Temporary permission for the site compound area (for the replacement of Weardale Road bridge). The compound shall comprise: containers for site offices and welfare, toilet facilities, car parking area, and area for storage of plant/equipment/materials.

Area of green land on Steele Close, Chandlers Ford, Hampshire - opposite the rear car park to the fire station.,

Decided Temporarily ApproveReference: F/23/95855Eastleigh Borough Council

Last published check: 2 Oct 2026, 04:43. Check the council record for more recent changes.

Application location

Area of green land on Steele Close, Chandlers Ford, Hampshire - opposite the rear car park to the fire station.,

This record has no verified map location.

Application summary

Status
Decided Temporarily Approve
Application type
Full planning
Received
16 Aug 2023
Validated
30 Oct 2023
Determination deadline
25 Dec 2023
Local authority
Eastleigh Borough Council

Application overview

Temporary permission for the site compound area (for the replacement of Weardale Road bridge). The compound shall comprise: containers for site offices and welfare, toilet facilities, car parking area, and area for storage of plant/equipment/materials.

Proposal details

Reference
F/23/95855
Alternative references
12387621
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
Mr Lee Jenkins-Hewes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
F_23_95855 PL_Final DecisionDecision Notice · PDF8 Dec 2023View
F-23-95855 Area of green land on Steele CloseOfficer Report · PDF8 Dec 2023View
SITE COMPOUND 2of2 S2Site Layout Plan · PDF30 Oct 2023View
EBC Planning Statement v2.0Planning Statement · PDF30 Oct 2023View
Compound PlanPlan · PDF30 Oct 2023View
SITE COMPOUND 1of2 S2Site Layout Plan · PDF30 Oct 2023View
SITE COMPOUNDSite Layout Plan · PDF19 Oct 2023View
B1339 Flood Risk AssessmentFlood Risk Assessment · PDF2 Oct 2023View
Compound PlanPlan · PDF2 Oct 2023View
EBC Planning Statement.docxPlanning Statement16 Aug 2023View
ApplicationFormRedacted.pdfApplication Form · PDF16 Aug 2023View
Location Plan - Site Compound LocationLocation Plan · PDF18 Jan 2022View
SITE COMPOUND LOCATIONPlan · PDF18 Jan 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Temporarily Approve
F_23_95855 PL_Final Decision
Planning conditions
  1. The compound and associated structures hereby permitted shall be for a limited period expiring on 31 December 2024. On or before this date the compound and any associated materials and equipment shall be removed from the site and the land shall be restored to its former use and condition. Reason: The development is of a type not considered suitable for permanent retention and in the interests of amenity.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: • SITE COMPOUND LOCATION CJ253013-ECS-SBR-B1339-DE-S-1715 (Rev P06) • SITE COMPOUND DETAILS CJ253013-HES-SBR-B1339 -SK-S-0003 (Rev P0.1) • SITE COMPOUND – DETAILS SHEET 2 OF 2 CJ253013-HES-SBR-B1339 -SK-S-0003 (Rev P01) • SITE COMPOUND – DETAILS SHEET 2 OF 2 CJ253013-HES-SBR-B1339 -SK-S-0004 (Rev P01) Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The site compound and any associated works, including placement of goods, chemicals, fuels, soil or other materials, shall take place outside of the calculated Root Protection Areas – defined as a distance of 12 times the diameter of the stem (as measured at 1.5m) – of any tree. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  4. In the event any external lighting is required for safety or security purposes, this shall be positioned so as to prevent any direct light source being visible from the public realm and to ensure minimal light spillage outside the compound area. Reason: In the interests of amenity and to protect bats.
  5. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
  6. Note to Applicant: Should any tree works be required, this should be undertaken outside of bird nesting season (March-August). If this is not possible, pre-work checks for nesting birds should be undertaken by an Ecologist and precautionary measures implemented.
  7. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.