Council planning record

Change of use of land to Agricultural with associated works including, engineering works to land to raise ground levels to allow erection of 2.no poly-tunnels and 1.no outbuilding.

Land at South Side of , Heath House Lane, Hedge End

Decided PermitReference: F/23/95872Eastleigh Borough Council

Last published check: 3 Oct 2026, 13:26. Check the council record for more recent changes.

Application location

Land at South Side of , Heath House Lane, Hedge End

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
22 Aug 2023
Validated
22 Aug 2023
Determination deadline
11 Jul 2024
Local authority
Eastleigh Borough Council

Application overview

Change of use of land to Agricultural with associated works including, engineering works to land to raise ground levels to allow erection of 2.no poly-tunnels and 1.no outbuilding.

Proposal details

Reference
F/23/95872
Alternative references
12394028
Ward
Bursledon & Hound North Ward
Parish
Hedge End CP
Agent
Kode Architecture (Mr Rob Wiles)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 38 of 38

DocumentPublishedAction
F_23_95872 PL_Final DecisionDecision Notice · PDF11 Jul 2024View
F_23_95872 Delegated Officer ReportOfficer Report · PDF11 Jul 2024View
Hampshire HighwaysConsultation Response · PDF2 Jul 2024View
PROPOSED SITE LAYOUT PLANSite Layout Plan · PDF1 Jul 2024View
Hampshire HighwaysConsultation Response · PDF27 Jun 2024View
Trees updateConsultation Response · PDF25 Jun 2024View
Arboricultural Report_RedactedTree Info · PDF19 Jun 2024View
SUPERSEDED PROPOSED SITE LAYOUT PLANSite Layout Plan · PDF18 Jun 2024View
Ecology response 18 6 24 for F 23 95872 Land at South Side of Heath House Lane, Hedge EndConsultee Response · PDF18 Jun 2024View
SUPERSEDED Proposed Site LayoutSite Layout Plan · PDF13 Jun 2024View
SITE SECTION AASection Plan · PDF13 Jun 2024View
Biodiversity Mitigation and Enhancement Plan_RedactedSupporting Documents · PDF13 Jun 2024View
Construction Environmental Management Plan_RedactedSupporting Documents · PDF13 Jun 2024View
Ecological Impact Assessment (1)_RedactedEcological Assessment · PDF13 Jun 2024View
Ecology response 6 6 24 for F 23 95872 Land at South Side of Heath House Lane, Hedge EndConsultee Response · PDF6 Jun 2024View
PROPOSED OUTBUILDINGSElevations And Floor Plan · PDF4 Jun 2024View
SUPERSEDED PROPOSED SITE LAYOUT PLANSite Layout Plan · PDF4 Jun 2024View
SUPERSEDED SITE SECTION AASection Plan · PDF4 Jun 2024View
PROPOSED POLYTUNNELElevations And Floor Plan · PDF4 Jun 2024View
SUPERSEDED Ecological Impact Assessment_RedactedEcological Assessment · PDF2 Apr 2024View
Ecology response amended for F 23 95872 Land at South Side of Heath House Lane, Hedge EndConsultee Response · PDF2 Apr 2024View
Natural England responseConsultation Response · PDF26 Sept 2023View
ParishConsultation Response · PDF25 Sept 2023View
Hampshire HighwaysConsultation Response · PDF20 Sept 2023View
Tree OfficerConsultation Response · PDF20 Sept 2023View
Ecology response for F 23 95872 Land at South Side of Heath House Lane, Hedge EndConsultee Response · PDF12 Sept 2023View
Contamined LandConsultation Response · PDF8 Sept 2023View
SUPERSEDED KA 2023 J29 A105 PROPOSED OUTBUILDINGS.pdfElevations Plan · PDF22 Aug 2023View
KA 2023 J29 DAS.pdfDesign And Access Statement · PDF22 Aug 2023View
SUPERSEDED KA 2023 J29 A106 BLOCK PLAN IN CONTEXT.pdfBlock Plan · PDF22 Aug 2023View
SUPERSEDED KA 2023 J29 A200 SITE SECTION AA.pdfSection Plan · PDF22 Aug 2023View
SUPERSEDED KA 2023 J29 A103 PROPOSED SITE LAYOUT PLAN.pdfSite Layout Plan · PDF22 Aug 2023View
KA 2023 J29 A101 EXISTING SITE LAYOUT PLAN.pdfSite Layout Plan · PDF22 Aug 2023View
ApplicationFormRedacted.pdfApplication Form · PDF22 Aug 2023View
SUPERSEDED KA 2023 J29 A104 PROPOSED POLYTUNNEL.pdfPlan · PDF22 Aug 2023View
KA 2023 J29 A100 EXISTING LOCATION PLAN.pdfLocation Plan · PDF22 Aug 2023View
KA 2023 J29 A102 PROPOSED LOCATION PLAN.pdfLocation Plan · PDF22 Aug 2023View
Annex A to NE ResponseConsultation Response · PDF3 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_95872 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: KA/2023/J29A100, KA/2023/J29A101, KA/2023/J29A102, KA/2023/J29A103 Rev E, KA/2023/J29A104 Rev A, KA/2023/J29A105 Rev A, and KA/2023/J29A200 Rev B Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No construction or site preparation works involving excavation shall start until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Preparation and construction work shall only take place in accordance with the approved document which shall include: a) the location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); f) provision for storage, collection, and disposal of rubbish from the development during construction period; g) measures to prevent mud and dust on the highway during demolition and construction; h) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; i) temporary lighting; j) protection of pedestrian routes during construction; k) temporary surface water drainage provisions; and l) hours of working Reason: To limit the impact the development has on the amenity of the locality and to protect biodiversity
  4. No development, including demolition, shall take place until the following has been submitted to, and approved in writing by the Local Planning Authority: a. A Report of Preliminary Investigation comprising a Desk Study, Conceptual Site Model, and Preliminary Risk Assessment documenting previous and existing land uses of the site and adjacent land in accordance with UK Land contamination risk management (LCRM) national guidance, and BS10175:2011 Code of Practice; b. If required, a report of a site investigation documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the Preliminary Investigation and in accordance with BS10175:2011, BS 8576:2013, BS 8485:2015+A1:2019, Claire RB17, CIRIA C665; c. If required, a detailed site-specific scheme for remedial works and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed and proposals for future maintenance and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Reason: To minimise the risk from land contamination for the safety of the future users of the development.
  5. The development must accord with the arboricultural report reference TH 4668. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  6. The development hereby permitted shall not be occupied / brought into use until there has been submitted to the LPA verification by the competent person approved under the provisions of condition 4(c) that any remediation scheme required and approved under the provisions of condition 4(c) has been implemented fully in accordance with the approved details (unless varied with the written permission of the LPA in advance of implementation). Unless agreed in writing with the LPA such verification shall accord with UK Land contamination risk management (LCRM) national guidance. Typically such a report would comprise: a. A description of the site and its background, and summary of relevant site information, b. a description of the remediation objectives and remedial works carried out c. verification data, including - data (sample locations/analytical results, as built drawings of the implemented scheme, photographs of the remediation works in progress, etc. d. Certificates demonstrating that imported and / or material left in situ is free from contamination, gas / vapour membranes have been installed correctly Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition 4(c)” Reason: To minimise the risk from land contamination for the safety of the future users of the development.
  7. The submitted and approved Construction Environmental Management Plan (CEMP), referenced AE/5162, shall be accorded to in full throughout the construction process and as necessary thereafter in accordance with the agreed haybale bund provision. Reason: To limit the impact the development has on the amenity of the locality
  8. The submitted and approved Biodiversity Mitigation Enhancement Plan (BMEP), referenced 5690 June 2024, and Ecological Impact Assessment (EcIA), referenced 5690 March 2024, shall be accorded to in full. This is to include section 6 (Assessment of the Effects and Proposal Measures) of the EcIA which details mitigations and section 4 (Enhancements) of the BMEP. One year after completion of works, photos that were taken as part of the BMEP (section 5) shall be submitted to and approved in writing by the Local Planning Authority. Reason: To ensure suitable biodiversity enhancement and habitat protection, in accordance with policy DM11 of the Eastleigh Borough Local Plan (2016-2036)
  9. Before use of the development is commenced the access, including the footway and/or verge crossing shall be constructed and lines of sight of 2.4 metres by 48.0 metres provided in accordance with the approved plans. The lines of sight splays shown on the approved plans shall be kept free of any obstruction exceeding 0.6 metre in height above the adjacent carriageway and shall be subsequently maintained so thereafter. Reason: To provide satisfactory access and in the interests of highway safety.
  10. Before use of the development is commenced provision for parking and the driveway area utilised to access this and turn on site shall have been made within the site in accordance with the approved plans (drawing KA/2023/J29A103 Rev E) and shall be retained thereafter. Reason: To ensure adequate on-site car parking provision for the approved development.
  11. Any gates provided shall be set back a distance of 8.0m from the edge of the carriageway of the adjoining highway. Reason: In the interests of highway safety.
  12. The development hereby approved shall only be used for the purposes of growing flowers and wholesale/trade distribution of flowers and shall not be open to the general public. Reason: To ensure trip rates and parking provision is managed on site, in the interest of public amenity and highway safety.
  13. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (Dec 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.