(1) The development hereby permitted shall be implemented in accordance with the following plans numbered: WG135-100-01 Rev P1 - location plan WG135-100-03 Rev P2 - site plan WG135-100-06 Rev P2 - floor plans and elevations proposed WG135-100-07 Rev P2 - sections and street elevation proposed Reason: For the avoidance of doubt and in the interests of proper planning.
(2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(3) The materials to be used must match as closely as possible, in type, colour and texture those listed in Section 9 of the application form and the annotated materials schedule on approved plan WG135 100-06 Rev P2. Reason: To ensure a satisfactory visual relationship of the new development to the existing.
(4) No construction or demolition work shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) measures to control the emission of dust and dirt generated by demolition and construction works, including measures to prevent mud on the highway; b) a scheme for controlling noise and vibration from demolition and construction activities; c) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway including vehicle crossovers and grass verges. Reason: To limit the impact the development has on the amenity of the locality
(5) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council's website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.