Council planning record

Replacement modular building over two-storeys with associated car parking and fencing and removal of live fire training metal container units (revised scheme to planning permission F/20/88055).

HAMPSHIRE FIRE AND RESCUE SERVICE HEADQUARTERS, LEIGH ROAD, EASTLEIGH, SO50 9SJ

Decided PermitReference: F/22/93703Eastleigh Borough Council

Application location

HAMPSHIRE FIRE AND RESCUE SERVICE HEADQUARTERS, LEIGH ROAD, EASTLEIGH, SO50 9SJ

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
25 Aug 2022
Validated
25 Aug 2022
Determination deadline
20 Oct 2022
Local authority
Eastleigh Borough Council

Application overview

Replacement modular building over two-storeys with associated car parking and fencing and removal of live fire training metal container units (revised scheme to planning permission F/20/88055).

Proposal details

Reference
F/22/93703
Alternative references
11441041
Ward
Eastleigh Central Ward
Parish
Eastleigh Town CP
Agent
Hampshire County Council (Ms Katherine Snell)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 30 of 30

DocumentPublishedAction
F_22_93703 PL_Final DecisionDecision Notice · PDF5 Dec 2022View
Delegated Officer ReportOfficer Report · PDF2 Dec 2022View
Further Ecology ResponseConsultee Response · PDF28 Nov 2022View
Additional Information from Agent on Ecology, Drainage and Air QualitySupporting Info · PDF21 Nov 2022View
AMENDED Proposed Temporary Parking PlanPlan · PDF21 Nov 2022View
UPDATED Ecology Desk Based Report Rev2Ecological Assessment · PDF21 Nov 2022View
Proposed Drainage LayoutDrainage Plan · PDF21 Nov 2022View
Ecology response for F 22 93703 HAMPSHIRE FIRE AND RESCUE SERVICEConsultee Response · PDF26 Oct 2022View
Network RailConsultee Response · PDF12 Oct 2022View
Hampshire County Council HighwaysConsultation Response · PDF5 Oct 2022View
Southern WaterConsultation Response · PDF28 Sept 2022View
Southampton AirportConsultation Response26 Sept 2022View
Tree OfficerConsultee Response · PDF23 Sept 2022View
Proposed Elevations PlanElevations And Floor Plan · PDF25 Aug 2022View
HFRS Police Transport Statement_RedactedTransport Assessment · PDF25 Aug 2022View
Proposed Elevations PlanElevations Plan · PDF25 Aug 2022View
Drainage PlanDrainage Plan · PDF25 Aug 2022View
SUPERSEDED Ecology AssessmentEcological Assessment · PDF25 Aug 2022View
Planning StatementPlanning Statement · PDF25 Aug 2022View
Proposed Floor PlanFloor Plan · PDF25 Aug 2022View
Application Form RedactedApplication Form · PDF25 Aug 2022View
SUPERSEDED Proposed Temp ParkingPlan · PDF25 Aug 2022View
Proposed Elevations PlanElevations And Floor Plan · PDF25 Aug 2022View
Travel Plan Update_RedactedSupporting Documents · PDF25 Aug 2022View
Proposed Elevations PlanElevations Plan · PDF25 Aug 2022View
Block and Location Plans.pdfLocation Plan · PDF25 Aug 2022View
Sustainability ReportReport - Other25 Aug 2022View
Proposed Site and Location PlansPlans · PDF25 Aug 2022View
Arboricultural Impact AssessmentTree Info · PDF19 Jun 2017View
Supporting Documents (1895995)Supporting Documents · PDF16 Mar 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source

Decision & conditions

Permit
F_22_93703 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: E05246-HCC-ZZ-DR-B-1500-P1-00, EO5246-HCC-ZZ-DR-B-2230-P1-00, E05246-HCC-ZZ-DR-B-3001-P2-00, E05246-HCC-ZZ-DR-B-3002-P1-00, E05246-HCC-ZZ-DR-B-2220-P1-00, E05246-HCC-ZZ-DR-B-7006-P2-00, E05246-HCC-ZZ-DR-B-1000-P1-00, E05246-HCC-ZZ-DR-B-7700-P1-00, E05246-HCC-ZZ-DR-B-2200-P7-00, PJT10307-WML-122-XX-D-C-1001-P02. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The materials to be used in the external surfaces of the development shall match as closely as possible, in type, colour and texture to those listed in the 'Materials' section of the application form. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
  4. Prior to the building being brought into use, a minimum of 2no. bird and/or bat boxes for breeding and roosting shall be installed on the building hereby approved and shall thereafter be retained. Reason: To enhance the site for biodiversity in accordance with the provisions of national planning policy.
  5. The development hereby permitted shall not be brought into use until the temporary parking provision as shown on approved drawing reference E05246-HCC-ZZ-DR-B-7006-P2-00 for the parking of vehicles associated with the development has been made available, surfaced and marked out. Unless otherwise agreed in writing with the Local Planning Authority, the full permanent parking provision for the development as shown on approved drawing reference E05246-HCC-ZZ-DR-B-1500-P1-00 shall then be made available, surfaced and marked out within 3 months of the development being brought into use and this shall thereafter be permanently retained and reserved for that purpose at all times. Reason: To make provision for adequate off-road parking to serve the development in the interests of highway safety.
  6. Unless otherwise agreed in writing with the Local Planning Authority, within 3 months of the development being brought into use the cycle parking as shown on approved drawing number: E0546-HCC-ZZ-DR-B-1500-P1-00 shall be installed and made available for use. This shall then be permanently retained for the purpose of providing secure bicycle storage for staff and visitors to the approved office premises. Reason: In the interests of encouraging the use of sustainable modes of travel.
  7. The sustainability measures for the development which are set out within the submitted Sustainability and BREEAM Report (August 2022) shall be carried out in accordance with the recommendations of the document. Reason: In the interests of achieving sustainable development and reducing the impacts of the proposals on the environment.
  8. The 'Avoidance measures' as set out within Section 5.8 of the submitted Ecological Desk-Based Assessment (Hampshire County Council Ecology Team, dated August 2022 and Updated November 2022) shall be carried out in full for the duration of the construction works. Reason: To prevent harm to reptiles and their habitat.
  9. The measures, actions and monitoring provisions that are set out within the Travel Plan produced for the Hampshire Joint Services Headquarters by Scott White and Hookins (2017) shall also apply to the development hereby approved. Reason: To encourage the use of sustainable modes of transport in the interests of minimising the impacts of the development on the environment.
  10. The development hereby approved shall be used only for office purposes within Class Eg(i) of the schedule to the Town and Country Planning [Use Classes] Order 1987, [or in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification] and for no other purposes. Reason: In the interests of highway safety, local amenity and ensuring the retention of an appropriate employment use on the site.
  11. In the event that previously unidentified contamination is found when carrying out the approved development it must be immediately reported to the Environmental Health Unit. Work shall then cease until an investigation and risk assessment and, where required, a remediation scheme has been submitted to and approved in writing by the Local Planning Authority. Where a remediation scheme is required, the development shall not be brought into use until a completion certificate for the remediation work has been submitted to and approved in writing by the Local Planning Authority. Reason: To minimise the risk from land contamination for the safety of the occupiers of the development.
  12. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  13. Note to Applicant: Southern Water have advised that a formal application for connection to the public sewerage system is required in order to service this development. For further advice, please contact Southern Water, Southern House, Yeoman Road, Worthing, West Sussex, BN13 3NX (Tel: 0330 303 0119). Website: www.southernwater.co.uk or by email at: developerservices@southernwater.co.uk
  14. Note to Applicant: Southern Water have advised that the applicant should be made aware that a wastewater grease trap should be provided on the kitchen waste pipe or drain installed and maintained by the owner or operator of the premises and that it should be noted that under the Water Industry Act 1991 it is an offence to throw, empty, turn or permit to be thrown or emptied or to pass into any drain or sewer connecting with a public sewer any matter likely to injure the sewer or drain or to interfere with the free flow of its contents.
  15. Note to Applicant: Southampton Airport have highlighted that given the nature of the proposed development it is possible that a crane may be required during construction. The applicant’s attention is therefore drawn to the requirement within CAP 1096 the Guidance to crane users on the crane notification process and obstacle lighting and marking.
  16. Note to Applicant: It is recommended that should any reptiles be found during the works and need to be relocated to the adjacent retained habitat that this be done under Ecological supervision or that operatives are given a toolbox talk by a suitably qualified Ecologist on the appropriate handling of slow worms in order to prevent injury occuring to the reptiles.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.