Erection of a pair of semi detached dwellings (2No. three-bed) on land to rear and side of 15 & 17 Lower New Road, provision of off-road parking served via new highway access off Lower New Road (AMENDED DESCRIPTION).
Land at 15 & 17, Lower New Road, West End, Eastleigh, SO30 3FJ
Decided PermitReference: F/23/94860Eastleigh Borough Council
Last published check: 8 Oct 2026, 06:17. Check the council record for more recent changes.
Application location
Land at 15 & 17, Lower New Road, West End, Eastleigh, SO30 3FJ
This record has no verified map location.
Application summary
Status
Decided Permit
Application type
Full planning
Received
13 Mar 2023
Validated
13 Mar 2023
Determination deadline
30 Jun 2023
Local authority
Eastleigh Borough Council
Application overview
Erection of a pair of semi detached dwellings (2No. three-bed) on land to rear and side of 15 & 17 Lower New Road, provision of off-road parking served via new highway access off Lower New Road (AMENDED DESCRIPTION).
Proposal details
Reference
F/23/94860
Alternative references
11995368
Ward
West End North Ward
Parish
West End CP
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be implemented in accordance with the following plans numbered: 2222-001-A, 2222-002-E, 2222-003-C, 2222-004-C & 2222-005-D. Reason: For the avoidance of doubt and in the interests of proper planning.
The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
No construction or demolition work shall start until a Construction Environmental Management Statement (CEMP) has been submitted to, and approved in writing by the Local Planning Authority. Preparation and construction work shall only take place in accordance with the approved CEMP which shall include: a) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for the routing/ turning of lorries and details for construction traffic access to the site; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. d) the parking of vehicles of site operatives and visitors; e) measures to control the emission of dust and dirt generated by demolition and construction; f) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); g) measures to prevent mud and dust on the highway during demolition and construction; h) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; i) temporary lighting; and j) protection of pedestrian routes during construction. Reason: To limit the impact the development has on the amenity of the locality.
No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
No development beyond damp-proof-course level shall start until details and samples where requested of the materials to be used in the construction of the external surfaces of the development hereby permitted, together with details of windows, doors and rainwater goods, have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
No development shall start until details of a sustainable drainage system have been submitted to and approved in writing by the local planning authority. The details shall include a timetable for its implementation and a management/ maintenance plan for the lifetime of the development [including the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the effective operation of the sustainable drainage system throughout its lifetime]. The system shall be implemented and thereafter managed and maintained in accordance with the approved details. Reason: To ensure satisfactory drainage for the development.
No development above damp-proof-course level shall start until details of the access including any footway crossings, have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the approved details have been fully implemented. Reason: To ensure satisfactory vehicular access.
No development above damp-proof-course level shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping including trees and boundary treatment, and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
All hard & soft landscaping, tree planting and boundary treatment shall be carried out in accordance with the approved details and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
No development above damp-proof-course level shall start until details of ecological enhancement measures have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the agreed measures have been carried out in accordance with the approved details. Reason: To protect and enhance biodiversity.
Note to Applicant: Any closed board fencing must have at least two openings in the base boards, at least 13 x 13 cm to allow small mammals such as hedgehogs free passage through the gardens. A bat brick and a swift brick may be appropriate for each dwelling. The Bat Conservation Trust recommends installing a bat brick/box at least 4 m above the ground, away from artificial light sources, sheltered from strong winds and exposed to the sun for part of the day, facing south, south-east or south-west. (https://www.bats.org.uk › our-work › putting-up-your-box) Swift nest boxes are best positioned under the eaves or on walls facing north, northeast or north-west out of direct sunlight, five metres above the ground, with clear adjacent airspace so swifts can access them in a high-speed direct flight. (https://www.swiftconservation.org/Nestboxes%26Attraction.htm ) Additional information is available at: https://sussexwildlifetrust.org.uk/discover/in-your-garden/article/31, https://www.rhs.org.uk/science/conservation-biodiversity/wildlife/plants-for-pollinators https://www.bats.org.uk/our-work/buildings-planning-and-development/bat-boxes https://www.hampshireswifts.co.uk/nesting https://www.rspb.org.uk/birds-and-wildlife/advice/how-you-can-helpbirds/nestboxes/nestboxes-for-small-birds/ https://www.swift-conservation.org/OurLeaflets.htm https://www.hedgehogstreet.org/help-hedgehogs/hedgehog-homes/
The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
The development hereby permitted shall not be occupied until the parking areas have been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwelling house as a residence. Reason: To make provision for off street parking for the purpose of highway safety and amenity.
The development hereby permitted shall not be occupied until the bin & cycle storage has been provided in accordance with the approved details and thereafter retained and kept available. Reason: To ensure the adequate provision of on site facilities.
Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] Order 2015 [or any order revoking and re-enacting that Order with or without modification], no development permitted by Classes A, B & C of Part 1 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenities of the locality; to maintain sufficient useable external amenity space; and sufficient off-road parking provision.
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Note to Applicant: the permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways.
Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.