Council planning record

Full demolition of 5 bed bungalow to allow a rebuild of a 4 bed chalet bungalow with store and creating a rear extension with 2 dormer windows

VILLA CERVINO, BOTLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7DT

Decided PermitReference: F/23/94918Eastleigh Borough Council

Last published check: 7 Oct 2026, 23:36. Check the council record for more recent changes.

Application location

VILLA CERVINO, BOTLEY ROAD, HORTON HEATH, EASTLEIGH, SO50 7DT

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
22 Mar 2023
Validated
20 Apr 2023
Determination deadline
4 Aug 2023
Local authority
Eastleigh Borough Council

Application overview

Full demolition of 5 bed bungalow to allow a rebuild of a 4 bed chalet bungalow with store and creating a rear extension with 2 dormer windows

Proposal details

Reference
F/23/94918
Alternative references
12035396
Ward
West End North Ward;Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Keira Soares Design Studios (Mrs Keira Soares)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
F_23_94918 PL_Final DecisionDecision Notice · PDF3 Aug 2023View
F_23_94918 Delegated Officer ReportOfficer Report · PDF1 Aug 2023View
Additional Ecology response for F 23 94918 VILLA CERVINO, BOTLEY ROAD, HORTON HEATHConsultee Response · PDF25 Jul 2023View
SW ResponseConsultation Response · PDF3 Jul 2023View
Ecology response for F 23 94918 VILLA CERVINO, BOTLEY ROAD, HORTON HEATHConsultee Response · PDF18 May 2023View
Tree Officer commentsConsultation Response17 May 2023View
Parish commentConsultation Response10 May 2023View
Site Plans 02 · PDF2 May 2023View
Proposed Rendered Elevation PlansElevations Plan · PDF22 Mar 2023View
Proposed Roof & Floor PlansPlans · PDF22 Mar 2023View
Block PlansBlock Plan · PDF22 Mar 2023View
Application Form RedactedApplication Form · PDF22 Mar 2023View
Proposed Elevations PlansElevations Plan · PDF22 Mar 2023View
PEAPRASupporting Documents · PDF22 Mar 2023View
Location PlanLocation Plan · PDF5 Jan 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_94918 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: LOC 01, LAY001, LAY002, LAY003 Rev 2, LAY004 Rev 02 and LAY005 Rev 02 Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. No excavation, demolition or development related works shall take place on site until a scaled and referenced tree protection plan, as per British Standard 5837:2012 (Trees in Relation to Design, Demolition and Construction – Recommendations), is submitted and approved by the LPA. The approved tree protection plan must be adhered to in full, and may only be modified subject to written agreement from the LPA. Reason: to retain and protect the existing trees which form an important part of the amenity of the locality.
  5. No excavation, demolition or development related works shall start on site until a CEMP (construction environmental management plan) outlining methods to protect the watercourse and its bank and surrounding habitats from the development works has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall include the precautions to protect wildlife detailed within section 6.2.1. of the preliminary ecological assessment, with the following amendments: - If vegetation or brush piles cannot be cleared outside of bird nesting season, then they must be checked by a suitably qualified ecologist immediately before clearance. If any active nests are found the nest must be protected from disturbance with a 5 m buffer until after the chicks have fledged and left the nest. The CIEEM and RSPB guidance states that netting should only be used under exceptional circumstances and only if all other alternatives have been exhausted. (see article on CIEEM and RSPB advise against netting available at: https://cieem.net). - Any vegetation/log pile/habitat that could shelter reptiles must also be removed carefully, by hand and outside of the reptile active season and the grass be kept cut short until after construction is completed so that it will not become suitable reptile habitat. - A fenced construction exclusion zone and silt fencing (such as hay bales wrapped in terram-type landscaping fabric and pegged down) must be erected before the start of works to prevent runoff and silt from the site from entering the woodland and Spear Pond Gully SINC. Silt fencing must be checked daily by the site manager and replaced immediately if damaged or breached at any time. - Re-fuelling of equipment may only be done on absorbent pads, on the drive at the front of the house and away from the slope or the woodland. - External lighting should not be used during the construction phase, or if needed to enable works, it must be shielded so that no light enters or shines on the woodland. The development shall be carried out in accordance with the approved CEMP. Reason: To avoid damage to habitats on the site. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties. No construction, demolition or deliveries to the site shall take place during the demolition and construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  6. Note to applicant: In the unlikely event of any bats being found during demolition or construction, all work must stop immediately, and Natural England must be called. Additional information is available on the Bat Conservation Trust website at https://www.bats.org.uk/advice/im-working-on-a-building-withbats/ive-found-a-bat-during-works. The report recommends installation of at least two bat boxes on retained trees for the previous application, but since the proposal is to rebuild with a 2-storey building, built in bat bricks/boxes are preferred. They do not need maintenance and cannot fall off. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, southeast or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box). We also recommend the installation of swift bricks or swift nest boxes. These can be used by other birds when swifts are not present. Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Southern Water records show and existing foul sewer within the development site. The exact position of the public asset must be determined on site by the applicant in consultation with Southern Water before the layout of the proposed development is finalised. - The 150 mm public foul sewer requires a clearance of 3 metres on either side of the public foul sewer to protect it from construction works and to allow for future maintenance access. - No development or tree planting should be carried out within 3 metres of the external edge of the public foul sewer without consent from Southern Water. - No soakaways, swales, ponds, watercourses or any other surface water retaining or conveying features should be located within 5 metres of public or adoptable gravity sewers. - All existing infrastructure should be protected during the course of construction works. Please refer to: southernwater.co.uk/media/3011/stand-off-distances.pdf It is possible that a sewer now deemed to be public could be crossing the development site. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its ownership before any further works commence on site Please refer to the LSBUD Support Page (www.lsbud.co.uk/linesearchbeforeudig-support) for further guidance on the protection of pipelines/electricty infrastructure
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.