The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
The development hereby permitted shall be implemented in accordance with the following plans numbered: • Existing & Proposed Bock and Location Plan 1706/P/10 A • Proposal 1 Plans & Elevations 1706/P/11 D • Existing and Proposed Parking, Bin & Bike Plans 1706/E/01 A • Proposed Parking visibility splay 1706/P/13 • Proposed Drainage Plan 1706/P/14 B Reason: For the avoidance of doubt and in the interests of proper planning.
No development shall commence on site until a Construction Environmental Method Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: (a) A programme of and phasing of demolition (if any) and construction work; (b) Location of temporary site buildings, compounds, construction material, and plant storage areas used during demolition and construction; (c) The arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. (d) The arrangements for the routing/ turning of lorries and details for construction traffic access to the site; (e) The parking of vehicles of site operatives and visitors; (f) A scheme for controlling noise and vibration from demolition and construction activities (to include piling); (g) Provision for storage, collection, and disposal of rubbish from the development during construction period; (h) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e wheel washers), and onwards mitigation should this fail, such as the employment of mechanical road sweepers, and the subsequent refresh of street lining (as and when required) should this be damaged during the process; (i) The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; (j) Details of any temporary lighting; (k) Details of wildlife protection measures; Demolition and construction work shall only take place in accordance with the approved method statement. Reason: In order that the Planning Authority can properly consider the effect of the works on the amenity of the locality.
Prior to first occupation, the access, including the footway and/or verge crossing has been constructed and lines of sight of 2.4m by 43m provided in accordance with the approved plans. The lines of sight splays shown on the approved plans and contained within the site boundary shall be kept free of any obstruction exceeding 0.6m in height above the adjacent carriageway and shall be subsequently maintained so thereafter. Reason: To provide satisfactory access and in the interests of highways safety.
No development shall commence until details for the sustainable disposal of surface water and the disposal of foul sewerage from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
No construction, demolition or deliveries to the site shall take place during the demolition and construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
Prior to first occupation a landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard and soft landscaping (including boundary treatments, and biodiversity enhancements, which as a minimum shall include the installation of nesting boxes/ bricks) and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard, and maintained thereafter. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (or any order revoking and re-enacting that Order with or without modification), no development permitted by Classes A, B, C and E of Part 1, Schedule 2 and Class A of Part 2, Schedule 2 of the Order shall be carried out without the prior written consent of the Local Planning Authority. Reason: To ensure the provision of an appropriate level of amenity space and in the interest of maintaining a good quality environment for future occupiers and neighbours.
The mitigation recommendations set out within Section 14 of the Extended Phase 1 Ecological Assessment (May 2023) shall be implemented in full prior to commencement of development and shall be adhered to during the construction phase until the development is complete. Reason: In the interests of protection of wildlife and supporting habitat.
The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
Prior to first occupation, the vehicle parking, bin and cycle storage shall be provided in accordance with the approved plans and thereafter permanently retained. Reason: To make provision for off street parking for the purpose of highway safety.
Prior to the first occupation of the approved development, supporting information to confirm the predicted internal mains water consumption will achieve a maximum level of 110 litres/person/day shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To achieve water efficiency requirements in the interest of environmental sustainability, in accordance with Policy DM2 of the Eastleigh Borough Local Plan 2016-2036.
The materials to be used must match as closely as possible, in type, colour and texture those listed in the Materials Section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
Prior to the occupation of any dwelling hereby approved, evidence that the dwelling complies with Part M4(2) standard (Accessible and adaptable dwellings) of the building regulations for new build residential development (or future equivalent), shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To ensure the development meets higher national access standards in accordance with policy DM29 of the Eastleigh Borough Local Plan 2016-2036.
The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
Note to Applicant: Subsequent to any planning permission, further permission will be required from Hampshire County Council to undertake the vehicle crossover/ drop kerb works on the highway. Details can be found on the following link: https://www.hants.gov.uk/transport/parking/droppedkerbs
Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (September 2023), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.