Council planning record

Creation of 3.no flats, including two storey and single storey extensions, and parking, cycle and refuse storage.

54 LEIGH ROAD, EASTLEIGH, SO50 9DT

Decided PermitReference: F/23/95592Eastleigh Borough Council

Last published check: 3 Oct 2026, 21:47. Check the council record for more recent changes.

Application location

54 LEIGH ROAD, EASTLEIGH, SO50 9DT

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
10 Jul 2023
Validated
10 Jul 2023
Determination deadline
19 Jan 2024
Local authority
Eastleigh Borough Council

Application overview

Creation of 3.no flats, including two storey and single storey extensions, and parking, cycle and refuse storage.

Proposal details

Reference
F/23/95592
Alternative references
12293392
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP
Agent
Mrs Caroline Everett

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 22 of 22

DocumentPublishedAction
F_23_95592 PL_Final DecisionDecision Notice · PDF17 Jan 2024View
F-23-95592 54 Leigh Road - Officer ReportOfficer Report · PDF17 Jan 2024View
Legal Agreement Receipt 95592 · PDF16 Jan 2024View
P22-064-01-02-001 - Proposed Site PlanPlan · PDF13 Nov 2023View
F.23.95592 54 LEIGH ROAD, EASTLEIGH, SO50 9DT Ecology responseConsultee Response · PDF10 Nov 2023View
P22-064-01-05-001 - Proposed ElevationsPlan · PDF3 Nov 2023View
P22-064-01-05-002 - Proposed ElevationsPlan · PDF3 Nov 2023View
P22-064-01-03-001 - Proposed Floor PlansPlan · PDF3 Nov 2023View
Additional Ecology response 14 9 23 F 23 95592 54 LEIGH ROAD, EASTLEIGH, SO50 9DTConsultee Response · PDF14 Sept 2023View
DSA000026113Consultee Response · PDF29 Aug 2023View
Response_F-23-95592Consultee Response · PDF9 Aug 2023View
F 23 95592 54 LEIGH ROAD, EASTLEIGH, SO50 9DTConsultee Response · PDF7 Aug 2023View
Existing Site PlanSite Layout Plan · PDF10 Jul 2023View
-Proposed ElevationsElevations Plan · PDF10 Jul 2023View
-Existing Elevations PlansElevations Plan · PDF10 Jul 2023View
Proposed Site PlanSite Layout Plan · PDF10 Jul 2023View
Application Form RedactedApplication Form · PDF10 Jul 2023View
Existing Floor and Roof PlansPlans · PDF10 Jul 2023View
Proposed Floor PlansFloor Plan · PDF10 Jul 2023View
P22-064-Design and Access Statement.pdfSupporting Documents · PDF10 Jul 2023View
Proposed Elevations PlansElevations Plan · PDF10 Jul 2023View
Proposed Bike Store PlansPlan · PDF10 Jul 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_95592 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: • Proposed Site Plan P22-064 01-02-001 • Proposed Floor Plans P22-064 01-03-001 • Proposed Elevations P22-064 01-05-001 • Proposed Elevations P22-064 01-05-002 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. No development shall commence on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: (a) Location of construction materials, and plant storage areas used during demolition and construction; (b) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. (c) The parking of vehicles of site operatives and visitors; (d) A scheme for controlling noise and vibration from demolition and construction activities; (e) Provision for storage, collection, and disposal of rubbish from the development during construction period; (f) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; and (g) protection of pedestrian routes. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  4. No development, including demolition, shall take place until the following has been submitted to, and approved in writing by the Local Planning Authority: a) Report of Preliminary Investigation comprising a Desk Study, Conceptual Site Model, and Preliminary Risk Assessment documenting previous and existing land uses of the site and adjacent land b) A site investigation report, documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the desk study c) A detailed site specific scheme for remedial works, and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed, and proposals for future maintenance and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Investigations, assessments and reports are to be undertaken by a competent person and should comply with UK Land contamination risk management (LCRM) national guidance, including BS10175:2011+A2:2017 Investigation of potentially contaminated sites - Code of Practice, and gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665 unless otherwise agreed with the Local Planning Authority. Reason: To minimise the risk from land contamination for the safety of the future occupiers of the development.
  5. The development hereby permitted shall not be occupied / brought into use until there has been submitted to the Local Planning Authority verification by the competent person approved under the provisions of condition 4(c) that any remediation scheme required and approved under the provisions of condition 4(c) has been implemented fully in accordance with the approved details (unless varied with the written permission of the Local Planning Authority in advance of implementation). Unless agreed in writing with the Local Planning Authority such verification shall accord with UK Land contamination risk management (LCRM) national guidance, and the guidance contained in EA Guidance for the Safe Development of Housing on Land Affected by Contamination - R&D Publication 66: 2008. Typically such a report would comprise: a) A description of the site and its background, and summary of relevant site information, b) A description of the remediation objectives and remedial works carried out c) Verification data, including - data (sample locations/analytical results, as built drawings of the implemented scheme, photographs of the remediation works in progress, etc. d) Certificates demonstrating that imported and / or material left in situ is free from contamination, gas / vapour membranes have been installed correctly Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition 4(c). Reason: To minimise the risk from land contamination for the safety of the future occupiers of the development.
  6. Any imported soils required for the development should be demonstrated to be suitable for its intended end use and meet the approval of the Local Planning Authority prior to use on site. Reason: To minimise the risk from land contamination for the safety of the future occupiers of the development.
  7. No development shall commence until details for the sustainable disposal of surface water from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
  8. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  9. No construction, demolition or deliveries to the site shall take place during the demolition and construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  10. Prior to first occupation of any residential unit hereby permitted, the access, including the footway and/or verge crossing shall be constructed across the full width of the site fronting Leigh Road, and the telegraph pole to the front of the development has been relocated to a position that will not obstruct access to parking on site. Reason: To provide satisfactory access and in the interests of highway safety.
  11. Prior to first occupation a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard and soft landscaping (including boundary treatments, and biodiversity enhancements, which as a minimum shall include the installation of nesting boxes/ bricks) and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard, and maintained thereafter. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  12. No development above slab level shall commence until details of measures to protect future occupiers of the development from noise and air pollution associated with Leigh Road have been submitted to, agreed in writing by the Local Planning Authority and implemented. These agreed and implemented measures shall then be retained in full working order throughout the lifetime of the development. Reason: The application site falls within the Eastleigh Air Quality Management Area and is subject to significant levels of noise and air pollution.
  13. Prior to first occupation, the vehicle parking shall be provided in accordance with the approved plans and thereafter permanently retained. Reason: To make provision for off street parking for the purpose of highway safety
  14. Prior to first occupation, bin and cycle storage facilities shall be provided/installed in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority. The facilities shall thereafter be retained for bin and cycle storage only. Reason: To ensure the adequate provision of onsite facilities, and encouragement of alternative means of transport.
  15. Prior to the first occupation of the approved development, supporting information to confirm the predicted internal mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To achieve water efficiency requirements in the interest of environmental sustainability, in accordance with Policy DM2 of the Eastleigh Borough Local Plan 2016-2036.
  16. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  17. Notwithstanding the approved plans /details, no development above slab level shall commence until details of the following have been submitted to and approved in writing by the Local Planning Authority: • Cladding at first floor level – including manufacturer specification and colour • Junction details between differing facing materials at first floor level – showing the connection of cladding and neighbouring site (with specific regard to the principal elevations) The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  18. The brick (at ground floor level) and roof tiles to be used must match as closely as possible, in type, colour and texture of the existing examples on the host building. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  19. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  20. Note to Applicant: Subsequent to any planning permission, further permission will be required from Hampshire County Council to undertake the vehicle crossover/ drop kerb works on the highway. Details can be found on the following link: https://www.hants.gov.uk/transport/parking/droppedkerbs
  21. Note to Applicant: Applicants should be made aware that this work will require a secondary permission with HCC to undertake works on the highway and move street furniture, details of which can be found in the first instance via the following web page: https://www.hants.gov.uk/transport/developers/section-278
  22. Note to Applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-with-bats/ive-found-a-bat-during-works
  23. Note to Applicant: Subsequent to any permission, further permission will be required from Southern Water with regard to crossing/ developing over public sewers. It should be noted that Southern Water does not normally permit development over public sewers. However further investigations of the sewer is likely to be require. For further information: https://www.southernwater.co.uk/our-services/build-over-a-sewer
  24. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (December 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.