ApprovedCouncil status: Decided Permit

Construction of 2no. two bedroom attached dwellings with amenity space & parking accessed from Woodpecker Way

27 NIGHTINGALE AVENUE, EASTLEIGH, SO50 9JH

Eastleigh Borough CouncilReference F/16/79256Full planning

Last published check: 11 Nov 2026, 19:30. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 11 Nov 2026, 19:30 (UK)

  1. DoneReceived21 Sept 2016
  2. DoneValidated21 Sept 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date16 Nov 2016
  5. DecidedPermit16 Nov 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
Eastleigh South
Parish
Eastleigh
Documents
7 published

Proposal

Construction of 2no. two bedroom attached dwellings with amenity space & parking accessed from Woodpecker Way

Reference
F/16/79256
Ward
Eastleigh South
Parish
Eastleigh
Agent
Mr C Shipperley - Anders Roberts & Asociates

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Decision Notice (1834742)Decision Notice16 Nov 2016View
  • Officer Report (1834746)Officer Report16 Nov 2016View
  • Plans (1831967)Plans11 Nov 2016View
  • Consultees Response (1819241)Consultees Response19 Oct 2016View
  • Plans (1804825)Plans19 Sept 2016View
  • Application Form (1804820)Application Form19 Sept 2016View
  • Elevations and Floor Plan (1804824)Elevations And Floor Plan19 Sept 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1834742)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: 8573/300, 8573/301 & 3573/302. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) No development shall start until the following details have been submitted to and approved in writing by the Local Planning Authority: a) details of the materials to be used in the construction of the external surfaces of the development; b) the alignment, height and materials of all walls, fences and other means of enclosure; c) the details and layout of foul sewers and sustainable surface water drains; d) plans including cross sections to show proposed ground levels and their relationship to existing levels both within the site and on immediately adjoining land; and e) a landscaping scheme to cover all hard and soft surfacing, trees and planting. The development shall not be occupied until the approved details have been fully implemented. Reason: To limit the impact the development has on the locality.

    (3) Details - pre start

  4. (4) No development shall start until a Method Statement has been submitted to, and approved in writing by, the Local Planning Authority. Demolition and construction work shall only take place in accordance with the approved method statement which shall include: a) location of temporary site buildings, compounds, construction material and plant storage areas used during demolition and construction; b) the arrangements for deliveries associated with all construction works, loading/ unloading of plant & materials and restoration of any damage to the highway including vehicle crossovers and grass verges; c) the parking of vehicles of site operatives and visitors; d) measures to control the emission of dust and dirt generated by demolition and construction; e) a scheme for controlling noise and vibration from demolition and construction activities (to include piling); f) provision for storage, collection, and disposal of rubbish from the development during construction period; and g) measures to prevent mud and dust on the highway during demolition and construction. Reason: To limit the impact the development has on the amenity of the locality

    (4) No construction/demolition until Method Statement approved

  5. (5) Prior to the occupation of the approved dwellings, as built stage SAP data and as built stage water calculator confirming energy efficiency and the predicted internal mains water consumption to achieve the following shall be submitted to and approved in writing by the Local Planning Authority. In respect of energy efficiency, a standard of a 19% improvement of dwelling emission rate over the target emission rate as set in the 2013 Building Regulations. In respect of water consumption, a maximum predicted internal mains water consumption of 105 litres/person/day. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality design across the site; in line with the guidance set out in the Government’s Ministerial Statement of 25 March 2015 which states that Local Planning Authorities should, from the date of its publication, take into account the government’s intentions in the statement [and not set conditions with requirements above a Code level 4 equivalent].

    (5) Energy and water requirements for new dwellings

  6. (6) No development shall start until details for the on site provision of bin & cycle storage facilities have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the bin & cycle storage has been constructed in accordance with the approved details and thereafter retained and kept available. Reason: To ensure the adequate provision of on site facilities.

    (6) Details - refuse storage - pre start

  7. (7) No development shall start until details of the accesses, including any footway and verge crossing, have been submitted to and approved in writing by the Local Planning Authority. The development shall not be occupied until the approved details have been fully implemented unless agreed in writing by the Local Planning Authority. Reason: To ensure satisfactory vehicular access.

    (7) Details access - pre start

  8. Note to Applicant: the permission does not authorise the undertaking of any works involving excavations in the carriageway, footway or verge. A road opening permit must be obtained from Hampshire Highways, HCC call centre number 0845 6035633.
  9. (8) The development hereby permitted shall not be brought into use until visibility splays of 2.4 metres by 43.0 metres have been provided at the junction of the accesses and the public highway. Nothing over 0.6m in height above the level of the carriageway shall be placed or permitted to remain within the visibility splays. Reason: In the interests of highway safety.

    (8) Provision of visibility splay as stated prior to use starting

  10. (9) The development hereby permitted shall not be occupied until the parking areas for both the proposed dwellings and No.27 Nightingale Avenue have been provided in accordance with the approved plans and thereafter permanently retained and used only for the purpose of accommodating private motor vehicles incidental to the enjoyment of the dwellinghouses as residences. Reason: To make provision for off street parking for the purpose of highway safety.

    (9) Provision of parking prior to occupation

  11. (10) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.

    (10) No burning

  12. (11) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (11) Construction hours

  13. Note to Applicant: It is requested that the building works are carried out considerately to minimise disruption to the occupiers of the neighbouring properties. The council operates a code of best practice, which is available on the council’s website www.eastleigh.gov.uk by following the links to Planning, Guidance on the process, scroll down to Guidance on Aspects of the Planning & Construction Process and select considerate builders advice note.
  14. Note to Applicant: In accordance with Appendix C of the Council’s adopted Policy Quality Places SPD, the Council requires developers to meet the cost of bins for general and recycling waste. These must be purchased from Direct Services on 023 80688440.
  15. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.