ApprovedCouncil status: Decided Permit

Construction of 1no. detached dwelling with raised rear patio, following demolition of existing 1 bed dwelling

HOLMES MANOR, MOORHILL ROAD, WEST END, SOUTHAMPTON, SO30 3AY

Eastleigh Borough CouncilReference F/16/79209Full planning

Last published check: 11 Nov 2026, 20:51. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Status and dates

Last published check: 11 Nov 2026, 20:51 (UK)

  1. DoneReceived9 Sept 2016
  2. DoneValidated9 Sept 2016
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date4 Nov 2016
  5. DecidedPermit3 Nov 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Statutory Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full planning
Ward
West End South
Parish
West End CP
Documents
14 published

Proposal

Construction of 1no. detached dwelling with raised rear patio, following demolition of existing 1 bed dwelling

Reference
F/16/79209
Ward
West End South
Parish
West End CP
Agent
BPS Design Consultants Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

The document list could not be fully refreshed. View the council record for the complete list.

  • Officer Report (1828027)Officer Report3 Nov 2016View
  • Decision Notice (1828025)Decision Notice3 Nov 2016View
  • Consultees Response (1827549)Consultees Response3 Nov 2016View
  • Elevations and Floor Plan (1822921)Elevations And Floor Plan26 Oct 2016View
  • Site Layout Plan (1822923)Site Layout Plan26 Oct 2016View
  • Consultees Response (1822904)Consultees Response26 Oct 2016View
  • Parish Response (1820486)Parish Response20 Oct 2016View
  • Consultees Response (1816453)Consultees Response13 Oct 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Permit
Decision Notice (1828025)
Planning conditions
  1. (1) The development hereby permitted shall be implemented in accordance with the following plans numbered: PL/01, PL/02 Rev B, PL/03 Rev B. Reason: For the avoidance of doubt and in the interests of proper planning.

    (1) Development in accordance with approved plans

  2. (2) The development hereby permitted shall start no later than three years from the date of this decision. Reason: To comply with Section 91 of the Town and Country Planning Act 1990.

    (2) Start - 3 years

  3. (3) The materials to be used in the construction of the external surfaces of the development hereby permitted shall match in type, colour and texture those used on the adjoining dwellings. Reason: To ensure a satisfactory visual relationship between the new development and the existing.

    (3) Materials to match existing

  4. (4) No development shall start until a reptile survey and depending on the results a reptile translocation/ exclusion mitigation and management plan has been submitted to and approved in writing by the Local Planning Authoirity. The development shall then accord with the approved details, which shall follow the standing advice issued by Natural England. Reason: To ensure no harm to reptiles likely to be present on site.
  5. (5) No development shall start until a site meeting has taken place where a representative from the Local Planning Authority has inspected and approved the protective tree fencing. The fencing shall be in accordance with the appropriate British Standard, BS5837:2012 Trees in Relation to design, demolition and construction. Once approved no access by vehicles, storage or use of machinery, equipment or materials shall take place within the fenced area. The fencing shall be retained in its approved form for the duration of the work. Reason - To retain and protect the existing trees which form an important part of the amenity of the locality.

    (5) Plan of tree protection fencing - pre start

  6. (6) The development shall not be occupied until as built stage SAP data and as built stage water calculator confirming energy efficiency and the predicted internal mains water consumption to achieve the following shall be submitted to and approved in writing by the Local Planning Authority: a) In respect of energy efficiency, a standard of a 19% improvement of dwelling emission rate over the target emission rate as set in the 2013 Building Regulations b)In respect of water consumption, a maximum predicted internal mains water consumption of 105 litres/person/day. The development shall not be carried out otherwise than in accordance with the approved details. Reason: To support a comprehensive approach to high quality design across the site
  7. (7) No construction, demolition or deliveries to the site shall take place during the construction period except between the hours of 0800 to 1800 Mondays to Fridays or 0900 to 1300 on Saturdays and not at all on Sundays or Bank Holidays. Reason: To protect the amenities of the occupiers of nearby dwellings.

    (7) Construction hours

  8. (8) No burning of materials obtained by site clearance or any other source shall take place during the demolition, construction and fitting out process. Reason: To protect the amenities of the occupiers of nearby properties.

    (8) No burning

  9. Note to Applicant: In accordance with paragraphs 186 and 187 of the National Planning Policy Framework, Eastleigh Borough Council takes a positive approach to the handling of development proposals so as to achieve, whenever possible, a positive outcome and to ensure all proposals are dealt with in a timely manner.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.