Council planning record

Erection of replacement dwelling

DERRY DACY, PEEWIT HILL, BURSLEDON, SOUTHAMPTON, SO31 8BL

Decided Refuse Planning Permission ForReference: F/22/93432Eastleigh Borough Council

Application location

DERRY DACY, PEEWIT HILL, BURSLEDON, SOUTHAMPTON, SO31 8BL

This record has no verified map location.

Application summary

Status
Decided Refuse Planning Permission For
Application type
Full planning
Received
14 Jul 2022
Validated
27 Jul 2022
Determination deadline
21 Sept 2022
Local authority
Eastleigh Borough Council

Application overview

Erection of replacement dwelling

Proposal details

Reference
F/22/93432
Alternative references
11401569
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
Vivid Design Studio Ltd (Mr Philip Dudley)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
F_22_93432 PL_Final DecisionDecision Notice · PDF6 Sept 2022View
F_22_93432 Delegated Officer ReportOfficer Report · PDF6 Sept 2022View
Ecology Response amended for F 22 93432 DERRY DACY, PEEWIT HILL, BURSLEDONConsultee Response31 Aug 2022View
Ecology Response for F 22 93432 DERRY DACY, PEEWIT HILL, BURSLEDONConsultee Response18 Aug 2022View
HCC Response_F-22-93432Consultation Response · PDF16 Aug 2022View
Location PlanLocation Plan · PDF27 Jul 2022View
Existing Elevation Floor & Roof PlansPlans · PDF27 Jul 2022View
Proposed Drainage PlanDrainage Plan · PDF27 Jul 2022View
Proposed Site Plan-A1 SHEETSite Layout Plan · PDF14 Jul 2022View
Application Form RedactedApplication Form · PDF14 Jul 2022View
Block Plan-A3 SHEETBlock Plan · PDF14 Jul 2022View
Design and Access StatementSupporting Documents · PDF14 Jul 2022View
Proposed Floor Plans-A1 SHEETFloor Plan · PDF14 Jul 2022View
Proposed Plans and Elevations-A1 SHEETElevations Plan · PDF14 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refuse Planning Permission For
F_22_93432 PL_Final Decision
Planning conditions
  1. The proposals, owing to the combination of the ornate design, excessive massing, scale and size of the replacement dwelling would result in an unduly prominent and visually obtrusive form of development which would have an unacceptably urbanising and increased physical and visual impact upon this area of designated countryside, to the detriment of its prevailing character. The application is therefore contrary to Policies S5, DM1 and DM26 of the Eastleigh Borough Local Plan 2016-2036
  2. Insufficient information has been provided to demonstrate that the proposed development will not cause adverse harm to the biodiversity interests of the site and species (such as nesting birds, common lizards, badgers, and bats) which are protected by virtue of the Wildlife and Countryside Act (1981) (as amended) and the Conservation of Habitats and Species Regulations (2017) (as amended). The proposals are therefore contrary to Policy DM11 of the Eastleigh Borough Local Plan 2016-2036.
  3. Insufficient information has been provided to demonstrate a Biodiversity Net Gain and as such is contrary to Policy DM11 of the Eastleigh Borough Local Plan 2016-2036
  4. Note to Applicant: The application was refused following the assessment of the following plans: 01 Rev A, 02, 03, 04, 05, 06, and 07. In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.