(1) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.
(1) Start - 3 years
(2) The development hereby permitted shall be implemented in accordance with the following plans numbered: 01, 02, 03, 04, 05, 06, 07, DRAFT 2A-21/10.16/(1). Reason: For the avoidance of doubt and in the interests of proper planning.
(2) Development in accordance with approved plans
(3) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the existing building. Reason: To ensure a satisfactory visual relationship between the new development and the existing.
(3) Materials to match existing
(4) Notwithstanding the submitted tree protection plan, prior to the commencement of the demolition & development, tree protective fencing shall be erected at a minimum distance of 7.5 metres from the base of the tree identified on the plan DRAFT 2A – 21.10.16 (1). No construction, mixing of materials, storage or use of machinery, equipment or materials shall take place within the fenced area. Work cannot commence until suitable evidence has been provided to show that the fencing has been adequately installed and approved by the LPA Officer . The fencing shall be retained for the duration of the work. This tree condition may only be fully discharged on completion of the development subject to satisfactory evidence of compliance. Reason: To retain and protect the existing trees which form an important part of the amenity of the locality.
(5) No development shall start until details for the sustainable disposal of surface water [and disposal of foul sewerage] from the development hereby permitted have been submitted to and approved in writing by the Local Planning Authority. The development shall then accord with the approved details. Reason: To ensure satisfactory provision of foul and surface water drainage.
(5) Details - Sustainable disposal of surface and foul water - pre start
(6) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.
(6) Construction hours
Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Note to Applicant: A formal application for connection to the public sewerage system is required in order to service this development, please contact Southern Water, Sparrowgrove House Sparrowgrove, Otterbourne, Hampshire SO21 2SW (Tel: 0330 303 0119) or www.southernwater.co.uk. It is the responsibility of the developer to make suitable provision for the disposal of surface water. Part H3 of the Building Regulations prioritises the means of surface water disposal in the order a Adequate soakaway or infiltration system b Water course c Where neither of the above is practicable sewer Southern Water supports this stance and seeks through appropriate Planning Conditions to ensure that appropriate means of surface water disposal are proposed for each development. It is important that discharge to sewer occurs only where this is necessary and where adequate capacity exists to serve the development. When it is proposed to connect to a public sewer the prior approval of Southern Water is required. Due to changes in legislation that came in to force on 1st October 2011 regarding the future ownership of sewers it is possible that a sewer now deemed to be public could be crossing the above property. Therefore, should any sewer be found during construction works, an investigation of the sewer will be required to ascertain its condition, the number of properties served, and potential means of access before any further works commence on site. The applicant is advised to discuss the matter further with Southern Water, Sparrowgrove House Sparrowgrove, Otterbourne, Hampshire SO21 2SW (Tel: 0330 303 0119) or www.southernwater.co.uk
Note to applicant: You are reminded of your duties under the Party Wall Act 1996. This requires a building owner to notify and obtain formal agreement from adjoining occupier(s) where the building owner intends to carry out work which involves: 1. Work involving an existing shared wall with another property; 2. Building on the boundary with a neighbouring property; 3. Excavating near a neighbouring building, and that work falls within the scope of the Act. Procedures under this Act are separate from the need for planning permission and building regulations approval. ‘The Party Wall etc. Act 1996: explanatory booklet’ is available at www.communities.gov.uk.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.