Council planning record

Construction of 5no. general industrial buildings (Use Class B2) containing 15 separate units, including landscaping, parking and associated works (amended description)

Land East of Knowle Lane, Fair Oak, SO50 7DZ

Decided PermitReference: F/23/94668Eastleigh Borough Council

Last published check: 8 Oct 2026, 05:26. Check the council record for more recent changes.

Application location

Land East of Knowle Lane, Fair Oak, SO50 7DZ

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
3 Feb 2023
Validated
16 Mar 2023
Determination deadline
17 Jul 2023
Local authority
Eastleigh Borough Council

Application overview

Construction of 5no. general industrial buildings (Use Class B2) containing 15 separate units, including landscaping, parking and associated works (amended description)

Proposal details

Reference
F/23/94668
Alternative references
11892122
Ward
Fair Oak & Horton Heath Ward
Parish
Fair Oak and Horton Heath CP
Agent
Mr Jacob Goodenough

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 108 of 108

DocumentPublishedAction
Discharge of condition 10 and compliance condition 17 East Horton Business Park 210524Decision · PDF21 May 2024View
East Horton Business Park discharge of Condition 7 141223Decision · PDF14 Dec 2023View
Condition 4 Discharge 141123Decision · PDF14 Nov 2023View
Decision NoticeDecision Notice · PDF14 Jul 2023View
F_23_94668 Decision notice informative leaflet - PERMIT · PDF14 Jul 2023View
Natural England response to Appropriate Assessment No objectionConsultation Response · PDF13 Jul 2023View
HRA Appropriate Assessment Land east of Knowle Lane 280623 · PDF28 Jun 2023View
Final Highway commentsConsultation Response · PDF20 Jun 2023View
Further Drainage Note - Surface Water drainage treatment train · PDF13 Jun 2023View
Lighting Strategy updated · PDF13 Jun 2023View
Lighting plan updated · PDF13 Jun 2023View
Further Ecology comments June 23Consultee Response · PDF8 Jun 2023View
Water Quality calculations_RedactedSupporting Documents · PDF7 Jun 2023View
Site Plan (Amended)Site Layout Plan · PDF7 Jun 2023View
Vehicle Tracking PlanPlan · PDF7 Jun 2023View
Environment Agency commentsConsultation Response · PDF6 Jun 2023View
Southampton Airport further commentsConsultation Response · PDF6 Jun 2023View
Parish Council further commentsConsultation Response · PDF6 Jun 2023View
Landscape Officer further commentsConsultation Response · PDF30 May 2023View
Southern Water further commentsConsultation Response · PDF30 May 2023View
Southern Water mapConsultation Response · PDF30 May 2023View
Further Urban Design commentsConsultation Response · PDF26 May 2023View
Block E coloured floorplans JD_116_BLOCKE.p_coloured_230523Plan · PDF24 May 2023View
Block E coloured elevations 2 JD_116_BLOCKE.e2_coloured_230523Plan · PDF24 May 2023View
Block B coloured elevations JD_116_BLOCKB.e_Rev A_coloured230523Plan · PDF24 May 2023View
Block B coloured floorplans JD_116_BLOCKB.p_Rev A_coloured_230523Plan · PDF24 May 2023View
Block D coloured elevations 2 JD_116_BLOCKD.e2_Rev A_coloured_230523Plan · PDF24 May 2023View
Block D coloured floorplans JD_116_BLOCKD.p_Rev A_coloured_230523Plan · PDF24 May 2023View
Block C coloured floorplans JD_116_BLOCKC.p_Rev A_coloured_230523[65]Plan · PDF24 May 2023View
Block A coloured elevations JD_116_BLOCKA.e_Rev A_coloured_230523Plan · PDF24 May 2023View
HCC Highway Further ResponseConsultation Response · PDF24 May 2023View
HCC Flood and Water further commentsConsultation Response · PDF24 May 2023View
Block E coloured elevations 1JD_116_BLOCKE.e1_coloured_230523Plan · PDF24 May 2023View
Block A coloured floorplan JD_116_BLOCKA.p_Rev A_coloured230523Plan · PDF24 May 2023View
Block C coloured elevations JD_116_BLOCKC.e_Rev A_coloured_230523Plan · PDF24 May 2023View
Block D coloured elevations 1 JD_116_BLOCKD.e1_Rev A_coloured_230523Plan · PDF24 May 2023View
Tree Officer further commentsConsultation Response · PDF23 May 2023View
HCC Archaeology further responseConsultation Response · PDF19 May 2023View
Further Environmental Health comments noiseConsultation Response · PDF18 May 2023View
Landscape Layout Plan AmendedLandscape Plan · PDF17 May 2023View
Tree Pit Details · PDF17 May 2023View
Landscape and Drainage Overlay PlanPlan · PDF17 May 2023View
Block E south and east elevations AMENDED JD_116_BLOCKE.e2[55]Plan · PDF16 May 2023View
Block A Elevations AMENDED JD_116_BLOCKA.e_Rev A[84]Plan · PDF16 May 2023View
Block C elevations AMENDED JD_116_BLOCKC.e_Rev A[94]Plan · PDF16 May 2023View
Tracking planPlan · PDF16 May 2023View
Block E floorplans AMENDED JD_116_BLOCKE.p[72]Plan · PDF16 May 2023View
Block E north and west elevations AMENDED JD_116_BLOCKE.e1[40][22]Plan · PDF16 May 2023View
Block C floor plans AMENDED JD_116_BLOCKC.p_Rev A[63]Plan · PDF16 May 2023View
Block B Elevations AMENDED JD_116_BLOCKB.e_Rev A[58]Plan · PDF16 May 2023View
Block B floorplans AMENDED JD_116_BLOCKB.p_Rev A[87]Plan · PDF16 May 2023View
Block D south and east elevations AMENDED JD_116_BLOCKD.e2_Rev A[13]Plan · PDF16 May 2023View
Block D north and west elevations AMENDED JD_116_BLOCKD.e1_Rev A[83]Plan · PDF16 May 2023View
Block A floorplans AMENDED JD_116_BLOCKA.p_Rev A[90]Plan · PDF16 May 2023View
Block D floorplans AMENDED JD_116_BLOCKD.p_Rev APlan · PDF16 May 2023View
Contaminated Land commentsConsultation Response · PDF12 May 2023View
Letter Report on Badgers - East Horton Business Park-FINAL RedactedSupporting Documents · PDF12 May 2023View
Landscape Officer commentsConsultation Response · PDF12 May 2023View
Response to Drainage Comments from EBC Ecologist RedactedDrainage Report · PDF12 May 2023View
UPDATED Noise Impact Assessment_RedactedSupporting Documents · PDF11 May 2023View
Planning Policy CommentsConsultation Response · PDF4 May 2023View
Urban Design Officer comments Land East of Knowle LaneConsultation Response · PDF28 Apr 2023View
Drainage Details SectionsDrainage Plan · PDF26 Apr 2023View
Construction details filter bed Swale Plan 2Drainage Plan · PDF26 Apr 2023View
Landscape and Visual Impact Appraisal · PDF26 Apr 2023View
Adoptable Drainage PlanDrainage Plan · PDF26 Apr 2023View
Southern Water mapConsultation Response · PDF18 Apr 2023View
Southern Water commentsConsultation Response · PDF18 Apr 2023View
Natural England commentsConsultation Response · PDF11 Apr 2023View
Environmental Health comments - PollutionConsultation Response · PDF11 Apr 2023View
Hampshire Highway commentsConsultation Response · PDF6 Apr 2023View
Consultation response from Economic DevelopmentConsultation Response · PDF6 Apr 2023View
Southampton Airport commentsConsultation Response · PDF5 Apr 2023View
Fair Oak and Horton Heath Parish Council commentsConsultation Response · PDF5 Apr 2023View
HCC Flood and Water commentsConsultation Response · PDF4 Apr 2023View
Amended Ecology response 3 4 23 for F 23 94668 Land east of Knowle LaneConsultee Response · PDF3 Apr 2023View
Tree Officer commentsConsultation Response · PDF30 Mar 2023View
Archaeologist comments no objectionConsultation Response · PDF17 Mar 2023View
Drainage Assessment Report RedactedDrainage Report · PDF16 Mar 2023View
Drainage PlanDrainage Plan · PDF16 Mar 2023View
Environmental Impact Assessment Screening Opinion 100323 · PDF10 Mar 2023View
Ecological Statement - East Horton Business Park RedactedSupporting Documents · PDF9 Mar 2023View
Marketing Report RedactedSupporting Documents · PDF1 Mar 2023View
NE Annex AConsultation Response · PDF27 Feb 2023View
Elevation PlansElevations Plan · PDF3 Feb 2023View
Elevation & Floor PlansElevations And Floor Plan · PDF3 Feb 2023View
2020 letter amended developmentSupporting Documents · PDF3 Feb 2023View
Elevation PlansElevations Plan · PDF3 Feb 2023View
Air Quality Assessment-_RedactedAir Quality Report · PDF3 Feb 2023View
Proposed Site Layout PlanSite Layout Plan · PDF3 Feb 2023View
Floor Plans Block BFloor Plan · PDF3 Feb 2023View
Detailed quantitative gas risk assessment_RedactedSupporting Documents · PDF3 Feb 2023View
Transport StatementTransport Assessment · PDF3 Feb 2023View
Site Location PlanSite Layout Plan · PDF3 Feb 2023View
Elevation PlansElevations Plan · PDF3 Feb 2023View
Remediation method statementSupporting Documents · PDF3 Feb 2023View
Landscape PlanLandscape Plan · PDF3 Feb 2023View
Arboricultural Implication AssessmentSupporting Documents · PDF3 Feb 2023View
Covering Letter_RedactedCorrespondence Incoming · PDF3 Feb 2023View
Application Form RedactedApplication Form · PDF3 Feb 2023View
Floor Plan Block CFloor Plan · PDF3 Feb 2023View
Floor PlansFloor Plan · PDF3 Feb 2023View
PDAS January 2023Design And Access Statement · PDF3 Feb 2023View
2022 letter amended developmentSupporting Documents · PDF3 Feb 2023View
Updated Ecological Enhancement & ManagementSupporting Documents · PDF3 Feb 2023View
Ecology StatementReport - Other · PDF25 May 2020View
Construction detailPlan · PDF5 Sept 2018View
Piling Risk AssessmentReport - Other · PDF5 Apr 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
Discharge of condition 10 and compliance condition 17 East Horton Business Park 210524 East Horton Business Park discharge of Condition 7 141223 Condition 4 Discharge 141123 Decision Notice F_23_94668 Decision notice informative leaflet - PERMIT
Planning conditions
  1. Implementation timeframe The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. Plan numbers The development hereby permitted shall be implemented in accordance with the following plans numbered: • Location Plan, Promap 1:2500 • SL.01 Rev. E (Proposed Site Layout) • SL.02 (Proposed Site Layout Block Plan) • BLOCKA.e Rev. A (Block A elevations) • BLOCKA.p Rev. A (Block A floor plans) • BLOCKB.e Rev. A (Block B elevations) • BLOCKB.p Rev. A (Block B floor plans) • BLOCKC.e Rev. A (Block C elevations) • BLOCKC.p Rev. A (Block C floor plans) • BLOCKD.p Rev A (Block D floorplans) • BLOCKD.e1 Rev A (Block D north and west elevations) • BLOCKD.e2 Rev A (Block D south and east elevations) • BLOCKE.p (Block E floorplans) • BLOCKE.e1 (Block E north and west elevations) • BLOCKE.e2 (Block E east and south elevations) • NJC-001 Rev. B (Vehicle tracking plan) Reason: For the avoidance of doubt and in the interests of proper planning.
  3. CEMP No development shall start on site until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority, which shall include: a) A programme of and phasing of construction work; b) The provision of long term facilities for contractor parking; c) The arrangements for deliveries associated with all construction works; d) Vehicle routing plan; e) Methods of construction works; f) Access and egress for plant and machinery; g) Protection of pedestrian routes during construction; h) Location of temporary site buildings, compounds, construction material and plant storage areas; i) Details of the methodology for ensuring dirt is not transferred onto the highway from the site (i.e. wheel washers), and onwards mitigation should this fail; j) Measures to minimise dust, noise and vibration; k) Precautionary measures for the protection of commuting badgers as set out in the letter from ecosupport dated 11 May 2023; l) Measures to prevent pollution from surface water run-off during construction; m) Methods for protecting the SINC and boundary habitats as per the principles set out in the Ecological Statement prepared by Ecosupport dated 6 March 2023; n) Details of external lighting. Construction work shall only take place in accordance with the approved CEMP. Reason: In order that the Local Planning Authority can properly consider the effect of the works on the amenity of the locality, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016 – 2036).
  4. Contaminated land No development, including demolition, shall take place until the following has been submitted to, and approved in writing by the Local Planning Authority: a) A site investigation report for the south-east side of the site not previously investigated, documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the desk study; b) A detailed site specific scheme for remedial works for the whole site, and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed and proposals for future maintenance and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Investigations, assessments and reports are to be undertaken by a competent person and should comply with UK Land Contamination Risk Management (LCRM) national guidance including BS10175:2011+A2:2017 Investigation of potentially contaminated sites – Code of Practice, and gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS8485:2015+A1:2019, Claire RB17 and CIRCIA C665 unless otherwise agreed with the Local Planning Authority. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  5. Contaminated land verification The development hereby permitted shall not be occupied / brought into use until there has been submitted to the LPA verification by the competent person approved under the provisions of condition 4(b) that any remediation scheme required and approved under the provisions of condition 4(b) has been implemented fully in accordance with the approved details (unless varied with the written permission of the LPA in advance of implementation). Unless agreed in writing with the LPA such verification shall accord with UK Land Contamination Risk Management (LCRM) national guidance. Typically such a report would comprise: • A description of the site and its background, and summary of relevant site information, • a description of the remediation objectives and remedial works carried out; • verification data, including sample locations/analytical results, as built drawings of the implemented scheme, photographs of the remediation works in progress, etc. • Certificates demonstrating that imported and / or material left in situ is free from contamination, gas / vapour membranes have been installed correctly. Thereafter the scheme shall be monitored and maintained in accordance with the scheme approved under condition 4(b)” Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors, in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  6. Unsuspected contamination All development shall be stopped immediately in the event that contamination not previously identified is found to be present on the development site and details of the contamination shall be reported immediately in writing to the Local Planning Authority (LPA). Development shall not re-start on site until the following details have then been submitted to and approved in writing by the LPA:- (a) a written report of the findings which includes, a description of the extent, scale and nature of contamination, an assessment of all potential risks to known receptors, an update of the conceptual site model (devised in the desktop study), identification of all contaminant linkages and unless otherwise agreed in writing by the LPA and identified as unnecessary in the written report, an appraisal of remediation options and proposal of the preferred option(s) identified as appropriate for the type of contamination found on site. and (unless otherwise first agreed in writing by the LPA), (b) a detailed remediation scheme designed to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment. The scheme should include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works, site management procedures and a verification plan outlining details of the data to be collected in order to demonstrate the completion of the remediation works and any arrangements for the continued monitoring of identified contaminant linkages; and (c) before any part of the development is occupied or used (unless otherwise first agreed in writing by the LPA) a verification report demonstrating the effectiveness of the remediation works carried out and a completion certificate confirming that the approved remediation scheme has been implemented in full shall both have been submitted to and approved in writing by the LPA. The above site works, details and certification submitted shall be in accordance with the approved scheme and undertaken by a competent person in accordance with best practice as outlined in BS10175:2011+A2:2017 and LCRM. Any gas monitoring deemed appropriate is to be in accordance with best practice as outlined in such documents as BS8576:2013, BS 8485:2015+A1:2019, Claire RB17 and CIRIA C665. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors in accordance with Policy DM8 of the Eastleigh Borough Local Plan (2016-2036).
  7. Employment and Skills Plan No development shall commence until an Employment and Skills Plan (ESP) has been submitted to and approved in writing by the Local Planning Authority. The ESP shall be fully complied with during the construction phase unless otherwise agreed in writing by the Local Planning Authority. Reason: To provide employment and skills development opportunities as a result of the development, in accordance with Policy DM16 of the Eastleigh Borough Local Plan (2016-2036).
  8. Protection of public water apparatus No development shall commence until measures for the protection of the public water supply main have been submitted to and approved in writing by the Local Planning Authority, in consultation with Southern Water. The development shall then be carried out in accordance with the approved details. Reason: To ensure adequate protection of public water apparatus, in accordance with Policy DM6 of the Eastleigh Borough Local Plan (2016-2036).
  9. Drainage Notwithstanding the details submitted with the application, no development shall commence on site until a detailed foul and surface water drainage scheme for the site, based on the principles within the Addendum Drainage Assessment Report (Cowan Consultancy, March 2023, ref. EG/393640/EG), has been submitted to and approved in writing by the Local Planning Authority. The submitted details shall include: - A technical summary highlighting any changes to the design from that within the submitted Drainage Assessment Report; - Detailed drainage plans to include type, layout and dimensions, including long sections and cross sections along the flow path, of drainage features including references to link to the drainage calculations; - Detailed drainage calculations to demonstrate existing runoff rates are not exceeded and there is sufficient attenuation for storm events up to and including 1:100 + 40% for climate change; - Confirmation that sufficient water quality measures including filtration have been included to satisfy the methodology in the Ciria SuDS Manual C753 and DM6; - Assessment of pollution and sedimentation risks to controlled water; - Exceedance plans demonstrating the flow paths and areas of ponding in the event of blockages or storms exceeding design criteria. The drainage scheme must thereafter be implemented in accordance with the approved details. Reason: To ensure satisfactory drainage for the development to reduce flood risk and to minimise pollution, in accordance with Policy DM6 of the Eastleigh Borough Local Plan (2016-2036).
  10. Drainage maintenance Prior to first occupation of the development, details for the long term maintenance of the surface water drainage system shall be submitted to and approved in writing by the Local Planning Authority. The submitted details shall include: - Maintenance schedules for each drainage feature type and ownership; - Details of protection measures. The drainage system shall thereafter be maintained in accordance with the approved details. Reason: To ensure long term management of the drainage system to protect against flood risk and water pollution, in accordance with Policy DM6 of the Eastleigh Borough Local Plan (2016-2036).
  11. Materials Prior to any development above foundation / slab level, full details including samples where requested, of the proposed external materials for the buildings and hard surfacing, shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details. Reason: To ensure a high quality design in the interest of visual amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  12. Landscaping a. Notwithstanding the details shown on the submitted Landscape Layout Plan ref. 3046-GA-001 Rev. A, no development above foundation/slab level shall take place until a fully detailed soft landscaping and planting scheme (to 1:200 scale) has been submitted to and approved in writing by the Local Planning Authority. The landscaping plan shall include details / positions of underground and above ground services and required easements, and the planting scheme shall specify species, density, planting, size and layout. b. The approved landscaping scheme shall be carried out in the first planting season following occupation of the development, or completion of the development (whichever is sooner), and shall thereafter be retained. c. If, within a period of 10 years after planting any tree or plant is removed, dies or becomes, in the opinion of the Local Planning Authority, seriously damaged, defective or diseased, another tree or plant of the same species and size as that originally approved shall be planted at the same place within the next planting season, unless the Local Planning Authority gives its written consent to any variation. Reason: To ensure a high quality landscape scheme in the interest of visual amenity and biodiversity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  13. Boundary treatment Prior to any development above foundation / slab level, full details of boundary treatments shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out in accordance with the approved details. Reason: To ensure a high quality design in the interest of visual amenity, in accordance with Policy DM1 of the Eastleigh Borough Local Plan (2016-2036).
  14. Building Insulation The buildings hereby permitted shall be constructed to meet the sound insulation performance requirements set out within the Noise Impact Assessment prepared by 24 Acoustics (12 December 2022, ref. R9791-1 Rev 2), unless alternative details are first submitted to and approved in writing by the Local Planning Authority. Reason: To protect nearby residents and workers from adverse noise impacts in accordance with Policies DM1 and DM8 of the Eastleigh Borough Local Plan (2016-2036).
  15. External Plant noise limits Prior to installation of any external plant or equipment, full details shall first be submitted to and approved in writing by the Local Planning Authority. All external plant and equipment shall be designed to ensure that the following noise limits are achieved: • Daytime (07:00-23:00): 38 dB LAr 1hr • Night-time (23:00-07:00): 36 dB LAr 15min Reason: To protect nearby residents and workers from adverse noise impacts in accordance with Policies DM1 and DM8 of the Eastleigh Borough Local Plan (2016-2036).
  16. Operational Noise Management Plan Prior to any works above foundation / slab level, a Noise Management Plan for operation and management purposes shall be submitted to and approved in writing by the Local Planning Authority. This shall include: details of times and frequencies of deliveries and collections; vehicle movements, reversing methods and types of reversing alarms; location of loading bays; quiet loading/unloading measures; and all other relevant noise controls, attenuating features or operating practices. The development shall thereafter be operated in accordance with the approved Plan. Reason: To protect nearby residents and workers from adverse noise impacts in accordance with Policies DM1 and DM8 of the Eastleigh Borough Local Plan (2016-2036).
  17. Vehicle parking Prior to first use of the development hereby permitted, the vehicle parking spaces shown on the approved plans shall be provided and shall thereafter be retained for vehicle parking only. Reason: To ensure adequate parking in the interest of highway safety, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  18. Commercial Vehicle Access Plan Prior to first use of the development hereby permitted, a Commercial Vehicle Access Plan shall be submitted to and approved in writing by the Local Planning Authority, in conjunction with Hampshire County Council Highway Authority. The plan must include: • An HGV and commercial vehicle routing plan in and out of the site; • Agreement that HGV’s and commercial vehicles will not access the site from the southern end of Knowle Lane; and • Agreement that HGV’s and commercial vehicles will not egress the site in the direction of the southern end of Knowle Lane. Reason: In the interest of highway safety and amenity of residents to the south of the site, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  19. Biodiversity enhancement The development shall incorporate biodiversity enhancement measures as set out in the recommendations of the Ecological Statement prepared by Ecosupport dated 6 March 2023, unless alternative measures are first submitted to and agreed in writing by the Local Planning Authority. Reason: To achieve biodiversity net gain in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  20. External lighting External lighting shall be installed and retained in accordance with the approved Lighting Strategy prepared by DFL, ref. 2888 P03 and Plan ref. 13001-S3 P02, dated 12/06/2023, unless alternative details are first submitted to and agreed in writing by the Local Planning Authority. The lighting shown on the southern elevations of Blocks D and E shall strictly be for emergency use only. Reason: In the interest of visual amenity and to protect commuting and foraging bats in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  21. BREEAM Within 3 months following occupation of the building, a report demonstrating how the development meets the relevant BREEAM requirements including a New Construction Post Construction certificate at ‘excellent’ standard, shall be submitted to and approved in writing by the local Planning Authority. Reason: To ensure that the development meets required sustainability standards in accordance with Policy DM2 of the Eastleigh Borough Local Plan (2016-2036).
  22. SINC Enhancement and Management The Site of Importance for Nature Conservation (SINC) shall be enhanced, managed and monitored in accordance with the details and timeframes set out within the Updated Ecological Enhancement & Management Plan (ecosupport, December 2022), unless alternative details are first submitted to and approved in writing by the Local Planning Authority. Reason: To secure the long term protection of the SINC in accordance with Policy DM11 of the Eastleigh Borough Local Plan (2016-2036).
  23. Cycle storage Prior to first use of the development hereby permitted, secure cycle storage facilities for staff shall be provided in accordance with details that have first been submitted to and approved in writing by the Local Planning Authority. The cycle storage facilities shall thereafter be retained for cycle storage only, in accordance with the approved details. Reason: To encourage the use of alternative means of transport to the private car, in accordance with Policy DM13 of the Eastleigh Borough Local Plan (2016-2036).
  24. B2 use restriction Notwithstanding the provisions of Schedule 2, Part 3, Class I of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), the units hereby permitted shall be occupied for B2 General Industrial purposes only, and shall not be used for B8 storage and distribution without the prior permission of the Local Planning Authority through submission of a formal planning application. Reason: In the interest of highway safety and to protect local amenity in accordance with Policies DM8 and DM13 of the Eastleigh Borough Local Plan (2016-2036).
  25. Note to applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  26. Note to applicant: Should a crane be required during development, please refer to CAP 1096 Guidance to crane users on the crane notification process and obstacle lighting and marking.
  27. Note to applicant: An application for connection to the public sewer will need to be made to Southern Water. To make an application, please visit Southern Water’s Get Connected service: https://developerservices.southernwater.co.uk/
  28. Note to applicant: Further biodiversity enhancement measures that could be considered for the site include additional bat boxes, and planting for pollinators that provide seeds, nuts and berries.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.