ApprovedCouncil status: Decided Permit

Construction of 2no. three bedroom and 3no. four bedroom detached dwellings with associated car parking and landscaping (revised design to F/16/79141)

Land at Glebe Court, Fair Oak, SO50 7BE

Eastleigh Borough CouncilReference F/17/80457Full planning

Last published check: 12 Nov 2026, 07:41. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 07:41 (UK)

  1. DoneReceived27 Apr 2017
  2. DoneValidated27 Apr 2017
  3. ClosedConsultationEnded 22 Jun 2017
  4. Date set by councilTarget decision date22 Jun 2017
  5. DecidedPermit14 Nov 2017

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Date

    Published milestoneCouncil source
Application type
Full planning
Ward
Fair Oak and Horton Heath
Parish
Fair Oak and Horton Heath CP
Documents
25 published

Proposal

Construction of 2no. three bedroom and 3no. four bedroom detached dwellings with associated car parking and landscaping (revised design to F/16/79141)

Reference
F/17/80457
Ward
Fair Oak and Horton Heath
Parish
Fair Oak and Horton Heath CP
Agent
Mr Ben Christian - Vail Williams LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • F_17_80457 Final DecisionDecision Notice14 Nov 2017View
  • F_17_80457 PL_Report DEL Planning ApplicationOfficer Report10 Nov 2017View
  • 150022_18A_proposedstreetscenes-A1 SHEETStreet Scene Plan7 Nov 2017View
  • 150022_17A_proposedplansandelevationsP5-A1 SHEETElevations And Floor Plan7 Nov 2017View
  • 150022_14A_proposedplansandelevationsP2-A1 SHEETElevations And Floor Plan7 Nov 2017View
  • Drawing Issue SheetPlans7 Nov 2017View
  • F 17 80457 - Land at Glebe Court Fair Oak Eastleigh SO50 7BE (Additional surveys) (2)Consultee Response4 Aug 2017View
  • Consultee ResponseConsultee Response22 Jun 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
F_17_80457 Final Decision
Planning conditions
  1. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby permitted shall be implemented in accordance with the following plans numbered: 5489/01, 150022/10, 150022/11, 150022/12, 150022/13, 150022/14A, 150022/15, 150022/17A, 150022/18A & 150022/19. Reason: For the avoidance of doubt and in the interests of proper planning.
  3. No development shall start until details of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  4. No development shall start until details for the disposal of foul sewerage from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul water drainage.
  5. No development shall start until details of a sustainable drainage system which does not involve discharge into the drainage ditch to the northern boundary of the site have been submitted to and approved in writing by the Local Planning Authority. The details shall include a timetable for its implementation and a management/maintenance plan for the lifetime of the development [including the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the effective operation of the sustainable drainage system throughout its lifetime]. The system shall be implemented and thereafter managed and maintained in accordance with the approved details. Reason: To ensure satisfactory drainage for the development.
  6. No development shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping including trees and boundary treatment and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  7. All hard & soft landscaping, tree planting and boundary treatment shall be carried out in accordance with the approved details and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  8. No construction work shall start until a Construction Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Construction work shall only take place in accordance with the approved method statement which shall include: a) location of temporary site buildings, compounds, construction material and plant storage areas used during construction; b) the arrangements for deliveries associated with all construction works, loading/unloading of plant & materials and restoration of any damage to the highway [including vehicle crossovers and grass verges]; c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); f) provision for storage, collection, and disposal of rubbish from the development during construction period; g) measures to prevent mud and dust on the highway during demolition and construction; h) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; and i) temporary lighting; Reason: To limit the impact the development has on the amenity of the locality.
  9. Before development commences a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority detailing: safeguards for fuel and chemical storage and use, to ensure no pollution of the surface water leaving the site; and diagrammatic and written details of construction drainage containing three forms of temporary filtration. These agreed details shall then be implemented prior to construction commencing and be retained throughout construction works. Reason To ensure no impact on the River Itchen SAC from pollution within the construction process.
  10. The development must accord with Arboricultural Report “16810-AIA 2” produced by Ecourban. Tree protection must be addressed as per the Tree Protection Plan enclosed within the report. No excavation or development related works shall commence until evidence has been submitted and approved by the Local Planning Authority that the tree protection measures have been installed, as detailed in the Tree Protection Plan. Once approved, no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the fenced area. Tree protection measures shall be retained in their approved form for the duration of the work. This condition may only be fully discharged upon completion of the proposed development. Reason: To retain and protect the existing trees and hedgerow which form an important part of the amenity of the locality.
  11. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  12. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  13. No driven pilling shall take place on the development hereby permitted. Reason: To protect the amenity of the occupiers of the nearby dwellings.
  14. Prior to the occupation of any dwelling, as built stage SAP data and as built stage water calculator confirming energy efficiency and the predicted internal mains water consumption to achieve the following shall be submitted to and approved in writing by the Local Planning Authority: In respect of energy efficiency, a standard of a 19% improvement of dwelling emission rate over the target emission rate as set in the 2013 Building Regulations In respect of water consumption, a maximum predicted internal mains water consumption of 105 litres/person/day. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality design across the site; in line with the guidance set out in the Government's Ministerial Statement of 25 March 2015 which states that Local Planning Authorities should, from the date of its publication, take into account the government's intentions in the statement [and not set conditions with requirements above a Code level 4 equivalent.
  15. The development hereby permitted shall not be occupied until the parking areas have been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwelling houses as a residences. Reason: To make provision for off street parking for the purpose of highway safety.
  16. Any first floor windows on the side elevations of the dwellings hereby approved shall be obscure glazed to Pilkingtons level 3 or equivalent and be top opening only, unless the lower sill of the windows are positioned at least 1.7 metres above the floor of the room in which they are installed, and shall be retained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  17. No additional or altered windows shall be constructed in either side elevation of Plots 1 and 5 of the development hereby approved. Reason: To protect the amenity and privacy of the adjoining residential properties.
  18. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  19. Note to Applicant: the permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways, HCC call centre number 0845 6035633.
  20. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
  21. In accordance with Appendix C of the Council's adopted Policy Quality Places SPD, the Council requires developers to meet the cost of bins for general and recycling waste. These must be purchased from Direct Services on 023 80688440.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.