Construction of 1no. two bedroom detached dwelling and detached carport

59 POUND ROAD, BURSLEDON, SOUTHAMPTON, SO31 8FF

Decided PermitReference: F/22/93356Eastleigh Borough Council

Application location

59 POUND ROAD, BURSLEDON, SOUTHAMPTON, SO31 8FF

This record has no verified map location.

Application summary

Status
Decided Permit
Application type
Full planning
Received
1 Jul 2022
Validated
21 Jul 2022
Determination deadline
5 May 2023
Local authority
Eastleigh Borough Council

Application overview

Construction of 1no. two bedroom detached dwelling and detached carport

Proposal details

Reference
F/22/93356
Alternative references
11358854
Ward
Bursledon & Hound North Ward
Parish
Bursledon CP
Agent
Porter Robson (Mr James Porter)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 28 of 28

DocumentPublishedAction
F_22_93356 PL_Final DecisionDecision Notice · PDF4 May 2023View
F_22_93356 Delegated Officer ReportOfficer Report · PDF2 May 2023View
Legal Receipt BUR140Legal Agreement Supporting Info · PDF2 May 2023View
Natural EnglandConsultee Response · PDF2 Nov 2022View
59 Pound Rd - Solent-Nutrient-Budget-Calculator-Version-2-21.04.22 (1)Other27 Sept 2022View
F_22_93356 - HRA - 59 Pound Rd - Sept 2022Other · PDF27 Sept 2022View
Environmental Health - 59 Pound RdConsultee Response · PDF23 Sept 2022View
EcologyConsultee Response22 Sept 2022View
AMENDED Proposed Site PlanSite Layout Plan · PDF12 Sept 2022View
AMENDED Proposed Car PortPlan · PDF12 Sept 2022View
AMENDED Proposed First Floor PlanFloor Plan · PDF12 Sept 2022View
AMENDED Proposed Ground Floor PlanFloor Plan · PDF12 Sept 2022View
AMENDED Proposed ElevationsElevations Plan · PDF12 Sept 2022View
AMENDED Proposed Roof PlanRoof Plan · PDF12 Sept 2022View
AMENDED Location and Block PlanLocation Plan · PDF21 Jul 2022View
SUPERSEDED Proposed Site PlanSite Layout Plan · PDF21 Jul 2022View
AMENDED Existing Site PlanSite Layout Plan · PDF21 Jul 2022View
SUPERSEDED Existing Site PlanSite Layout Plan · PDF1 Jul 2022View
Attachment SummarySupporting Documents · PDF1 Jul 2022View
Planning Supporting Statement - Land to the Rear 59 Pound LaneSupporting Documents · PDF1 Jul 2022View
SUPERSEDED Proposed ElevationsElevations Plan · PDF1 Jul 2022View
Application Form RedactedApplication Form · PDF1 Jul 2022View
SUPERSEDEDLocation and Block PlanPlan · PDF1 Jul 2022View
SUPERSEDED Proposed Car PortPlan · PDF1 Jul 2022View
SUPERSEDED - Proposed Ground Floor PlanPlan · PDF1 Jul 2022View
SUPERSEDED Proposed First Floor PlanPlan · PDF1 Jul 2022View
SUPERSEDED Proposed Site PlanSite Layout Plan · PDF1 Jul 2022View
SUPERSEDED Proposed Roof PlanPlan · PDF1 Jul 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permit
F_22_93356 PL_Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: 1029-PRA-NB-00-DR-A-1100-C, 1029-PRA-NB-00-DR-A-1101-C, 1029-PRA-NB-00-DR-A-1111-E, 1029-PRA-NB-00-DR-A-1130-D, 1029-PRA-NB-M1-DR-A-1131-D, 1029-PRA-NB-RF-DR-A-1132-C, 1029-PRA-NB-XX-DR-A-1210-D & 1029-PRA-NB-XX-DR-A-1250-B. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. The development hereby permitted shall not be commenced for a period of at least 21 days from the date of the decision. Reason: To comply with Section 28I(6) of the Wildlife and Countryside Act 1981 (as amended) as this permission is being granted otherwise than in accordance with the advice of Natural England.
  4. No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway and shared driveway; c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); f) provision for storage, collection, and disposal of rubbish from the development during construction period; g) measures to prevent mud and dust on the highway during demolition and construction; h) temporary lighting; and i) protection of routes to neighbouring properties during construction. Reason: To limit the impact the development has on the amenity of the locality
  5. No development shall start until details of a sustainable drainage system have been submitted to and approved in writing by the local planning authority. The details shall include a timetable for its implementation and a management/ maintenance plan for the lifetime of the development. The system shall be implemented and thereafter managed and maintained in accordance with the approved details. Reason: To ensure satisfactory drainage for the development.
  6. No development above damp-proof course level shall start until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  7. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  8. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  9. No development above damp-proof course level shall start until details of the biodiversity enhancement features, which will be incorporated into the new building and/or the surrounding area, have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To maintain and enhance the value of the locality for biodiversity.
  10. No development above damp-proof course level shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping, including trees and boundary treatment, and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  11. All hard & soft landscaping, tree planting and boundary treatment shall be carried out in accordance with the approved details and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  12. All first floor windows on the side elevations shall either be: obscure glazed to Pilkingtons level 3 or equivalent with no opening parts less than 1.7 metres above the floor level of the rooms they serve; OR be positioned with their lower sill at least 1.7 metres above the floor of the room in which they are installed. Once installed the windows shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  13. The development hereby permitted shall not be occupied until a mitigation package addressing the additional nutrient inputs arising from the development has been submitted to, and approved in writing by, the Local Planning Authority. Such a mitigation package shall address all of the additional nutrient loading upon protected European sites from the development and shall allow the Local Planning Authority to ascertain on the basis of the best available scientific evidence that such additional nutrient loading will not have an adverse effect on the integrity of those European Sites, having regard to the conservation objectives for they are designated. The mitigation package shall be implemented in full and evidence of this provided to the Local Planning Authority in writing prior to first occupation of the development. Reason: To mitigate the nitrates impacts arising from the development upon the European protected Solent Complex in accordance with the requirements of the Conservation of Habitats and Species Regulations 2017.
  14. The development hereby approved shall not be occupied until the bin & cycle storage has been constructed in accordance with the approved details and thereafter retained and kept available. Reason: To ensure the adequate provision of on site facilities.
  15. The development hereby permitted shall not be occupied until the parking area has been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwelling house as a residence. Reason: To make provision for off street parking for the purpose of highway safety.
  16. Note to Applicant: In accordance with paragraph 38 of the National Planning Policy Framework (July 2021), Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  17. Note to Applicant: This planning permission does not convey the right for the development to encroach over, under or on land which is not within your ownership, without the consent of the landowner.
  18. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.