Council planning record

Change of use from Class B8 and/or Class E (g)(iii) with ancillary offices, to a flexible use including Class E(g), Class B2 and Class B8. Replacement of 2.no loading bays with sectional shutter doors and other alterations to the fenestration. External storage compound. External works and alterations including plant and landscaping.

Unit One, Strategic Park, Southampton, SO30 4DA

Decided PermitReference: F/23/96253Eastleigh Borough Council

Last published check: 2 Oct 2026, 02:36. Check the council record for more recent changes.

Application location

Unit One, Strategic Park, Southampton, SO30 4DA

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
17 Oct 2023
Validated
6 Nov 2023
Determination deadline
28 Feb 2024
Local authority
Eastleigh Borough Council

Application overview

Change of use from Class B8 and/or Class E (g)(iii) with ancillary offices, to a flexible use including Class E(g), Class B2 and Class B8. Replacement of 2.no loading bays with sectional shutter doors and other alterations to the fenestration. External storage compound. External works and alterations including plant and landscaping.

Proposal details

Reference
F/23/96253
Alternative references
12532048
Ward
Hedge End South Ward
Parish
Hedge End CP
Agent
Fellows Planning Limited (Mrs Natalie Fellows)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 41 of 41

DocumentPublishedAction
F_23_96253 PL_Final DecisionDecision Notice · PDF27 Feb 2024View
F_23_96253 Delegated Officer ReportOfficer Report · PDF27 Feb 2024View
Odour Technical Assessment Combined V0.1_RedactedSupporting Documents · PDF21 Feb 2024View
SUPERSEDED Odour Technical Note RedactedSupporting Documents · PDF20 Feb 2024View
Environmental Health updateConsultation Response · PDF14 Feb 2024View
Noise AssessmentNoise Report · PDF25 Jan 2024View
Proposed Floor PlansFloor Plan · PDF25 Jan 2024View
Noise Management PlanSupporting Documents · PDF25 Jan 2024View
Proposed Site LayoutSite Layout Plan · PDF25 Jan 2024View
External Plant Detail Sheet 2Supporting Documents · PDF25 Jan 2024View
Proposed ElevationsElevations Plan · PDF25 Jan 2024View
External Plant Detail Sheet 3Supporting Documents · PDF25 Jan 2024View
External Plant Details Sheet 1Supporting Documents · PDF25 Jan 2024View
Additional Ecology response for F 23 96253 Unit One, Strategic Park, SouthamptonConsultee Response · PDF19 Dec 2023View
Ecological Impact AssessmentSupporting Documents · PDF18 Dec 2023View
Southampton AirportConsultation Response · PDF14 Dec 2023View
Hampshire HighwaysConsultation Response · PDF1 Dec 2023View
Ecology response for F 23 96253 Unit One, Strategic Park, SouthamptonConsultee Response · PDF23 Nov 2023View
Planning PolicyConsultation Response22 Nov 2023View
Environmental HealthConsultation Response · PDF21 Nov 2023View
ParishConsultation Response · PDF20 Nov 2023View
Tree OfficerConsultation Response · PDF16 Nov 2023View
Planning StatementPlanning Statement · PDF6 Nov 2023View
Location planLocation Plan · PDF6 Nov 2023View
SUPERSEDED Noise Management PlanNoise Report · PDF6 Nov 2023View
Block PlanBlock Plan · PDF6 Nov 2023View
SUPERSEDED Noise Assessment · PDF6 Nov 2023View
SUPERSEDED External Plant DetailsReport - Other · PDF6 Nov 2023View
Trip Generation Technical NoteTransport Assessment · PDF6 Nov 2023View
strategic park letter Unit 1 0.3 · PDF30 Oct 2023View
SUPERSEDED Proposed Floor PlansFloor Plan · PDF17 Oct 2023View
SUPERSEDED Proposed Site LayoutSite Layout Plan · PDF17 Oct 2023View
SUPERSEDED Proposed ElevationsElevations Plan · PDF17 Oct 2023View
Site Habitats PlanPlan · PDF17 Oct 2023View
Biodiversity Enhancement PlanPlan · PDF17 Oct 2023View
Existing Floor PlansFloor Plan · PDF17 Oct 2023View
Boundary Treatments PlanPlan · PDF17 Oct 2023View
Storage Container Plans and ElevationsElevations Plan · PDF17 Oct 2023View
Existing ElevationsElevations Plan · PDF17 Oct 2023View
Existing Site Layout-Roof PlanSite Layout Plan · PDF17 Oct 2023View
Application Form RedactedApplication Form · PDF17 Oct 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_96253 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 230010-A-PL-001-Rev C, 230010-A-PL-002-Rev C, 230010-A-PL-005-Rev C, 230010-A-PL-006-Rev A, 230010-A-PL-007-Rev A, 230010-A-PL-010-Rev E, 230010-A-PL-011-Rev D, 230010-A-PL-015-Rev E, 230010-A-PL-016-Rev C, 230010-A-PL-018-Rev C, 230010-A-PL-019-Rev A, 230010-A-PL-020-Rev C, 230010-A-PL-021-Rev A, and 230010-A-PL-022 Rev A. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by demolition and construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise and vibration from demolition and construction activities [including details of any piling]; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]; d) measures to protect any wildlife that might be using the site or the adjacent woodland. Reason: To limit the impact the development has on the amenity of the locality
  4. Prior to commencement of works, a breeding bird check shall be carried out by a suitably qualified ecologist. If any nesting materials or nesting birds are found, work must stop, and a 5 m buffer established to protect the nest from disturbance until after the young have fledged and left the nest. Reason: To ensure breeding birds are not harmed or disturbed during construction
  5. Prior to first occupation of the development hereby permitted, the acoustic fencing shall be implemented in accordance with plan referenced: Boundary Treatments Plan (230010-A-PL-018-Rev C). The acoustic fencing shall be retained for the lifetime of the development. Reason: To protect the amenities of the neighbouring residential properties.
  6. The information supplied within the Odour Technical Assessment (20th February 2024 V1), Noise Assessment (R10262-1 Rev 3) and Noise Management Plan (R10262-2 Rev 3) hereby approved shall be accorded to in full when occupied by F50 League GB Ltd (also known as ‘Sail GP’). Any variation to this shall be submitted to and approved in writing by the Local Planning Authority. Reason: to protect the local amenity and in accordance with policy DM8 of the Eastleigh Local Plan (2016-2036)
  7. The submitted and approved Biodiversity Enhancement Plan (230010-A-PL-017-Rev C) and Ecological Impact Assessment (GS255.Unit1StrategicParkEcIA.v1) shall be accorded to in full with all recommended ecological enhancements (section 8) implemented. Reason: To ensure a suitable biodiversity enhancement in accordance with policy DM11 of the Eastleigh Local Plan (2016-2036)
  8. The development hereby approved shall be used only for the purposes of office, research & development, industrial processes, general industrial, and storage and distribution (Classes E(g), B2 and B8) use of the Schedule to the Town and Country Planning [Use Classes] Order 1987 and The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, [or in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification] and for no other purposes unless otherwise agreed in writing by the Local Planning Authority. Reason: In the interests of highway safety and local amenity.
  9. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the neighbouring residential properties.
  10. Notwithstanding the use hereby approved, any new use that comes forward under a B2 occupation (except for the occupier F50 League GB Ltd (also known as ‘Sail GP’) given these details have been already provided) shall submit a noise management strategy prior to first occupation. This shall include matters such as the nature of activities/operations taking place (internally and externally), operating hours, nature/times/frequency of deliveries (and other related vehicle movement) and any other potential noise generating sources/activities. Reason: To ensure suitable noise management is applied for the lifetime of the unit, in accordance with policy DM8 of the Eastleigh Local Plan (2016-2036)
  11. Note to Applicant: In the event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works.
  12. Note to Applicant: Proposed fencing, with the exception of acoustic fencing, shall have openings at ground level (13x 13 cm minimum) to allow the free passage of small animals.
  13. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (Dec 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.