Council planning record

Replacement dwelling

SITE OF RAMCREST, LOWFORD HILL, BURSLEDON

Decided PermitReference: F/23/95453Eastleigh Borough Council

Last published check: 4 Oct 2026, 03:29. Check the council record for more recent changes.

Application location

SITE OF RAMCREST, LOWFORD HILL, BURSLEDON

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
19 Jun 2023
Validated
19 Jun 2023
Determination deadline
20 Dec 2023
Local authority
Eastleigh Borough Council

Application overview

Replacement dwelling

Proposal details

Reference
F/23/95453
Alternative references
12166102
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
ACM Architects Ltd (Mr Alan MacLean)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 24 of 24

DocumentPublishedAction
Ramcrest discharge of Condition 3 CEMP 230724Decision · PDF23 Jul 2024View
F-23-95453 RamcrestOfficer Report · PDF14 Dec 2023View
F_23_95453 PL_Final DecisionDecision Notice · PDF14 Dec 2023View
2020-05-03A Proposed First and Second PlansPlan · PDF7 Dec 2023View
2020-05-10A Proposed Site SectionsPlan · PDF7 Dec 2023View
2020-05-05A Proposed Elevations 2Plan · PDF7 Dec 2023View
2020-05-06B Proposed Site PlanPlan · PDF7 Dec 2023View
2020-05-04A Proposed Elevations 1Plan · PDF7 Dec 2023View
2020-05-01A Site and Location PlansPlan · PDF7 Dec 2023View
2020-05-10 Proposed Site SectionsPlan · PDF29 Nov 2023View
Response_F-23-95453Consultee Response · PDF26 Jul 2023View
Ecology response for F 23 95453 SITE OF RAMCREST, LOWFORD HILL, BURSLEDONConsultee Response · PDF17 Jul 2023View
Design and Access StatementDesign And Access Statement · PDF19 Jun 2023View
Biodiversity StatementSupporting Documents · PDF19 Jun 2023View
Preliminary Roost Assessment - RedactedSupporting Documents · PDF19 Jun 2023View
Proposed Site PlanSite Layout Plan · PDF19 Jun 2023View
Proposed Elevation 1 PlansElevations Plan · PDF19 Jun 2023View
Site and Location PlansLocation Plan · PDF19 Jun 2023View
Application Form RedactedApplication Form · PDF19 Jun 2023View
Proposed First and Second Floor PlansFloor Plan · PDF19 Jun 2023View
Proposed Lower and Ground Floor PlansFloor Plan · PDF19 Jun 2023View
Proposed Elevations 2Elevations Plan · PDF19 Jun 2023View
Existing Floor PlansFloor Plan · PDF4 Nov 2020View
Existing ElevationsElevations Plan · PDF4 Nov 2020View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Ramcrest discharge of Condition 3 CEMP 230724 F_23_95453 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: • Proposed Location and Block Plans 2020-05-01A • Proposed Lower Ground & Ground Floor Plans 2020-05-02A • Proposed First & Second Floor Plans 2020-05-03A • Proposed Elevations 1 2020-05-04A • Proposed Elevations 2 2020-01-05A • Proposed Site Sections 2020 05-10A • Proposed Site Plan 2005-05-06B • Existing Elevations 2005-01-06 • Existing Floor Plans 2005-01-07 Reason: For the avoidance of doubt and in the interests of proper planning.
  3. Prior to any further works commencing on site/ any implementation of this permission, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority, which shall include: (a) Location of construction materials, and plant storage areas used during construction; (b) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. (c) The parking of vehicles of site operatives and visitors; (d) A scheme for controlling noise and vibration from demolition and construction activities; (e) Provision for storage, collection, and disposal of rubbish from the development during construction period; (f) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; and Construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  4. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  5. No construction, demolition or deliveries to the site shall take place during the demolition and construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  6. The recommendations for biodiversity enhancement set out within the ‘Biodiversity Statement 2020-BD03’ and precautionary vegetation clearance, lighting, eradication of invasive species set out within Section 5 of the ‘Preliminary Roost Assessment Report (April 2021)’ shall be implemented in full prior to commencement of the development and shall be adhered to during the construction phase with the enhancement measures being incorporated in full before development is occupied. Reason: In the interests of protection of wildlife and supporting habitat.
  7. Prior to first use of the approved balcony, the 2no. privacy screens (east and west) shown on approved plans Proposed Elevations 1 2020-05-04A and Proposed Elevations 2 2020-01-05A shall be installed. The privacy screens shall remain in situ for lifetime of the balcony. Reason: In the interests of protecting the neighbouring amenities.
  8. Prior to the first occupation of the approved development, supporting information to confirm the predicted internal mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To achieve water efficiency requirements in the interest of environmental sustainability, in accordance with Policy DM2 of the Eastleigh Borough Local Plan 2016-2036.
  9. The materials to be used must match as closely as possible, in type, colour and texture those listed within the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  10. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no development permitted by Classes A, AA, B, C, E, F, G & H of Part 1, Schedule 2 of the Order shall be carried out without the prior written consent of the Local Planning Authority. Reason: To protect amenities of the neighbouring properties and the character of the locality.
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.