use until a minimum of two car parking spaces have been provided within the curtilage of the site and thereafter maintained and kept available. Reason: To ensure the adequate provision of on site parking for the purpose of highway safety.
The development hereby permitted shall not be brought into use until a turning space has been provided within the site to enable vehicles to enter and leave in forward gear. The turning space shall subsequently be retained and kept available for such purposes at all times. Reason: In the interests of highway safety.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.