Council planning record

Erection of gabions at the end of the garden to restore sea defences.

3 MANCHESTER ROAD, NETLEY ABBEY, SOUTHAMPTON, SO31 5DB

Decided PermitReference: F/23/94942Eastleigh Borough Council

Last published check: 4 Oct 2026, 13:59. Check the council record for more recent changes.

Application location

3 MANCHESTER ROAD, NETLEY ABBEY, SOUTHAMPTON, SO31 5DB

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
27 Mar 2023
Validated
25 Apr 2023
Determination deadline
20 Jun 2023
Local authority
Eastleigh Borough Council

Application overview

Erection of gabions at the end of the garden to restore sea defences.

Proposal details

Reference
F/23/94942
Alternative references
11956229
Ward
Hamble & Netley Ward
Parish
Hound CP
Agent
Mrs Caroline Jezeph

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 21 of 21

DocumentPublishedAction
F_23_94942 PL_Final DecisionDecision Notice · PDF14 Jun 2023View
F_23_94942 Officer ReportOfficer Report · PDF14 Jun 2023View
Environment AgencyConsultation Response7 Jun 2023View
Natural EnglandConsultation Response6 Jun 2023View
Parish CouncilConsultation Response22 May 2023View
Ecology OfficerConsultee Response · PDF18 May 2023View
Tree OfficerConsultation Response10 May 2023View
Built Heritage ConsultantConsultation Response10 May 2023View
Flood Risk AssessmentFlood Risk Assessment · PDF9 May 2023View
Environment AgencyConsultation Response27 Apr 2023View
Proposed Sea Defence Wall ElevationElevations Plan · PDF25 Apr 2023View
Eco Impact Assessment_RedactedSupporting Documents · PDF4 Apr 2023View
CEMP Report (1)_RedactedSupporting Documents · PDF4 Apr 2023View
Planning StatementSupporting Documents · PDF27 Mar 2023View
Application Form RedactedApplication Form · PDF27 Mar 2023View
Detailed Planting PlanPlan · PDF27 Mar 2023View
Sea Defence Wall PlanPlan · PDF27 Mar 2023View
CBA Arboricultural Development StatementSupporting Documents · PDF27 Mar 2023View
Block PlanBlock Plan · PDF27 Mar 2023View
Location PLan · PDF1 Sept 2022View
2022.01.24 Topographic SurveySurvey Plan · PDF1 Sept 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_94942 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Loc 01, Blo 01, 300, 445472-301P8, 21407 & 445472-302P1 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The development shall accord with the arboricultural report reference CBA11704 v1A and planting plan no. 300. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the approved report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the Local Planning Authority. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  4. The development shall be carried out in accordance with the construction environmental management plan by Cowan Consultancy (dated 9 March 2023 & referenced EG/435376/EG) and the Ecological Impact Assessment by ECOCA (dated March 2023, Final Document - Revision 2). Reason: To protect the Special Protection Area from the impacts of the development.
  5. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used in the existing gabion wall. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  6. No vegetation clearance shall occur on site during the bird nesting season [between 1st March & 31st August] unless checked by an ecologist prior to clearance.If an active nest is found it must be protected from disturbance with a 10m buffer until the chicks have fledged and left the nest. All vegetation clearance shall be done using hand tools only. Reason: to avoid disturbance to nesting birds.
  7. No Works shall occur on site during the over wintering bird period [between 1st October to 31st March]. Reason: to avoid disturbance to wintering birds that are associated with the Solent and Southampton Water Ramsar site and Special Protection Area.
  8. The planting shall be fully installed on site in accordance with the approved details (as shown on detailed planting plan, drawing number 300 and Ecological Impact Assessment) by the end of the first planting season following completion of the development. For a period of no less than 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: To provide a replacement habitat for invertebrates and other animals.
  9. A tree-mounted bird box shall be installed on the site before the start of the next bird nesting season or before the start of works, whichever is soonest. Reason: To compensate for loss of bird nesting opportunities within the site.
  10. The new concrete post and gravel board fence (as shown on the Sea Defence Wall GA and Sections plan by Cowan Consultancy, Feb 2022) shall have hedgehog openings at ground level (of at least 13 x 13 cm). Reason: To enable hedgehogs to move freely through the gardens.
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.