ApprovedCouncil status: Decided Permit

Construction of 2no. 4 bed dwellings with associated amenity space, parking, landscaping, bin and cycle storage, following demolition of existing bungalow (resubmission of F/16/78661)

FORMER, 57 UPPER NORTHAM ROAD, HEDGE END, SOUTHAMPTON, SO30 4EA

Eastleigh Borough CouncilReference F/17/80448Full planning

Last published check: 12 Nov 2026, 04:12. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 12 Nov 2026, 04:12 (UK)

  1. DoneReceived26 Apr 2017
  2. DoneValidated23 Jun 2017
  3. ClosedConsultationEnded 28 Jul 2017
  4. Date set by councilTarget decision date18 Aug 2017
  5. DecidedPermit11 Aug 2017

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Period Ends

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Hedge End Wildern
Parish
Hedge End CP
Documents
10 published

Proposal

Construction of 2no. 4 bed dwellings with associated amenity space, parking, landscaping, bin and cycle storage, following demolition of existing bungalow (resubmission of F/16/78661)

Reference
F/17/80448
Ward
Hedge End Wildern
Parish
Hedge End CP
Agent
Mr Mark Muddiman

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • F_17_80448 Final DecisionDecision Notice11 Aug 2017View
  • F_17_80448 PL_Report DEL Planning ApplicationOfficer Report11 Aug 2017View
  • Parish ResponseParish Response14 Jul 2017View
  • Consultee Response_F-17-80448Consultee Response12 Jul 2017View
  • Elevations Plan (1914391)Elevations Plan25 Apr 2017View
  • Block Plan (1914385)Block Plan25 Apr 2017View
  • Survey Plan (1914386)Survey Plan25 Apr 2017View
  • Floor Plan (1914388)Floor Plan25 Apr 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
F_17_80448 Final Decision
Planning conditions
  1. The development hereby permitted shall be implemented in accordance with the following plans numbered: Loc 1, 16/UNR/03/B, 16/UNR/04/B, 16/UNR/05/B & 16/UNR/06B. Reason: For the avoidance of doubt and in the interests of proper planning.
  2. The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
  3. Notwithstanding that shown on the approved plans, no development shall start until details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.
  4. Prior to commencement, details of how the approved dwellings will achieve Code level 4 equivalent requirements for energy and water (or equivalent requirements that are set out in national legislation or policy), with reference to design stage SAP data and the BRE water calculator, shall be submitted to, and approved in writing by, the Local Planning Authority. No dwelling shall be occupied until written confirmation that these works have been completed, and the ‘as built’ stage SAP data and a confirmation of the water calculation, has been submitted for that dwelling. Reason: To ensure the development meets the requirements of the national technical standards for energy and water consumption in residential development.
  5. No development shall start until details of the access including any footway and verge crossing have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the approved details have been fully implemented unless agreed in writing by the Local Planning Authority. Reason: To ensure satisfactory vehicular access.
  6. No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by demolition and construction; b) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway including vehicle crossovers and grass verges; d) measures to prevent mud and dust on the highway during demolition and construction; and e) the parking of vehicles of site operatives and visitors. Reason: To limit the impact the development has on the amenity of the locality
  7. No development shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping including trees and boundary treatment and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  8. All hard & soft landscaping, tree planting and boundary treatment shall be carried out in accordance with the approved details and to the appropriate British Standard. For a period of 5 years after planting, any trees or plants which are removed, die or become seriously damaged or defective, shall be replaced as soon as is reasonably practicable with others of the same species, size and number as originally approved in the landscaping scheme. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.
  9. No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
  10. No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.
  11. The roof lights at first floor level on the eastern and western side elevations of both approved dwellings shall be positioned at least 1.7 metres above the floor level of the room/s in which they are installed. And shall be permanently maintained in that condition. Reason: To protect the amenity and privacy of the adjoining residential properties.
  12. Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] [England] Order 2015 or any order revoking and re-enacting that Order with or without modification, no development permitted by Classes A & B of Part 1 of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenity of the adjoining residential properties.
  13. The new access shall not be brought into use until the existing site access has been stopped up and abandoned and the footway/verge/crossing has been reinstated in accordance with details to be approved by the Local Planning Authority in conjunction with the Highway Authority. Reason: To ensure that there is only one vehicular access to the property and in the interests of visual amenity.
  14. The development hereby permitted shall not be occupied until the parking areas have been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwelling house as a residence. Reason: To make provision for off street parking for the purpose of highway safety.
  15. Note to Applicant: This permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways, HCC call centre number 0845 6035633.
  16. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  17. Note to Applicant: Please be aware that Conditions 3, 4, 5, 6 & 7 have already been discharged under reference F/16/78661.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.