Council planning record

Erect a single storey children's nursery with off road car parking (revised scheme)

Land adjacent to Boorley Park Primary School,, Botley, SO32 2SH

Decided PermitReference: F/23/96256Eastleigh Borough Council

Last published check: 2 Oct 2026, 09:27. Check the council record for more recent changes.

Application location

Land adjacent to Boorley Park Primary School,, Botley, SO32 2SH

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
17 Oct 2023
Validated
19 Oct 2023
Determination deadline
9 Feb 2024
Local authority
Eastleigh Borough Council

Application overview

Erect a single storey children's nursery with off road car parking (revised scheme)

Proposal details

Reference
F/23/96256
Alternative references
12538050
Ward
Botley Ward
Parish
Botley CP
Agent
Mr Darryl Howells

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 40 of 40

DocumentPublishedAction
Discharge of conditions 9 10 15 and 16 181225Discharge Of Conditions Decision Notice · PDF18 Dec 2025View
Boorley Nursery discharge of Conditions 4 and 5 280125Decision · PDF28 Jan 2025View
Boorley Nursery discharge of Conditions 6 and 7 181224Decision · PDF18 Dec 2024View
F_23_96256 PL_Final DecisionDecision Notice · PDF9 Feb 2024View
Committee Reports 5 Feb 24 Hedge End West End and Botley Local Area Committee · PDF8 Feb 2024View
Ecology response 24 1 24 for F 23 96256 Land adjacent to Boorley Park Primary School, Botley,Consultee Response · PDF24 Jan 2024View
Biodiversity metric calculation_RedactedEcological Assessment · PDF18 Jan 2024View
Further Flood Authority comments Boorley nurseryConsultation Response · PDF12 Jan 2024View
Further Landscape Officer commentsConsultation Response · PDF12 Jan 2024View
Contaminated land comments re radon gasConsultation Response · PDF10 Jan 2024View
Highway Authority response December 2023Consultation Response · PDF13 Dec 2023View
Information on outdoor play provision · PDF30 Nov 2023View
Updated Landscaping PlanLandscape Plan · PDF30 Nov 2023View
Updated Vehicle Tracking PlansPlan · PDF30 Nov 2023View
Proposed Site Plan Revision J · PDF30 Nov 2023View
Drainage Strategy Revision A_Redacted · PDF30 Nov 2023View
HCC Flood and Water Response_RedactedConsultee Response · PDF9 Nov 2023View
Curdridge Parish Council commentsConsultation Response · PDF9 Nov 2023View
Southern Water mapConsultation Response · PDF9 Nov 2023View
Southern Water commentsConsultation Response · PDF9 Nov 2023View
Highway responseConsultation Response · PDF8 Nov 2023View
Landscape Officer commentsConsultation Response · PDF1 Nov 2023View
Flood Risk and Drainage ReportDrainage Report · PDF1 Nov 2023View
Preliminary Ecological Appraisal Report (PEAR)Ecological Assessment · PDF1 Nov 2023View
Ecology response 25 10 23Consultation Response · PDF1 Nov 2023View
Urban Design commentsConsultation Response · PDF26 Oct 2023View
Tree Officer commentsConsultation Response · PDF26 Oct 2023View
Southampton Airport commentsConsultation Response · PDF25 Oct 2023View
3D image entrancePhotographs · PDF18 Oct 2023View
3D imagePhotographs · PDF18 Oct 2023View
Landscape planPlan · PDF18 Oct 2023View
Proposed ElevationsElevations Plan · PDF18 Oct 2023View
3D image pedestrian approachPhotographs · PDF18 Oct 2023View
block planBlock Plan · PDF18 Oct 2023View
Location planLocation Plan · PDF18 Oct 2023View
Floor planFloor Plan · PDF18 Oct 2023View
proposed site planSite Layout Plan · PDF18 Oct 2023View
Planning, Design and Access Statement v6.pdfPlanning Statement · PDF17 Oct 2023View
Merged Plans.pdf · PDF17 Oct 2023View
ApplicationFormRedacted.pdf · PDF17 Oct 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Discharge of conditions 9 10 15 and 16 181225 Boorley Nursery discharge of Conditions 4 and 5 280125 Boorley Nursery discharge of Conditions 6 and 7 181224 F_23_96256 PL_Final Decision
Planning conditions
  1. Implementation timeframe The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. Approved plans The development hereby permitted shall be implemented in accordance with the following plans numbered: • 1980-00-01 (Location Plan) • 1980-00-02 Revision B (Block Plan) • 1980-00-06 Revision I (Proposed Elevations) • 1980-00-03 Revision J (Proposed Site Plan) • 1980-00-05 Revision G (Proposed Floor Plan) • 1980-00-04 Revision C (Proposed Site Plans with Vehicle Access) • 002 (Landscape Plan) Reason: For the avoidance of doubt and in the interests of proper planning.
  3. CEMP No development shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Planning Authority, which shall include: (a) A programme and methods of construction work; (b) The provision of long term facilities for contractor parking; (c) The arrangements for deliveries associated with all construction works, with special regard to school timings; (e) Access and egress for plant and machinery; (f) Protection of pedestrian routes during construction; (g) Location of temporary site buildings, compounds, construction material, and plant storage areas; (h) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process; (i) Precautionary working methods for protected species as outlined in the ‘Preliminary Ecological Appraisal Report’, KJF Consultancy Ltd, ref. PEAR.L.A.BPPS.NR.B Version 2, dated 02.10.23. Construction work shall only take place in accordance with the approved CEMP. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality and to ensure protected species are not harmed.
  4. Drainage No development shall start on site until a detailed surface water drainage scheme for the site, based on the principles set out within the Flood Risk Assessment and Surface Water Drainage Strategy Revision A (Aegaea, ref. AEG02758_S032_Botley_07), has been submitted to and approved in writing by the Local Planning Authority. The submitted details shall include: a. A technical summary highlighting any changes to the design from that within the approved Flood Risk Assessment. b. Detailed drainage plans to include type, layout and dimensions of drainage features including references to link to the drainage calculations. c. Detailed drainage calculations to demonstrate existing runoff rates are not exceeded and there is sufficient attenuation for storm events up to and including 1:100 + climate change. d. Confirmation that sufficient water quality measures have been included to satisfy the methodology in the Ciria SuDS Manual C753 particularly in relation to the proprietary treatment device. e. Exceedance plans demonstrating the flow paths and areas of ponding in the event of blockages or storms exceeding design criteria. Reason: To ensure suitable drainage to prevent flood risk, in accordance with Policy DM6 of the Eastleigh Borough Local Plan (2016-2036).
  5. Drainage maintenance Prior to first occupation of the development hereby permitted, details for the long term maintenance arrangements for the surface water drainage system shall be submitted to and approved in writing by the Local Planning Authority. The details shall include: a. Maintenance schedules for each drainage feature type and ownership; b. Details of protection measures. The drainage system shall thereafter be maintained in accordance with the approved details. Reason: To ensure long term management of the drainage system to protect against flood risk, in accordance with Policy DM6 of the Eastleigh Borough Local Plan (2016-2036).
  6. Gas remediation No development shall commence comprising the construction of the sub-structure for the building until details have been submitted to and approved in writing by the Local Planning Authority of a site-specific ground gas remediation scheme designed to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment. The Scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and a verification plan outlining details of the data to be collected in order to demonstrate the completion of the remediation works and any arrangements for the continued monitoring of identified contaminant linkages. Site works and the collection data submitted shall be in accordance with the approved scheme and shall be undertaken by a competent person. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risk to workers, neighbours and other off-site receptors, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  7. Materials Prior to any works above foundation / slab level, full details of the materials to be used in the external surfaces of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be constructed in accordance with the approved details. Reason: To achieve a high quality appearance in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  8. Boundary treatment Prior to first occupation of the development hereby approved, all boundary treatments shall be installed in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority. The boundary treatments shall thereafter be retained in accordance with the approved details. Reason: In the interest of visual amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  9. External lighting Prior to installation of any external lighting, full details to include lighting positions and luminance levels, shall be submitted to and approved in writing by the Local Planning Authority. Reason: In the interest of visual and residential amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  10. Vehicle drop off and delivery management plan Prior to occupation of the development hereby permitted, a ‘Drop Off and Delivery Management Plan’, outlining restrictions / alternative access arrangements during peak school drop off and pick up times, shall be submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority. Reason: In the interests of highway safety, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  11. Parking provision Prior to first occupation of the development hereby permitted, provision for parking shall be made within the site in accordance with the approved plans and thereafter retained. Reason: To ensure adequate on-site car parking provision for the approved development, in accordance with Policy DM14 of the Eastleigh Borough Local Plan (2016-2036).
  12. Ecological mitigation The development shall be carried out in accordance with the ecological mitigation and enhancement measures outlined within Section 7 of the ‘Preliminary Ecological Appraisal Report’, KJF Consultancy Ltd, ref. PEAR.L.A.BPPS.NR.B Version 2, dated 02.10.23, unless alternative details are first submitted to and approved in writing by the Local Planning Authority. Reason: To ensure that the development will not harm protected species, and to achieve biodiversity enhancement, in accordance with policy DM11 of the Eastleigh Borough Local Plan (2016-2036) and the Wildlife and Countryside Act 1981 (as amended).
  13. Landscape scheme (a) Notwithstanding the details shown on Plan ref. 002, no development above foundation / slab level shall take place until a final Landscape Plan has been submitted to and approved in writing by the Local Planning Authority, to include additional enhancements for biodiversity; (b) The approved landscaping scheme shall be carried out in the first planting season following occupation of the development, or completion of development (whichever is sooner), unless alternative details are first submitted to and approved in writing by the Local Planning Authority. (c) If, within a period of 10 years after planting, any tree or plant is removed, dies or becomes, in the opinion of the Local Planning Authority, seriously damaged, defective or diseased, another tree or plant of the same species and size as that originally approved shall be planted at the same place within the next planting season, unless the Local Planning Authority gives its written consent to any variation. Reason: To achieve a high quality development, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  14. Use restriction Notwithstanding the provisions of Schedule 2, Part A of the Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, the building hereby permitted shall be occupied as a children’s day nursery under Class E(f) only. Reason: To secure a use appropriate for the location and to ensure that any alternative use can be fully assessed in terms of impacts on the surrounding area, in accordance with Policies DM1, DM8 and DM13 of the Eastleigh Borough Local Plan (2016-2036).
  15. Plant and equipment details Prior to the installation of any fixed plant or equipment, full details including any necessary mitigation measures to ensure noise limits are at least 10dB below background noise levels, shall be submitted to and approved in writing by the Local Planning Authority. Reason: To protect the amenity of neighbouring residents from noise impacts, in accordance with Policies DM1 and DM8 of the Eastleigh Borough Local Plan (2016-2036).
  16. Cycle and refuse storage Prior to first occupation of the development hereby permitted, cycle and refuse storage facilities shall be provided in the location shown on the approved plans, in accordance with full details (elevations, floorplans), that have first been submitted to and approved in writing by the Local Planning Authority. The refuse and cycle storage facilities shall thereafter be retained for cycle and refuse storage purposes only. Reason: In the interest of amenity and to encourage alternative means of transport to the private car, in accordance with Policies DM1 and DM13 of the Eastleigh Borough Local Plan (2016-2036).
  17. Capacity The nursery hereby permitted shall accommodate a maximum of 81 children. Reason: To ensure that the capacity remains at that which has been assessed as acceptable in terms of amenity and traffic impacts, in accordance with Policies DM1 and DM13 of the Eastleigh Borough Local Plan (2016-2036).
  18. Note to applicant: A S278 Agreement will be required for the access works. Details of this process can be found via the following web address, and it is recommended that the applicants engage in the process at their earliest convenience. https://www.hants.gov.uk/transport/developers/section-278
  19. Note to applicant: A formal application is required for connection to the foul sewer and water supply. Please visit Southern Water’s Get Connected Service: Home (southernwater.co.uk) and read the documents available at: Connection charging arrangements (southernwater.co.uk) For further advice regarding SuDS adoption, please see Southern Water’s response dated 9 November 2023.
  20. Note to applicant: For Condition 13, please refer to the advice of the Council’s Landscape Officer and Ecologist, as detailed in their comments dated 12 January 2024 and 24 January 2024.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.