Council planning record

Erection of 1.no 3-bedroom dwelling with associated amenity space and parking

Land rear of Saxon Court, The Barn, Burnetts Lane, Horton Heath, SO50 7D

Decided PermitReference: F/23/95151Eastleigh Borough Council

Last published check: 4 Oct 2026, 07:15. Check the council record for more recent changes.

Application location

Land rear of Saxon Court, The Barn, Burnetts Lane, Horton Heath, SO50 7D

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
2 May 2023
Validated
22 May 2023
Determination deadline
21 Sept 2023
Local authority
Eastleigh Borough Council

Application overview

Erection of 1.no 3-bedroom dwelling with associated amenity space and parking

Proposal details

Reference
F/23/95151
Alternative references
12128654
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 28 of 28

DocumentPublishedAction
F_23_95151 PL_Final DecisionDecision Notice · PDF19 Sept 2023View
F_23_95151 Delegated Officer ReportOfficer Report · PDF19 Sept 2023View
Legal Agreement ReceiptLegal Agreement Supporting Info · PDF18 Sept 2023View
Additional Ecology response for F 23 95151 Land rear of Saxon Court, The Barn, Burnetts Lane, Horton HeathConsultee Response · PDF15 Aug 2023View
Natural England ResponseConsultation Response · PDF19 Jul 2023View
Tree OfficerConsultation Response · PDF29 Jun 2023View
Ecology response amended for F 23 95151 Land rear of Saxon Court, The Barn, Burnetts Lane, Horton HeathConsultee Response · PDF27 Jun 2023View
Ecology response for F 23 95151 Land rear of Saxon Court, The Barn, Burnetts Lane, Horton HeathConsultee Response · PDF19 Jun 2023View
Certificate B _RedactedSupporting Documents · PDF15 Jun 2023View
Location and Site PlanLocation Plan · PDF15 Jun 2023View
Site Plan as ExistingSite Layout Plan · PDF15 Jun 2023View
ParishConsultation Response · PDF14 Jun 2023View
SOU ResponseConsultation Response13 Jun 2023View
Southern Water LetterConsultation Response · PDF13 Jun 2023View
Objection Foreman HomesCorrespondence · PDF7 Jun 2023View
Built Heritage ConsultantConsultation Response5 Jun 2023View
SUPERSEDED Site & Location PlanLocation Plan · PDF22 May 2023View
Proposed Site Plan DrainageSite Layout Plan · PDF22 May 2023View
Floor and Elevation PlansElevations And Floor Plan · PDF2 May 2023View
SUPERSEDED Block and Location PlanPlans · PDF2 May 2023View
Proposed Site PlanSite Layout Plan · PDF2 May 2023View
Design Access and Hertage Statement - Jan 2023Design And Access Statement · PDF2 May 2023View
Elevation PlanElevations Plan · PDF2 May 2023View
Arbo ReportCorrespondence Incoming · PDF2 May 2023View
Preliminary Ecological Appraisal & Preliminary Roost AssessmentSupporting Documents · PDF2 May 2023View
Arbo PlanPlan · PDF2 May 2023View
SUPERSEDED Existing Site PlanSite Layout Plan · PDF2 May 2023View
Application Form RedactedApplication Form · PDF2 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_95151 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: ST508-30a, ST508-31, ST508-32b, ST508-41a, ST508-42 and ST508-43. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. No development shall commence on site until a Construction Environmental Method Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: a) A programme of and phasing of demolition (if any) and construction work; b) Provision of long term facilities for contractor parking and parking of vehicles of site operatives and visitors; c) Access and egress for plant and machinery; d) Location of temporary site buildings, compounds, construction material, and plant storage areas used during demolition and construction; e) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. f) The arrangements for the routing/ turning of lorries and details for construction traffic access to the site; g) A scheme for controlling noise and vibration from demolition and construction activities (to include piling); h) Provision for storage, collection, and disposal of rubbish from the development during construction period; i) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process; j) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; k) Details of any temporary lighting; l) Methods and phasing of construction works; m) Protection of pedestrian routes during construction. Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
  4. Prior to the commencement of development, details of the proposed means of foul sewerage and surface water disposal shall be submitted to, and approved in writing by, the Local Planning Authority, in consultation with Southern Water. Southern Water would not support the proposals for Package treatment plant in the presence of public foul sewerage network in the close vicinity of the development site. The foul sewerage shall be disposed in accordance with Part H1 of Building Regulations hierarchy. Reason: To ensure satisfactory provision of foul and surface water drainage.
  5. Prior to the commencement of development, the developer must advise the Local Planning Authority, in consultation with Southern Water, of the measures which will be undertaken to divert the public sewers Reason: to ensure the protection of the existing public foul rising main
  6. Prior to the first occupation of the approved dwelling, supporting information to confirm the predicted internal mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality design across the site and to achieve water efficiency.
  7. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  8. Prior to the occupation of any dwelling hereby approved, evidence that the dwelling complies with Part M4(2) standard (Accessible and adaptable dwellings) of the building regulations for new build residential development (or future equivalent), shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To ensure the development meets higher national access standards in accordance with policy DM29 of the Eastleigh Borough Local Plan 2016-2036.
  9. Prior to first occupation a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard and soft landscaping (including boundary treatments) and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard, and maintained thereafter. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  10. Prior to first occupation, details of the bin and cycle storage shall be submitted to and approved in writing by the Local Planning Authority. The agreed details shall then be implemented in full within 1 month of occupation and retained for the lifetime of the development. Reason: To make provision for off street parking for the purpose of highway safety.
  11. Prior to first occupation, the vehicle parking as shown on plans referenced ST508-31 shall be implemented and thereafter retained for the lifetime of the development. Reason: To make provision for off street parking for the purpose of highway safety.
  12. The submitted Preliminary Ecological Appraisal and Preliminary Roost Assessment for The Barn by Arbtech (issue 2, April 2023) shall be adhered to in full. Prior to occupation, a plan detailing biodiversity enhancements shall be submitted to and approved in writing by the Local Planning Authority. Reason: To ensure habitat protection and enhancement
  13. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  14. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  15. The development must accord with the arboricultural report reference WT 008-22 AIA-ltr. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  16. Vegetation clearance shall be undertaken outside the bird nesting season (ie between Sept-end Feb) unless otherwise thoroughly checked by a qualified ecologist. If there are any active nests all work must stop, and a 5 m buffer be erected to protect the nest from disturbance until the young have fledged and left the nest. Reason: To ensure the protection of nesting birds.
  17. The submitted and approved Ecological Working Method and Practice Statement (referenced EWPMS V2) shall be adhered to in full. Reason: To ensure the safety of protected species during the construction period.
  18. Note to Applicant: Any new closed board fencing should have hedgehog holes (13 x 13 cm minimum) cut into the base boards to allow free passage of small mammals through the gardens.
  19. Note to Applicant: Given the nature of the proposed development it is possible that a crane may be required during its construction. We would, therefore, draw your attention to the requirement within CAP 1096 the Guidance to crane users on the crane notification process and obstacle lighting and marking.
  20. Note to Applicant: - The 150 mm public foul rising main requires a clearance of 3 metres on either side of the gravity sewer to protect it from construction works and to allow for future access for maintenance. - No development or tree planting should be carried out within 3 metres of the external edge of the public rising main without consent from Southern Water. - No soakaways, swales, ponds, watercourses or any other surface water retaining or conveying features should be located within 5 metres of a public rising main. - All existing infrastructure should be protected during the course of construction works.
  21. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (Sept 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.