Council planning record

Construction of 1.no 4-bedroom dwelling

Land adjacent to 52 The Crossways, Chandlers Ford, Eastleigh, SO53 3BU

Decided PermitReference: F/23/95155Eastleigh Borough Council

Last published check: 4 Oct 2026, 09:32. Check the council record for more recent changes.

Application location

Land adjacent to 52 The Crossways, Chandlers Ford, Eastleigh, SO53 3BU

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
3 May 2023
Validated
12 May 2023
Determination deadline
6 Oct 2023
Local authority
Eastleigh Borough Council

Application overview

Construction of 1.no 4-bedroom dwelling

Proposal details

Reference
F/23/95155
Alternative references
12052508
Ward
Chandler's Ford Ward
Parish
Chandler's Ford CP
Agent
Mrs Louise Cutts

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 23 of 23

DocumentPublishedAction
F_23_95155 PL_Final DecisionDecision Notice · PDF5 Oct 2023View
Legal Agreement ReceiptLegal Agreement Supporting Info · PDF3 Oct 2023View
Drainage Technical NoteSupporting Documents · PDF10 Aug 2023View
Public sewer noteCorrespondence · PDF10 Aug 2023View
Natural England ResponseConsultation Response · PDF12 Jul 2023View
Southern Water GIS · PDF4 Jul 2023View
Southern Water LetterConsultation Response · PDF4 Jul 2023View
Amended Proposed ElevationsElevations Plan · PDF13 Jun 2023View
Hampshire HighwaysConsultation Response · PDF12 Jun 2023View
Ecology response for F 23 95155 Land adjacent to 52 The CrosswaysConsultee Response · PDF9 Jun 2023View
Objection 20 The CrosswaysNeighbour Letter1 Jun 2023View
Objection 34 Keble RoadNeighbour Letter29 May 2023View
Tree OfficerConsultation Response · PDF22 May 2023View
Block PlanBlock Plan · PDF19 May 2023View
Ecological Assessment_RedactedSupporting Documents · PDF12 May 2023View
Cover Letter_RedactedSupporting Documents · PDF12 May 2023View
Proposed floor plansFloor Plan · PDF12 May 2023View
SUPERSEDED Proposed Elevations PlansElevations Plan · PDF12 May 2023View
Planning design and Access StatementSupporting Documents · PDF3 May 2023View
SUPERSEDED Drainage StrategyDrainage Plan · PDF3 May 2023View
Tree InformationSupporting Documents · PDF3 May 2023View
Location PlanLocation Plan · PDF3 May 2023View
Application Form RedactedApplication Form · PDF3 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_95155 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: LOC 01, WP/CW/01/4, WP/CW/01/3, and WP/CW/01/2 Rev A Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No development shall commence on site until a Construction Environmental Method Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: a) A programme of and phasing of demolition (if any) and construction work; b) Provision of long term facilities for contractor parking and parking of vehicles of site operatives and visitors; c) Access and egress for plant and machinery; d) Location of temporary site buildings, compounds, construction material, and plant storage areas used during demolition and construction; e) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. f) The arrangements for the routing/ turning of lorries and details for construction traffic access to the site; g) A scheme for controlling noise and vibration from demolition and construction activities (to include piling); h) Provision for storage, collection, and disposal of rubbish from the development during construction period; i) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process; j) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; k) Details of any temporary lighting; l) Methods and phasing of construction works; m) Protection of pedestrian routes during construction; n) The measures taken to protect hedgehogs. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality
  4. Prior to the commencement of development, details of the proposed means of foul sewerage and surface water disposal shall be submitted to, and approved in writing by, the Local Planning Authority, in consultation with Southern Water. This shall be in broad accordance with the submitted Drainage Technical Note (V1.1) Reason: To ensure satisfactory provision of foul and surface water drainage
  5. The development must accord with the arboricultural report reference WT 021-23-AIA. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA Reason: To retain and protect the existing trees which form an important part of the amenity of the locality
  6. No development shall commence above damp-proof-course (DPC) until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area
  7. Prior to the first occupation of the approved dwelling, supporting information to confirm the predicted internal mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality design across the site and to achieve water efficiency.
  8. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  9. Prior to the occupation of any dwelling hereby approved, evidence that the dwelling complies with Part M4(2) standard (Accessible and adaptable dwellings) of the building regulations for new build residential development (or future equivalent), shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To ensure the development meets higher national access standards in accordance with policy DM29 of the Eastleigh Borough Local Plan 2016-2036.
  10. Prior to first occupation a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard and soft landscaping (including boundary treatments) and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard, and maintained thereafter. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  11. Prior to first occupation, the vehicle parking as shown on plans referenced WP/CW/01/4 and WP/CW/01/3 shall be implemented and thereafter retained for the lifetime of the development. Reason: To make provision for off street parking for the purpose of highway safety.
  12. Prior to first occupation, details of the bin and cycle storage shall be submitted to and approved in writing by the Local Planning Authority. The agreed details shall then be implemented in full within 1 month of occupation and retained for the lifetime of the development. Reason: To make provision for off street parking for the purpose of highway safety
  13. Prior to occupation, a plan detailing biodiversity enhancements shall be submitted to and approved in writing by the Local Planning Authority. These biodiversity enhancements shall include one habitat pile for reptiles and amphibians, a bat-brick on the south-eastern elevation and a bird nest box or swift brick on the north-western elevation. The garden shall be enhanced with native deciduous trees and shrubs and wildlife friendly planting. Reason: To ensure a biodiversity enhancement in accordance with Policy DM11 from the Eastleigh Borough Local Plan (2016-2036)
  14. The first-floor windows on the South East and North West elevations, as marked on the approved plan WP/CW/01/2 Rev A, shall be obscure glazed to Pilkingtons level 3 or equivalent. They shall have no more than a top opening toplight, unless otherwise specified on plan to fix-shut. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties
  15. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  16. No construction, demolition or deliveries to the site shall take place during the demolition and construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  17. Any bamboo on site shall be cordoned off during construction and shall not be allowed to leave site in any form. Reason: To ensure the invasive, non-native plant is not spread.
  18. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England
  19. Note to Applicant: Any new closed board fencing should have hedgehog holes (15 x 15 cm minimum) cut into the base boards to allow free passage of small mammals through the gardens.
  20. Note to Applicant: Vegetation clearance shall be undertaken outside the bird nesting season (ie between Sept-end Feb) unless otherwise thoroughly checked by a qualified ecologist and the vegetation clearance is not extensive. If there are any active nests all work must stop, and a 5 m buffer be erected to protect the nest from disturbance until the young have fledged and left the nest.
  21. Note to Applicant: The applicant is advised the granting of permission for the development does not imply right of access to The Crossways which is a private road. The applicant is advised to seek and obtain permission for the use of the private road in The Crossways from the owners of the road before commencing the development
  22. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (Sept 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.