ApprovedCouncil status: Decided Permit

Construction of 1no. 2 bed bungalow, following demolition of existing outbuilding (amendment to F/16/78330)

QUOB COTTAGE, QUOB LANE, WEST END, SOUTHAMPTON, SO30 3HN

Eastleigh Borough CouncilReference F/16/79715Full planning

Last published check: 13 Nov 2026, 21:03. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 13 Nov 2026, 21:03 (UK)

  1. DoneReceived12 Dec 2016
  2. DoneValidated12 Dec 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date6 Feb 2017
  5. DecidedPermit6 Feb 2017

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
West End North
Parish
West End CP
Documents
10 published

Proposal

Construction of 1no. 2 bed bungalow, following demolition of existing outbuilding (amendment to F/16/78330)

Reference
F/16/79715
Ward
West End North
Parish
West End CP
Agent
Mr P Ashton - Paul Ashton Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Decision Notice (1873099)Decision Notice6 Feb 2017View
  • Officer Report (1873103)Officer Report6 Feb 2017View
  • Consultees Response (1872331)Consultees Response3 Feb 2017View
  • Consultees Response (1869397)Consultees Response31 Jan 2017View
  • Consultees Response (1862455)Consultees Response18 Jan 2017View
  • Location Plan (1847883)Location Plan12 Dec 2016View
  • Site Layout Plan (1847889)Site Layout Plan12 Dec 2016View
  • Plans (1847884)Plans12 Dec 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1873099)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 270/1037-06 Rev A, 270/1037-07 Rev A, 270/1037-08 Rev A. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) No development shall start until details and samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure a satisfactory visual appearance in the interest of the amenities of the area.

    (3) Details - materials samples

  4. (4) No work shall commence on site until the following has been submitted to, and approved in writing by the Local Planning Authority: (a) A report of a site investigation documenting the ground conditions of the site and incorporating chemical and gas analysis identified as appropriate by the Preliminary Investigation in accordance with BS10175:2011+A1 2013 and BS8576:2013, and, unless otherwise agreed with the Local Planning Authority; (b) A detailed site specific scheme for remedial works and measures to be undertaken to avoid the risk from contaminants and/or gases when the site is developed and proposals for future maintenance a and monitoring. Such a scheme shall include nomination of a competent person to oversee the implementation of the works. Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
  5. (5) The development hereby permitted shall not be occupied/brought into use until there has been submitted to the local planning authority verification by the competent person approved under the provisions of the above condition 4(b) that any remediation scheme required and approved under the provisions of the above condition 4(b) has been implemented in full in accordance with the approved details (unless varied with the written permission of the local planning authority in advance of implementation). Unless agreed in writing with the local planning authority such verification shall comply with the guidance contained in CLR11 and EA guidance for the safe development of housing on land affected by contamination - R&D Publication 66:2008. Typically such a report would comprise:- (a) A description of the site and its background, and summary of relevant site information (b) A description of the remediation objectives and redial works carried out (c) Verification data including - sample locations/ analytical results, as built drawings of the implemented scheme, photographs of the remediation works in progress, etc (d) Certificates demonstrating that imported and /or material left in situ is free from contamination. Thereafter the scheme shall be monitored and maintained in accordance with the approved scheme under condition 4(b). Reason: To minimise the risk from land contamination for the safety of the property’s occupiers.
  6. (6) Development shall be build in accordance with the recommendations detailed within - Environmental Noise Impact Assessment - ref SA-4274 - Feb 2016 - Sound Advice. All works, which form part of this scheme approved by the Local Planning Authority, must be completed before any of the permitted dwellings are occupied (unless agreed by the Local Planning Authority) The scheme shall be fully implemented, unless varied with the written permission of the Local Planning Authority in advance of implementation. Reason: To protect the amenities of the occupiers of the dwelling.
  7. (7) No construction or demolition shall take place except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (7) Construction hours

  8. (8) The burning of materials obtained by site clearance or from any other source must not take place without the prior written consent of the Local Planning Authority. Reason: To protect the amenities of the occupiers of nearby properties.

    (8) No burning

  9. (9) Notwithstanding the provisions of the Town and Country Planning [General Permitted Development] Order 2015 [or any order revoking and re-enacting that Order with or without modification], no development permitted by Classes [A, B & E] of Part [1] of Schedule 2 of the order shall be carried out without the prior written consent of The Local Planning Authority. Reason: To protect the amenities of the locality and to maintain a good quality environment.

    (9) Dwelling - no permitted development

  10. (10) No development shall start until a landscaping scheme has been submitted to and approved in writing by the Local Planning Authority. The scheme shall cover all hard & soft landscaping [including trees and boundary treatment] and shall provide details of timings for all landscaping and any future maintenance. The works shall be carried out in accordance with the approved plans and to the appropriate British Standard. Reason: In the interests of the visual amenity of the locality and to safeguard the amenities of neighbouring residents.

    (10) Landscaping scheme - pre start

  11. (11) No development shall start in respect of the dwelling hereby permitted until details for the sustainable disposal of surface water and disposal of foul sewerage from the development have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
  12. (12) Prior to commencement, details of how the approved dwellings will achieve Code level 4 equivalent requirements for energy and water [or equivalent requirements that are set out in national legislation or policy], with reference to design stage SAP data and the BRE water calculator, as well as evidence that the relevant ESD requirements 2-8 inclusive of the Council’s adopted Environmentally Sustainable Development SPD are being met shall be submitted to, and approved in writing by, the Local Planning Authority. No dwelling shall be occupied until written confirmation that these works have been completed, and the ‘as built’ stage SAP data and a confirmation of the water calculation, has been submitted for that dwelling. Reason: To ensure the development meets the requirements of the national technical standards for energy and water consumption and the Council’s adopted Environmentally Sustainable Development SPD in residential development.
  13. (13) No development shall start until an Arboricultural Impact Assessment, Method Statement and Tree Protection Plan has been submitted to and approved in writing by the Local Planning Authority. The development must accord with the approved details and to the appropriate British Standard. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.

    (13) Arboricultural Impact Assessment, Method Statement, Tree Survey and protective fencing plan - p

  14. (14) No development shall commence until a site meeting has taken place with the site manager, the retained consulting arboriculturalist and the Tree Services Manager from the Local Planning Authority. Work cannot commence until the Tree Services Manager has inspected and approved the tree protection, ensuring it conforms to the Tree Protection Plan and the Method Statement. Once approved no access by vehicles or placement of goods, chemicals, fuels, soil or other materials shall take place within the fenced area. The fencing shall be retained in its approved form for the duration of the work. All other aspects of the Arboricultural Impact Assessment and Method Statement will be addressed at this meeting including any required changes with final layout of the scheme and the installation of services that may have an impact on trees. This tree condition may only be fully discharged on completion of the development subject to satisfactory written evidence of compliance monitoring by the pre-appointed consulting arboriculturalist. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
  15. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
  16. Note to applicant: In order to comply with condition 14 please resubmit the following information: - Arboricultural Implications Assessment and Method Statement (15) produced by Barell Tree Consultancy dated 24th January 2013 including Tree Protection Plan (ref. 13037-BT1).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.