Council planning record

Proposed erection of a terraced two-storey commercial [Use Class E(g) & B8] building.

UNIT 5, BROOKWOOD INDUSTRIAL ESTATE, BROOKWOOD AVENUE, EASTLEIGH, SO50 9EY

Decided PermitReference: F/23/94640Eastleigh Borough Council

Last published check: 8 Oct 2026, 11:09. Check the council record for more recent changes.

Application location

UNIT 5, BROOKWOOD INDUSTRIAL ESTATE, BROOKWOOD AVENUE, EASTLEIGH, SO50 9EY

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
31 Jan 2023
Validated
10 Feb 2023
Determination deadline
26 May 2023
Local authority
Eastleigh Borough Council

Application overview

Proposed erection of a terraced two-storey commercial [Use Class E(g) & B8] building.

Proposal details

Reference
F/23/94640
Alternative references
11824113
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP
Agent
Robert Tutton Town Planning Consultants Ltd. (Robert Tutton)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 18 of 18

DocumentPublishedAction
F_23_94640 PL_Final DecisionDecision Notice · PDF26 May 2023View
F_23_94640 Delegated Officer ReportOfficer Report · PDF25 May 2023View
AMENDED - Existing Parking PlanPlan · PDF12 Apr 2023View
AMENDED - Proposed Parking PlanPlan · PDF12 Apr 2023View
HighwaysConsultee Response28 Feb 2023View
Trees - Unit 5Consultee Response · PDF28 Feb 2023View
Environmental Health - Unit 5Consultee Response · PDF27 Feb 2023View
Hampshire HighwaysConsultee Response · PDF22 Feb 2023View
Street SceneConsultee Response14 Feb 2023View
Existing Floor Plan - Unit 5Floor Plan · PDF31 Jan 2023View
Arboricultural Impact Appraisal, Method Statement and Tree Protection PlanTree Info · PDF31 Jan 2023View
ApplicationFormRedacted.pdfApplication Form · PDF31 Jan 2023View
Proposed ElevationsElevations Plan · PDF31 Jan 2023View
Location planLocation Plan · PDF31 Jan 2023View
Existing Elevations - Unit 5Elevations Plan · PDF31 Jan 2023View
Proposed Site PlanSite Layout Plan · PDF31 Jan 2023View
Planning Design and Access Statement.pdfDesign And Access Statement · PDF31 Jan 2023View
Proposed Ground & First Floor PlansFloor Plan · PDF31 Jan 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_23_94640 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: S5207_01B, S5207_02B, S5207_03A, S5207_04D, S5207_04J, S5207_05D, S5207_06 & S5207_07C. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the adjoining industrial unit. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
  4. No construction or demolition work shall start until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by demolition and construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise and vibration from demolition and construction activities [including details of any piling]; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]. Reason: To limit the impact the development has on the amenity of the locality.
  5. The development must accord with the arboricultural report reference AIA/AMS-KC/BROOKWOOD/001. No excavation, demolition or development related works shall commence until the tree protection measures have been installed as per the tree protection plan contained within the report. Once installed, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the protected area. Tree protection measures shall be retained in their approved form for the duration of the work and may only be modified subject to written agreement from the LPA. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  6. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Public Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  7. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  8. The development hereby permitted shall not be brought into use until the areas shown on the approved plans for the parking of vehicles shall have been made available, surfaced and marked out. The parking areas shall then be permanently retained and reserved for that purpose at all times. Reason: To make provision for off street parking for the purpose of highway safety.
  9. The development hereby approved shall be used only for purposes within Class E(g) iii) [any industrial process, (which can be carried out in any residential area without causing detriment to the amenity of the area)], and/or Class B8 [storage and distribution] of the schedule to the Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020, or in any provision equivalent to those Classes in any statutory instrument revoking and re-enacting that Order with or without modification and for no other purposes. Reason: In the interests of highway safety and local amenity.
  10. No machinery shall be operated, no process shall be carried out and no deliveries taken at or despatched from the site outside the following times 07:00-21:00 hours Monday to Saturday nor at any time on Sundays, Bank or Public Holidays. Reason: To protect the amenities of occupiers of nearby dwellings.
  11. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  12. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.