Council planning record

Construction of 4no. two bedroom and 2no. one bedroom apartments in a two and three storey block, with ancillary amenity space, landscaping, bin and cycle storage.

Land at the Hanns Way Car Park, Eastleigh Town Centre, Land at Hanns Way Car Park, Eastleigh

Decided PermitReference: F/23/95122Eastleigh Borough Council

Last published check: 4 Oct 2026, 13:44. Check the council record for more recent changes.

Application location

Land at the Hanns Way Car Park, Eastleigh Town Centre, Land at Hanns Way Car Park, Eastleigh

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
26 Apr 2023
Validated
26 Apr 2023
Determination deadline
21 Jun 2023
Local authority
Eastleigh Borough Council

Application overview

Construction of 4no. two bedroom and 2no. one bedroom apartments in a two and three storey block, with ancillary amenity space, landscaping, bin and cycle storage.

Proposal details

Reference
F/23/95122
Alternative references
12114106
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 50 of 50

DocumentPublishedAction
F_23_95122 PL_NMA Accepted 151025Nonmaterial Minor Amendment · PDF15 Oct 2025View
Application Form RedactedNonmaterial Minor Amendment · PDF1 Oct 2025View
Covering Letter Hanns Way NMA 01.10.25_RedactedNonmaterial Minor Amendment · PDF1 Oct 2025View
Ground Floor PlansNonmaterial Minor Amendment · PDF1 Oct 2025View
Proposed Elevations Sheet 2 of 2Nonmaterial Minor Amendment · PDF1 Oct 2025View
Proposed Elevations PlansNonmaterial Minor Amendment · PDF1 Oct 2025View
Proposed Second Floor PlansNonmaterial Minor Amendment · PDF1 Oct 2025View
Proposed First Floor Plans - Level 01Nonmaterial Minor Amendment · PDF1 Oct 2025View
F_23_95122 PL_Final DecisionDecision Notice · PDF12 Jun 2023View
Printed minutes 06062023 1900 Eastleigh Local Area Committee · PDF9 Jun 2023View
Committee PresentationCommittee Report · PDF7 Jun 2023View
Natural EnglandConsultee Response · PDF31 May 2023View
F_23_95122 - Hanns Way - Committee ReportCommittee Report · PDF30 May 2023View
Eastleigh Town CouncilParish Response · PDF24 May 2023View
Southern Water - GIS · PDF19 May 2023View
Southern WaterConsultation Response · PDF19 May 2023View
Ecology response for F 23 95122 Land at the Hanns Way Car Park, Eastleigh Town CentreConsultee Response · PDF18 May 2023View
Urban Design - Hans Way Car ParkConsultee Response · PDF15 May 2023View
Visualisation looking east from Wells PlaceIllustration · PDF12 May 2023View
F_23_95122 - Habitat Regulations Assessment May 2023Ecological Assessment · PDF12 May 2023View
F_23_95122 - Itchen Nutrient Budget Calculator Final - May 2023Ecological Assessment12 May 2023View
Hampshire HighwaysConsultee Response · PDF9 May 2023View
AMENDED - Drawing Issue Sheet 03.05.23Supporting Documents · PDF3 May 2023View
Visualisation - Looking west from Wells PlaceIllustration · PDF3 May 2023View
Environmental Health (Pollution) - Hanns WayConsultee Response · PDF2 May 2023View
Proposed Elevation PlanElevations Plan · PDF26 Apr 2023View
Landscape Proposal PlanPlan · PDF26 Apr 2023View
Bin and Bike Store PlansPlans · PDF26 Apr 2023View
Air Quality Assessment - v1Supporting Documents · PDF26 Apr 2023View
Coloured Street ScenesPlan · PDF26 Apr 2023View
Location PlanLocation Plan · PDF26 Apr 2023View
Ecological Enhancement Plan 2023Supporting Documents · PDF26 Apr 2023View
Existing Site LayoutSite Layout Plan · PDF26 Apr 2023View
SUPERSEDED - Drawing Issue SheetSupporting Documents · PDF26 Apr 2023View
Planning Statement - FinalPlanning Statement · PDF26 Apr 2023View
22205 - P110 - Proposed Floor Plans.pdf · PDF26 Apr 2023View
Nightingale Preliminary Investigation Report - APR23 - Compressed_RedactedSupporting Documents · PDF26 Apr 2023View
Coloured Elevation PlansElevations Plan · PDF26 Apr 2023View
Proposed Site LayoutSite Layout Plan · PDF26 Apr 2023View
Draft Heads of TermSupporting Documents26 Apr 2023View
Schedule of AccommodationSupporting Documents · PDF26 Apr 2023View
Existing Street ScenesPlan · PDF26 Apr 2023View
Noise Assessment - v1_RedactedSupporting Documents · PDF26 Apr 2023View
Access Statement_RedactedSupporting Documents · PDF26 Apr 2023View
Odour Assessment - v1Supporting Documents · PDF26 Apr 2023View
Coloured Site LayoutPlan · PDF26 Apr 2023View
Application Form RedactedApplication Form · PDF26 Apr 2023View
Drainage Strategy Technical NoteSupporting Documents · PDF26 Apr 2023View
Design and Access StatementDesign And Access Statement · PDF26 Apr 2023View
Main Investigation Report - APR23_RedactedSupporting Documents · PDF26 Apr 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_95122 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: S101, S102, S103, P101a, P110, P111, P112 & C103. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  4. No construction or site preparation work shall start until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. All works shall only take place in accordance with the approved method statement which shall include: a) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for the routing/ turning of lorries and details for construction traffic access to the site; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway; d) the parking of vehicles of site operatives and visitors; e) measures to control the emission of dust and dirt generated by demolition and construction; f) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); g) provision for storage, collection, and disposal of rubbish from the development during construction period; h) measures to prevent mud and dust on the highway during demolition and construction; i) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; j) temporary lighting; and k) protection of pedestrian routes during construction. Reason: To limit the impact the development has on the amenity of the locality.
  5. No work shall start on site until the following has been submitted to, and approved in writing by the Local Planning Authority: a) A site investigation report documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the desk study in accordance with BS10175:2001+A2:2017, and, unless otherwise agreed with the Local Planning Authority; b) A detailed scheme for remedial works and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed and proposals for future maintenance a and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Site investigations are to be undertaken by a competent person and in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors.
  6. Before any part of the development is occupied or used, unless otherwise first agreed in writing by the Local Planning Authority (LPA), a verification report demonstrating the effectiveness of the remediation works carried out and a remediation completion certificate confirming that the approved remediation scheme has been implemented in full shall both have been submitted to and approved in writing by the LPA. The verification report and remediation completion certificate shall be submitted in accordance with the approved scheme and undertaken by a competent person in accordance with Defra and the Environment Agency’s LCRM. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors.
  7. No site preparation or construction works shall commencement until an Asbestos Management Plan has been submitted to and approved in writing by the Local Planning Authority, in order to ensure construction workers and adjacent sensitive receptors are adequately protected from the asbestos identified within Made Ground soils beneath the site. The development and construction works must accord with these approved details. Reason: In the interests of amenity and protection of human health.
  8. No development shall start until details for the protection of existing sewer infrastructure during the construction process has been submitted to and approved in writing by the Local Planning Authority in consultation with Southern Water. All works shall then accord with the approved details. Reason: To ensure existing infrastructure is protected.
  9. No development shall start until details for the sustainable disposal of surface water and disposal of foul sewerage from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority in consultation with Southern Water. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
  10. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  11. No burning of materials obtained by site clearance, or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  12. No development above damp-proof course level shall start until full details of noise and odour protection measures incorporated within the development have been submitted to and approved in writing by the Local Planning Authority (LPA). These details shall include technical details of fenestration sound insulation for the higher 15-minute average and instantaneous incident noise impacting the external façade, sound insulation and mechanical ventilation means, which shall include air purification measures or alternative clean and non-odorous air supply, as well as details of on-going maintenance of the systems. Once approved, these measures shall be installed and written verification from an appropriately qualified professional provided to the LPA before occupation of the development which demonstrate all mitigation measures are effective. Reason: To protect the amenities of future occupiers of the development from noise and odours in the locality.
  13. Notwithstanding the approved plans / details, no development above dampproof course level shall start until details of the following have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. a) details of all facing and cladding materials and finishes; b) roof, parapet and coping finishes and construction details; c) window reveal depths and decorative brickwork details; d) details of window frame and external door colours and materials; e) details of rainwater goods; f) details of balcony balustrade materials, colour and appearance; g) details of finish for the underside of balconies and main entrance canopy; and i) details of any external lighting. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  14. No development above damp-proof course level shall start until details for the treatment of site boundaries have been submitted to and approved in writing by the Planning Authority. The development shall not be brought into use until the boundary treatment has been provided in accordance with the approved details and retained thereafter. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of residents.
  15. No development above damp-proof course level shall start until details of any new dropped kerb access or footway crossing have been submitted to and approved in writing by the Local Planning Authority. The development shall not be brought into use until the approved details have been fully implemented. Reason: To ensure satisfactory access to the site.
  16. The existing access from Hanns Way shall be stopped up and abandoned and the footway crossing reinstated in accordance with details to be approved by the Local Planning Authority in conjunction with the Highway Authority. Reason: To ensure safe pedestrian access to the development property and in the interests of visual amenity.
  17. No development above damp-proof course level shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping, including trees and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of residents.
  18. All hard & soft landscaping and tree planting shall be carried out in accordance with the approved details and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of residents.
  19. No development above damp-proof course level shall start until full details of ecological enhancement measures have been submitted to and approved in writing by the Local Planning Authority. These agreed measures shall then be implemented in full prior to occupation of the development and retained throughout the lifetime of the development. Reason: To protect and enhance biodiversity.
  20. All windows at first and second floor level on the western elevation shall either be: obscure glazed to Pilkingtons level 3 or equivalent with no opening part less than 1.7 metres above the floor level of the rooms which it serves; or positioned with its lower sill at least 1.7 metres above the floor of the room in which it is installed. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  21. The development shall not be occupied until the bin storage and any level access/dropped kerb required for servicing has been constructed in accordance with the approved details and thereafter retained and kept available. Reason: To ensure the adequate provision of on-site facilities.
  22. The development hereby approved shall not be occupied until the cycle storage, including charging points for E-bikes and scooters has been constructed in accordance with the approved details and thereafter retained and kept available. Reason: To ensure the adequate provision of on-site facilities.
  23. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  24. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  25. Note to Applicant: the permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways.
  26. Note to Applicant: This development is located within a residents parking scheme, and it is Council policy that residents of all new developments will not be eligible for parking permits. The term development means the construction of new or replacement buildings or alterations to existing buildings that result in an increased demand for parking not catered for within the development.
  27. Note to Applicant: Any use of cranes must comply with the British Standard Code of Practice for the safe use of Cranes and the Crane operators must consult the aerodrome before erecting a crane in close proximity to an aerodrome. This is further explained in Advice Note 4, Cranes & Other Construction Issues [available at http://www.aoa.org.uk/policycampaigns/operations-safety/].
  28. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders’ advice note.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.